The following messages give you information about NOAA's satellite operations,
including various product changes, upgrades and outages.
Visit often for the latest information affecting data delivery.
      2019         1   2   3   4   5   6   7   8   9   10   11   12   |       2020         1   2   3   4   5   6   7   8   9   10   11   12   |       2021         1   2   3   4   5   6   7   8   9   10   11   12   |       2022         1   2   3   4   5   6   7   8   9   10   11   12   |       2023         1   2   3   4   5   6   7   8   9   10   11   12   |       2024         1   2   3   4   5   6   7   8   9   10   11   |
This page shows the 100 most recent messages. To view older messages, please choose the year and month from the menu above.
Product Outage: Update #1, GOES-16 EXIS Off-point Calibration (impacts EXIS and SUVI data) - Issued: January 31, 2020 2359Z
Administrative: NOAA-18 & 19 UEF Elements, Issued: February 01, 2020 0400Z
Administrative: Update #2: GOES-16 Meso-1 request scheduled for January 30, 2020 - Issued: February 01, 2020 0715Z
Administrative: GOES-16 Meso-1 request scheduled for February 01, 2020 - Issued: February 01, 2020 0725Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February 01, 2020 - Issued: February 01, 2020 0737Z
Product Outage/Anomaly: Intermittent degradation of GOES-16 Volcanic Ash full disk products and their distribution to PDA - Issued: February 01, 2020 1220Z
Product Outage/Anomaly: Update #1: Intermittent degradation of GOES-16 Volcanic Ash full disk products and their distribution to PDA - Issued: February 01, 2020 1457Z
Administrative: GOES-17 for Meso-1 request scheduled for February 01, 2020 - Issued: February 01, 2020 1523Z
Administrative: GOES-17 for Meso-2 request scheduled for February 01, 2020 - Issued: February 01, 2020 1625Z
Product Outage/Anomaly: Intermittent outage of GOES-16 SUVI products and their distribution to PDA and GRB - Issued: February 02, 2020 0045Z
Administrative: Update #1, GOES-16 for Meso-2 request scheduled for February, 2020 - Issued: February 02, 2020 1020Z
Administrative: GOES-17 MDS Request for Meso-1 scheduled for February 02, 2020 - Issued: February 02,2020 2330Z
Product Outage/Anomaly: NOAA-20, NPP and GCOM-W1 Data Delay: Issued February 3, 2020 0415Z
Product Outage/Anomaly: (Update #1) NOAA-20, NPP and GCOM-W1 Data Delay Issued: February 3, 2020 0635Z
Administrative: GOES-16 Meso-1 request scheduled for Febuary 03, 2020 - Issued Febuary 03, 2020 1242Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, Febuary 03, 2020 1257Z
Administrative: Correction: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, Febuary 03, 2020 1321Z
Product Outage: GOES-17 EXIS FOV Mapping Calibration (impacts EXIS and SUVI data. Issued: February 3, 2020 1345Z
Product Outage: GOES-17 EXIS Off Point Calibration (impacts EXIS and SUVI data), Issued: February 3, 2020 1359Z
Product Outage: GOES-17 EXIS Readout Noise Calibration (impacts EXIS data), Issued: February 3, 2020 1406Z
Administrative: Eumetsat Weekly Operations Schedule - Week 06 Issue 3 (Update of Announcement 5580) Issued -February 03, 2020, 1746Z
Product Outage/Anomaly: EMWIN_USRGRP Data Outage - Issued: February 04, 2020 0227Z
Product Outage/Anomaly-Update #1: EMWIN_USRGRP Data Outage - Issued: February 04, 2020 0243Z
Product Outage/Anomaly-Update #2: EMWIN_USRGRP Data Outage - Issued: February 04, 2020 0348Z
Administrative: NOAA-18 & 19 UEF Elements, Issued: February 04, 2020 0400Z
Administrative: GOES-16 Meso-2 request scheduled for February 04, 2020 - Issued Febuary 04, 2020 0955Z
Administrative: GOES-16 Meso-1 request scheduled for February 04, 2020 - Issued February 04, 2020 1016Z
Product Outage/Anomaly-Update #3: EMWIN_USRGRP Data Outage - Issued: February 04, 2020 1127Z
Administrative: Update #6: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, February 04, 2020 1242Z
SARSAT Outage/Anomaly: SARSAT Alaska 2 Low Earth Orbit (LEO) Ground Station Offline, Issued: February 04, 2020 1507Z
Product Outage/Anomaly: NDE is not ingesting any products, Issued: February 04, 2020 1708Z
Administrative: Planned NOAA-20 VIIRS Lunar Calibration Roll Maneuver Scheduled for February 5, 2020, Issued :February 4, 2020 1802Z
Administrative: Planned S-NPP VIIRS Lunar Calibration Roll Maneuver Scheduled for February 5, 2020, Issued: February 4, 2020 1813Z
Product Outage/Anomaly: Update #1: NDE is not ingesting any products, Issued: February 04, 2020 1843Z
Administrative: Update #1: GOES-16 Meso-2 request scheduled for February 04, 2020 - Issued February 04, 2020 1900Z
Administrative: Metop-C In Plane slow down Drift Maneuver Scheduled for February 5, 2020 Issued: February 4, 2020 2123Z
Administrative: GOES-16 MDS Request for Meso-1 scheduled for February 05, 2020 - Issued: February 05, 2020 0226Z
Administrative: GOES-16 MDS Request for Meso-1 scheduled for February 05, 2020 - Issued: February 05, 2020 0230Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February 05, 2020 - Issued: February 05, 2020 0637Z
Product Outage/Anomaly: NDE is not ingesting any products, Issued: February 05, 2020 0735Z
Administrative: GOES-16 MDS Request for Meso-1 scheduled for February 05, 2020 - Issued: February 05, 2020 0756Z
Product Outage/Anomaly: Polar GAC Data Loss - Issued February 05, 2020 0855Z
Product Outage/Anomaly: (Update#1) Polar GAC Data Loss - Issued February 05, 2020 01043Z
Administrative: GOES-17 MDS Request for Meso-1 scheduled for February 05, 2020 - Issued: February 05,2020 1225Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, February 05, 2020 1440Z
Administrative: GOES-16 and GOES-17 ABI Lunar Trending Calibration Scans scheduled for February 10-14, 2020, Issued: February 5, 2020 1515Z
Product Outage Anomaly: Update #1 Jason-3 is in Safe Hold Mode - Issued February 05, 2020 1527Z
Administrative: Critical Weather Day has been declared, Issued: February 05, 2020 1550Z
Product Outage/Anomaly Delay of Data: NPP Rev. 42877 and 42878: Issued February 05, 2020 1552Z
Administrative: Eumetsat Weekly Operations Schedule - Week 06 Issue 5 (Update of Announcement 5573) - Issued: February 05 , 2020 1620Z
Administrative: Update #1 Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, February 05, 2020 1635Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February 05, 2020 - Issued: February 05, 2020 1848Z
Subject: Administrative: Update #1 - NDE System Upgrade scheduled for February 19th, 2020 Issued: February 5, 2020 2020 UTC
Product Outage Anomaly: Jason-3 is in Safe Hold Mode - Issued February 05, 2020 2216Z
Product Outage/Anomaly: (Update#2) Polar GAC Data Loss - Issued February 05, 2020 2356Z
Product Outage/Anomaly Update #1 Delay of Data: NPP Rev. 42877 and 42878: Issued February 06, 2020 0004Z
Administrative: GOES-16 MDS Request for Meso-1 scheduled for February 06, 2020 - Issued: February 06, 2020 0128Z
Product Outage/Anomaly: N20 Data Delay, Issued: February 06, 2020 0722Z
Product Outage/Anomaly: Polar GAC Data Delay - Issued February 06, 2020 0751Z
Product Outage/Anomaly: Update #1 - Polar GAC Data Delay - Issued February 06, 2020 1100Z
Administrative: Update #1 GOES-16 MDS Request for Meso-2 scheduled for February 05, 2020 - Issued: February 06, 2020 1111Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February 06, 2020 - Issued: February 06, 2020 1117Z
Administrative: GOES-17 MDS Request for Meso-1 scheduled for February 06, 2020 - Issued: February 06,2020 1226Z
Administrative:_Himawari-8 Weekly Special Satellite Operations Schedule__Issued:_February 6, 2020_1500 UTC
Administrative: Eumetsat Weekly Operations Schedule - Week 07 - Issued: February 06 , 2020 1630Z
Administrative: Update #1 - GOES-16 MDS Request for Meso-1 scheduled for February 06, 2020 - Issued: February 06, 2020 1712Z
Administrative: GOES-16 MDS Request for Meso-1 scheduled for February 06, 2020 - Issued: February 06, 2020 1716Z
Product Outage/Anomaly: GOES-17 ABI L1b Band 10 and derived products delivered to AWIPS, GRB, and PDA - Issued: February 06, 2020 1836Z
Product Outage/Anomaly: GOES 17 - All ABI L1b and derived products delivered to GRB, PDA - Issued February 06, 2020 2238Z
Product Outage/Anomaly:Update#1 N20 Data Delay, Issued: February 07, 2020 0010Z
Product Outage/Anomaly: WALLOPS M3 HRPT rev. 06493 Data Lost. - Issued: February 07, 2020 0210Z
Administrative: Update#1 GOES-16 MDS Request for Meso-2 scheduled for February 06, 2020 - Issued: February 07, 2020 0545Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February 07, 2020 - Issued: February 07, 2020 1315Z
Product Outage/Anomaly: WALLOPS M3 HRPT rev. 06500 Data Lost. - Issued: February 07, 2020 1338Z
Administrative: DSCOVR Space Weather Data return to Operations on March 2, 2020 Issued: February 7, 2020 1430 UTC
Administrative: Eumetsat Weekly Operations Schedule - Week 07 Issue 2 (Addition of Announcement 5637) - Issued: February 07, 2020 1445Z
Administrative: Update #1, Critical Weather Day has been declared, Issued: February 07, 2020 1821Z
Product Outage Anomaly: Update #1, Jason-3 is in Safe Hold Mode - Issued February 07, 2020 1919Z
Administrative: GOES-16 MDS Request for Meso-1 scheduled for February 09, 2020 - Issued: February 09, 2020 1040Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February 09 2020 - Issued: February 09 2020 1430Z
N20 Data Delay for McMurdo Contact 11546
IProduct Outage/Anomaly: DPS Experiencing Data Delays for N20 issued February 10,2020 0745z
Product Outage/Anomaly Update #1: IDPS Experiencing Data Delays for N20 issued February 10,2020 0830Z
Administrative: GOES-16 Meso-1 request scheduled for February 10,2020 - Issued: February 10,2020 0840Z
Product Outage/Anomaly:No AUTOSNOW files received on IDPA/ No ANC files received on IDPC; issued February 10,2020 1015Z
Administrative: Critical Weather Day has been declared, Issued: February 10, 2020 1147Z
Product Outage/Anomaly Update #2: IDPS Experiencing Data Delays for N20-Issued: February 10, 2020 1405Z
Administrative: Eumetsat Weekly Operations Schedule - Week 07 Issue 3 (Announcements: Addition of 5641, Update of 5475)-Issued: February 10, 2020 1549Z
Product Outage/Anomaly: Degradation of GOES-16 ABI Band 2 Meso-2 and derived products and their distribution to AWIPS, PDA and GRB- Issued: February 10, 2020 1734Z
Administrative: GOES-17 Meso-2 request scheduled for February 09, 2020 - Issued: February 09, 2020 1835Z
Administrative: (Correction) GOES-17 Meso-2 request scheduled for February 10, 2020 - Issued: February 10, 2020 1835Z
Product Outage/Anomaly: Degradation and outage of GOES-16 ABI Band 10 Meso-2 and derived products and their distribution to AWIPS, PDA and GRB- Issued: February 10, 2020 2001Z
Product Outage/Anomaly Update #3: IDPS Experiencing Data Delays for N20-Issued: February 10, 2020 2021Z
Product Outage/Anomaly-Update #4: IDPS Experiencing Data Delays for N20-Issued: February 10, 2020 2045Z
Administrative: GOES-15 (GOES-West) East/West Station Keeping Maneuver scheduled for February 12, 2020 - Issued February 10, 2020 2135 UTC
Administrative: Update #1: GOES-16 MDS Request for Meso-2 scheduled for February 09 2020 - Issued: February 11, 2020 0848Z
Administrative: Critical Weather Day has been declared, Issued: February 11, 2020 1212Z
Administrative: (Update #1) Critical Weather Day has been declared, Issued: February 11, 2020 1235Z
Possible Product Anomaly/Outage: GOES-16, GOES-17 All products delivered to AWIPS, GRB, and PDA - Issued: February 11, 2020 1548Z
Subject: Administrative: NOAA-18, 19, MetOp-A/2, MetOp-B/1, & MetOp-C/3 AVHRR, Monthly Visible Calibration Update, 11 February 2020 - Issued: 11 February 2020 1621Z
Product Outage/Anomaly NOAA-20, NPP and GCOM-W1 Data Delay Issued: February 11, 2020 2237Z
Administrative: Metop-A In-Plane Maneuver - February 11, 2020. Issued 2259Z
Product Outage/Anomaly: Update #1: NOAA-20, NPP and GCOM-W1 Data Delay Issued: February 12, 2020 0142Z
Product Outage/Anomaly: HRPT M-03 Rev 06564 WA Data loss Issued: February 12, 2020 0259Z
Administrative: GOES-16 Meso-1 request scheduled for February 12, 2020 - Issued: February 12, 2020 0310Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February 12, 2020 - Issued: February 12, 2020 0745Z
Administrative: Update #2: GOES-16 MDS Request for Meso-2 scheduled for February 12 2020 - Issued: February 12, 2020 1140Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, February 12, 2020 1255Z
Administrative: Critical Weather Day has been declared, Issued: February 12, 2020 1320Z
Administrative: (Correction) Critical Weather Day has been declared, Issued: February 12, 2020 1340Z
Administrative GOES-17 (GOES-West) ABI Cooling Timeline Mode 3 Engineering Test Scheduled for February 19, 2020 Issued: February 12, 2020 1610 UTC
Administrative: (Update #1) GOES-16 Meso-1 request scheduled for February 12, 2020 - Issued: February 12, 2020 1800Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February 13, 2020 - Issued: February 13, 2020 0055Z
Administrative: NOAA-18 & 19 UEF Elements, Issued: February 13, 2020 0400Z
Product Outage/Anomaly: No AUTOSNOW files received on IDPA (Primary string) or IDPC (Backup string)Issued: February 13, 2020 1015Z
Product Outage/Anomaly: Metop-B Antarctic Data Acquisition - Issued February 13, 2020 1030Z
SARSAT Outage/Anomaly: GU1 LEO Ground Station Offline, Issued: February, 13, 2020 1148Z
Administrative:Update#1 Critical Weather Day has been declared, Issued: February 13, 2020 1224Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, February 13, 2020 1300Z
Administrative:_Himawari-8 Weekly Special Satellite Operations Schedule__Issued:_February 13, 2020_1500 UTC
Product Outage Anomaly: Update #2, Jason-3 is in Safe Hold Mode - Issued February 13, 2020 1528Z
Product Outage/Anomaly Update#1 Metop-B Antarctic Data Acquisition - Issued February 13, 2020 1603Z
Administrative: Eumetsat Weekly Operations Schedule - Week 08 -Issued: February 13, 2020 1637Z
Product Outage/Anomaly: NPP Data Delay - Issued February 14, 2020 0100Z
SARSAT Outage/Anomaly: - Hawaii 2 LEO Ground Station Offline, Issued: February, 14, 2020 0119Z
Product Outage/Anomaly: Update #1 - NPP Data Delay - Issued February 14, 2020 0315Z
SARSAT Outage/Anomaly: Update #1 - Hawaii 2 LEO Ground Station Offline, Issued: February, 14, 2020 0525Z
Product Outage Anomaly: GOES-15 West Data Outage - Issued February 14, 2020 1040Z
Product Outage/Anomaly: Correction - GOES-15 West Data Outage - Issued February 14, 2020 1139Z
Product Outage/Anomaly: IDPA, OPS string experiencing multiple failures, Issued February 14, 2020 1545Z
Administrative: GOES-17 Meso-1 scheduled for February 14, 2020 - Issued: February 14, 2020 1725Z
Product Outage/Anomaly: Update #1 - GOES-15 West Data Outage - Issued February 14, 2020 1735Z
Product Outage/Anomaly:Update#1 IDPA, OPS string experiencing multiple failures, Issued February 14, 2020 1807Z
Products Outage/Anomaly OMI Data Outage, Issued February 14, 2020 1820Z
Products Outage/Anomaly: Metop-C In Plane slow down Drift Maneuver end. Issued February 14, 2020 2235Z
Product Outage/Anomaly: Metop-A MHS Channel 2 Failure Due to Noise Increase. Issued February 14, 2020 2258Z
Administrative: Critical Weather Day has been declared, Issued: February 14, 2020 2319Z
Administrative: NOAA-18 & 19 UEF Elements, Issued: February 15, 2020 0400Z
Administrative: GOES-17 Meso-1 scheduled for February 15, 2020 - Issued: February 15, 2020 1830Z
Administrative: GOES-17 Meso-2 scheduled for February 16, 2020 - Issued: February 16, 2020 2105Z
Administrative : Correction on Center Point. GOES-17 Meso-2 scheduled for February 16, 2020 - Issued: February 16, 2020 2137Z
Administrative: Update#1: Critical Weather Day has been declared, Issued: February 16, 2020 2150Z
Administrative: GOES-17 Meso-1 scheduled for February 17, 2020 - Issued: February 17, 2020 0437Z
Administrative: GOES-17 Meso-1 scheduled for February 17, 2020 - Issued: February 17, 2020 0828Z
Administrative: Update #1 - GOES-17 Meso-2 scheduled for February 17, 2020 - Issued: February 17, 2020 0932Z
Administrative: GOES-17 Meso-2 scheduled for February 16, 2020 - Issued: February 16, 2020 0938Z
Administrative: GOES-17 Meso-1 scheduled for February 17, 2020 - Issued: February 17, 2020 2013Z
Administrative: Correction: GOES-17 Meso-1 scheduled for February 17, 2020 - Issued: February 17, 2020 2214Z
Administrative: GOES-16 Meso-1 scheduled for February 18, 2020 - Issued: February 18, 2020 0124Z
Administrative: Correction: GOES-16 Meso-1 scheduled for February 18, 2020 - Issued: February 18, 2020 0135Z
Administrative: NOAA-18 & 19 UEF Elements, Issued: February 18, 2020 0434Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the CBU Backup site, February 18, 2020 1637Z
Administrative: Eumetsat Weekly Operations Schedule - Week 08 Issue 2 (Addition of Announcements 5660 and 5661)-Issued: February 18, 2020 1655Z
Administrative: S-NPP VIIRS Emissive Band Calibration Issued: February 18, 2020 2020Z
Administrative: GOES-16 Meso-2 scheduled for February 18, 2020 - Issued: February 18, 2020 2152Z
Administrative: Critical Weather Day has been declared, Issued: February 19, 2020 0000Z
Administrative: GOES-17 Meso-2 scheduled for February 19, 2020 - Issued: February 19, 2020 0121Z
Administrative: GOES-17 Meso-1 scheduled for February 19, 2020 - Issued: February 19, 2020 1129Z
Administrative: Update #2 - NDE System Upgrade scheduled for February 20, 2020 Issued: February 19, 2020 1140 UTC
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the CBU Backup site, February 19, 2020 1240Z
Administrative Update GOES-17 (GOES-West) ABI Cooling Timeline Mode 3 Engineering Test Scheduled for February 19-20, 2020 Issued: February 19, 2020 1327_UTC
Administrative: NOAA 20 PRODUCT OUTAGE/DELAY Issued :February 19, 2020 1357Z
Administrative: GOES-16/17 software build (DO.09.00.00) will implemented into operations on February 19, 2020 , Issued: February 19, 2020 1500 UTC
Administrative: Update #1 - GOES-15 supplemental operations extended to March 2, 2020, Issued: February 19, 2020 1920 UTC
Administrative: Update #4 - GOES-14 supplemental space weather instrument operations will end on March 2, 2020, Issued: February 19, 2020 1925 UTC
Administrative: GOES-16 Meso-2 request scheduled for February 20, 2020 - Issued: February 20, 2020 0248Z
Administrative: NOAA-18 & 19 UEF Elements, Issued: February 20, 2020 0405Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the CBU Backup site, February 20, 2020 1342Z
Administrative:_Himawari-8 Weekly Special Satellite Operations Schedule__Issued:_February 20, 2020_1520 UTC
Administrative: Eumetsat Weekly Operations Schedule - Week 9, Issued: February 20, 2020 1618Z
Administrative: Critical Weather Day has been declared Issued: February 20, 2020 1911Z
Administrative: GOES-17 Meso-1 scheduled for February 20, 2020 - Issued: February 20, 2020 1922Z
Product Outage/Anomaly: Legacy Production Job Scheduler Outage and Delay in Legacy Product Delivery: Issued February 21, 2020 0025Z
Weekly Operations Schedule - Week 9 Issue 2 (update announcement 5637, addition of announcement 5678 Issued : February 21,2020 1457Z
Administrative: GOES-17 Meso-2 scheduled for February 21, 2020 - Issued: February 21, 2020 1630Z
Administrative:Update#1 GOES-17 Meso-2 scheduled for February 21, 2020 - Issued: February 21, 2020 1729Z
Product Outage: GOES-16 - All products delivered to PDA -Issued: Feb 21, 2020 1750Z
Administrative: Update #1 GOES-17 Meso-1 scheduled for February 21, 2020 - Issued: February 21, 2020 1835Z
Product Outage: (Update #1) GOES-16 - All products delivered to PDA -Issued: Feb 21, 2020 2013Z
Administrative: Update #1 - GOES-16/17 software build (DO.09.00.00) was implemented into operations on February 21, 2020 , Issued: February 21, 2020 2031 UTC
Administrative: GOES-17 (GOES-West) ABI Mode 3 Cooling Timeline Implementation – Scheduled to Commence February 26, 2020, Issued: February 21, 2020 2100 UTC
Administrative: GOES-16 Meso-2 request scheduled for February 22, 2020 - Issued: February 22, 2020 1256Z
Administrative:Update#2 - GOES-17 Meso-2 scheduled for February 21, 2020 - Issued: February 22, 2020 1313Z
Administrative: Update#1 Critical Weather Day has been declared Issued: February 23, 2020 0414Z
Administrative: Eumetsat Alert Message: February 23, 2020: GDS-Metop-C,GDS-Multi-Metop,SAF Service Issued: February 23, 2020 0950Z
Administrative: GOES-17 Meso-1 scheduled for February 23, 2020 - Issued: February 23, 2020 1032Z
Administrative: GOES-16 Meso-1 scheduled for February 23, 2020 - Issued: February 23, 2020 1253Z
Administrative: GOES-16 Meso-2 request scheduled for February 24 - Issued: February 24, 2020 1247Z
Termination of Green Vegetation Health Products (VHP) with 4km resolution from NPP and NOAA-20 on April 30, 2020 - Issued: February 24, 2020 1354Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, February 24, 2020 1425Z
Product Outage/Anomaly: Degradation and loss of GOES-16 products and their distribution to PDA - Issued: February 24, 2020 1653Z
Product Outage: (Update #2) GOES-16 - All products delivered to PDA - Issued: Feb 24, 2020 1710Z
Product Outage/Anomaly: Degradation and loss of GOES-17 products and their distribution to PDA - Issued: February 24, 2020 1720Z
Administrative: Update #1- GOES-17 (GOES-West) ABI Mode 3 Cooling Timeline Implementation – Scheduled to Commence February 26, 2020, Issued: February 24, 2020 2145 UTC
SARSAT Outage/Anomaly: FL1 LEO Ground Station Offline, Issued: February 24, 2020 2340Z
Administrative: GOES-16 Meso-2 request scheduled for February 25, 2020 - Issued: February 24, 2020 0227Z
SARSAT Outage Anomaly Update Final Update FL1 LEO Ground Station Offline Issued: February 24, 2020 2340Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, February 25, 2020 1310
Weekly Operations Schedule - Week 9 Issue 3 (addition of announcement 5681) Issued : February 25,2020 1358Z
Product Outage/Anomaly: GOES-16 SUVI IP CSC Task Update (Impacts SUVI data) - Issued: February 25, 2020 1455Z
SARSAT Outage/Anomaly: GU2 LEO Ground Station Offline, Issued: February 25, 2020 2000Z
Administrative Update GOES-17 (GOES-West) ABI Mode 3 Cooling Timeline Implementation Scheduled to Commence February 26, 2020 Issued February 26, 2020 0110 UTC
Administrative Update GOES-17 (GOES-West) ABI_Mode 3 Cooling Timeline Implementation Scheduled to Commence February 26, 2020 Issued: February 26, 2020_0715Z
Administrative:NOAA 20 PRODUCT OUTAGE/DELAY Issued: February 26,2020 0740Z
Product Outage/Anomaly: DMSP Data Lost Issued:February 26, 2020 1515Z
SARSAT Outage Anomaly Update Final Update Guam 2 LEO Ground Station Offline Issued: February 26, 2020 1525Z
Product Outage/Anomaly: NOAA distribution Himawari-8 data outage, Issued February 26, 2020 1650Z
Administrative: GOES-16 Meso-1 scheduled for February 26, 2020 - Issued: February 26, 2020 1745Z
Administrative: GOES-16 Meso-2 request scheduled for February 26, 2020 - Issued: February 26, 2020 1748Z
Product Outage/Anomaly NOAA-20 ATMS Science Data: Issued February 26, 2020 1800Z
Product Outage/Anomaly: Update #1 NOAA distribution Himawari-8 data outage, Issued February 26, 2020 1925Z
Administrative: GOES-16 MDS Request for Meso-1 scheduled for February 27, 2020 - Issued: February 27, 2020 0328Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February 27, 2020 - Issued: February 27, 2020 0339Z
Administrative: NOAA-18 & 19 UEF Elements, Issued: February 27, 2020 0400Z
Administrative: Product Distribution and Access (PDA) Anomaly affecting Communications to/from the PDA environment, Issued: February 27, 2020 1318Z
Administrative:_Himawari-8 Weekly Special Satellite Operations Schedule__Issued:_February 27, 2020_1545 UTC
Product Outage/Anomaly: NPP Data Delay - Issued: February 27, 2020 1834Z
Product Outage/Anomaly: N20 Data Delay - Issued: February 27, 2020 1900Z
SARSAT Outage/Anomaly: Update #1 - Final Update - Florida Medium Earth Orbit (MEO) Ground Station Comm Outage, Issued: February 27, 2020 1921Z
Product Outage/Anomaly: Update #1 NPP Data Delay - Issued: February 27, 2020 1955Z
Product Outage/Anomaly: DMSP Data Loss - Issued: February 27, 2020 2225Z
Product Outage/Anomaly: DMSP Data Loss - Issued: February 28, 2020 0144Z
Product Outage/Anomaly: DMSP Data Loss - Issued: February 28, 2020 0247Z
Administrative: NOAA-18 & 19 UEF Elements, Issued: February 28, 2020 0400Z
Administrative: Update #5 - GOES-14 supplemental space weather instrument operations will end on March 2, 2020, Issued: February 28, 2020 1405 UTC
Administrative: Update #2 - GOES-15 supplemental operations extended to March 2, 2020, Issued: February 28, 2020 1405 UTC
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February, 28 2020 - Issued: February 28, 2020 1503Z
Product Outage/Anomaly: DMSP SSMI F-16 Data Delay - Issued: February 28, 2020 1537Z
Administrative: Weekly Operations Schedule - Week 10 Issue 2 (Addition of Announcement 5699) for February 28, 2020 issued: February 28, 2020 1612Z
Product Outage/Anomaly: Update #1 DMSP SSMI F-16 Data Delay - Issued: February 28, 2020 2047Z
Product Outage/Anomaly: Update #1 - DMSP Data Loss - Issued: February 28, 2020 2350Z
Product Outage/Anomaly: Update #2 - DMSP Data Loss - Issued: February 29, 2020 0053Z
Product Outage/Anomaly: Update #3 - DMSP Data Loss - Issued: February 29, 2020 0157Z
Administrative: GOES-16 MDS Request for Meso-2 scheduled for February, 29 2020 - Issued: February 29, 2020 0915Z
Administrative: Update #1: GOES-16 MDS Request for Meso-2 scheduled for February, 29 2020 - Issued: February 29, 2020 1321Z
The latest message is at the top. To decode the filenames for the messages listed above, MSGXXXHHMM.html, MSG means "Message", XXX is the Julian Date, HHMM is the time of the message in UTC. Files are now saved as html format.