Topic:M-B Weekly Operations Schedule - Week 08
Date/Time Issued: February 13, 2020 1637Z
Product(s) or Data Impacted:M-B See list below.
Date/Time of Initial Impact:M-B February 13, 2020 16:12ZM-B (from the Eumetsat Weekly Operations Schedule message)
Date/Time of Expected End:M-B See table in detail for on and off switch time M-B
Length of Outage:M-B N/A
Details/Specifics of Change:
Message number: | 6668 |
Message creation: | Thu Feb 13 16:12:30 GMT+00:00 2020 |
Type: | Service Enhancement |
Ann Nr: | 4920 |
Rev: | 1 |
Start Time: | 2019-06-27 09:00:00.0 |
End Time: | 2019-06-27 09:00:00.0 |
Subject: | general-announcement |
Detail: | There is an issue with the latest EUMETCast software package, affecting Linux operating systems when the Tellicast client software (version 2.14.5) is used in combination with the Safenet drivers. A new alpha version of Tellicast, with a fix of the issue, is available for download. See the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4451027.html |
Issue Time: | 2019-06-27 11:18:18.0 |
Services: |
|
Type: | Planned Maintenance |
Ann Nr: | 5355 |
Rev: | 1 |
Start Time: | 2019-11-14 00:00:00.0 |
End Time: | 2020-04-15 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | GOME-2 |
Subject: | general-announcement |
Impact: | data-degraded |
Detail: | The Metop-A satellite with GOME-2 on-board is currently in drifting orbit. As a consequence there are periods during which the GOME-2 instrument is not able to carry out its daily solar calibration measurement. The third such period will be from 14 November 2019 to 14 April 2020. During this period, the solar mean reference spectrum provided in the Metop-A GOME-2 level-1B product will be automatically replaced by a modelled solar spectrum using information on solar activity from Metop-B. Therefore, it is expected that the quality of both level-1B and level-2 products might undergo slight changes during this period, and there will be an associated risk of degraded product quality for Metop-A GOME-2 products. |
Status: | scheduled |
Issue Time: | 2020-01-10 07:39:08.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 AHRPT Metop-A AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5402 |
Rev: | 2 |
Start Time: | 2019-12-04 14:00:00.0 |
End Time: | 2020-02-19 14:00:00.0 |
Satellites: | Metop-C |
Subject: | general-announcement |
Impact: | data-degraded |
Detail: | Drift to a new orbital position. During this period, Metop-C will not be following the reference orbit, with a drifting ground track and phase with respect to Metop-B. Some instrument products may be degraded. A small impact on the number and quality of AVHRR wind products might be observed during this period. [Rev. 2]: End date updated. |
Status: | scheduled |
Issue Time: | 2020-01-31 07:55:07.0 |
Services: |
AVHRR Level 1 - Metop-C AMSU-A Level 1 - Metop-C IASI Sounding products- Metop-C SEM L0 - Metop-C MHS Level 1 - Metop-C Multi-sensor Products - Metop-C IASI Level 1 - Metop-C EARS-ATOVS EARS-AVHRR EARS-IASI HIRS AHRPT Metop-C A-DCS AHRPT Metop-C AMSU-A AHRPT Metop-C IASI AHRPT Metop-C AVHRR AHRPT Metop-C MHS AHRPT Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 5475 |
Rev: | 2 |
Start Time: | 2020-01-06 00:00:00.0 |
End Time: | 2020-04-01 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. |
Status: | scheduled |
Issue Time: | 2020-02-10 14:53:52.0 |
Services: |
ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5596 |
Rev: | 1 |
Start Time: | 2020-01-29 00:00:00.0 |
End Time: | 2021-12-31 23:59:00.0 |
Satellites: | Metop-A |
Subsystem: | HRPT |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates. |
Status: | scheduled |
Issue Time: | 2020-02-03 10:12:03.0 |
Services: |
A-DCS AHRPT Metop-A ASCAT AHRPT Metop-A AMSU-A AHRPT Metop-A AVHRR AHRPT Metop-A IASI AHRPT Metop-A HIRS AHRPT Metop-A GRAS AHRPT Metop-A MHS AHRPT Metop-A GOME-2 AHRPT Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5600 |
Rev: | 1 |
Start Time: | 2020-01-30 08:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | Due to system maintenance, the SARAL service is in a risk-state and product degradation or losses can be expected, until further notice. This is affecting all SARAL products distributed on EUMETCast. |
Status: | scheduled |
Issue Time: | 2020-01-30 16:16:27.0 |
Services: |
SARAL Products |
Type: | Service Enhancement |
Ann Nr: | 5470 |
Rev: | 2 |
Start Time: | 2020-01-31 16:00:00.0 |
End Time: | 2020-03-02 16:00:00.0 |
Subject: | service-change |
Detail: | NOAA plans to terminate the GOES-15 Imager service on 31 January 2020. The GOES-15 Imager L1b data in netCDF format provided by EUMETSAT will stop being distributed on EUMETCast at the same time. [Rev. 2]: End date updated. NOAA has announced an extension of the GOES-15 imager service to 2 March 2020. The provision by EUMETSAT of GOES-15 L1b data in netCDF will continue until then. |
Status: | scheduled |
Issue Time: | 2020-01-30 10:17:31.0 |
Services: |
GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 5580 |
Rev: | 2 |
Start Time: | 2020-02-03 09:00:00.0 |
End Time: | 2020-02-03 17:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | data-unavailable |
Detail: | IASI Level 2 Patch installation V6.5.9 and System upgrade. Correction of two anomalies detected on the IASI L2 V 6.5 which is operational since the 4th December 2019: - Cloud: cloud top temperature values were sometimes incorrectly supplied although no clouds could actually be retrieved. All cloud parameters are now reset to NaN in the absence of a cloud retrieval. - SO2: Information about missing input IASI data were not copied into the SO2 quality flag, which was also preventing the use of forecast data instead of IASI L2 profiles when those were of degraded quality. The correct processing and flagging have been restored. Please note that an outage of up to 8 hours during working hours might be encountered. [Rev. 2] The maintenance is postponed to a future date. |
Status: | scheduled |
Issue Time: | 2020-02-03 17:14:15.0 |
Services: |
IASI Sounding Products - Metop-A IASI Sounding products- Metop-C IASI Sounding Products - Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 5582 |
Rev: | 1 |
Start Time: | 2020-02-06 08:45:00.0 |
End Time: | 2020-02-18 09:45:00.0 |
Satellites: | MET-8 |
Subject: | Sun-colinearity |
Impact: | risk-of-degradation |
Detail: | Sun Co-linearity. Repeat cycles 08:45 to 09:45 may be affected. |
Status: | scheduled |
Issue Time: | 2020-01-29 15:43:52.0 |
Services: |
IODC SEVIRI Level 1.5 Image Data IODC Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 5566 |
Rev: | 1 |
Start Time: | 2020-02-07 20:30:00.0 |
End Time: | 2020-03-30 20:30:00.0 |
Satellites: | MET-8 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | There is a risk of degraded image quality every night from 20:30 to 23:00 in the given time period. |
Status: | scheduled |
Issue Time: | 2020-01-22 16:24:40.0 |
Services: |
IODC SEVIRI Level 1.5 Image Data IODC Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 5574 |
Rev: | 2 |
Start Time: | 2020-02-12 09:00:00.0 |
End Time: | 2020-02-12 17:00:00.0 |
Satellites: | Metop-A,Metop-B,Metop-C |
Subsystem: | GRAS |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | Software Release of GRAS PPF. Changes to the GRAS Level 1 product algorithms. The algorithm changes include technical improvements and bug fixes, as well as support to the changed data formats of the auxiliary files provided by the Radio Occultation Support Network (RSN). This message refers to the second phase of the deployment which will use the changed RSN auxiliary files (after a first phase planned to take place on 04 February 2020). [Rev. 2] The second phase of the deployment will no longer take place on 12 February 2020, it is postponed to a future date. |
Status: | scheduled |
Issue Time: | 2020-02-05 16:36:56.0 |
Services: |
GRAS Level 1 - Metop-A GRAS Level 1 - Metop-B GRAS Level 1 - Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 5646 |
Rev: | 1 |
Start Time: | 2020-02-17 04:50:00.0 |
End Time: | 2020-02-17 08:50:00.0 |
Satellites: | Metop-A |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | External Calibration |
Status: | scheduled |
Issue Time: | 2020-02-12 14:40:20.0 |
Services: |
IASI Level 1 - Metop-A IASI Sounding Products - Metop-A EARS-IASI IASI AHRPT Metop-A OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5632 |
Rev: | 1 |
Start Time: | 2020-02-17 12:59:00.0 |
End Time: | 2020-02-17 17:22:00.0 |
Satellites: | Sentinel-3A |
Subsystem: | OLCI |
Subject: | instrument-special-operation |
Impact: | risk-of-delay |
Detail: | As a result of a Twilight Test to be performed, additional OLCI scientific data will be generated during the following sensing times: 12:59.41 - 13:39.06; 14:40.40 - 15:40.05 and 16:21.39 - 17:21.04. This operation might have an impact on the production of all S3A products. |
Status: | scheduled |
Issue Time: | 2020-02-06 09:03:25.0 |
Services: |
OLCI Level 1 Products - S3A OLCI Level 2 Marine Products - S3A SLSTR Level 1 Products - S3A SLSTR Level 2 Marine Products - S3A SRAL Level 1 Products - S3A SRAL Level 2 Marine Products - S3A |
Type: | Planned Maintenance |
Ann Nr: | 5647 |
Rev: | 1 |
Start Time: | 2020-02-17 13:49:00.0 |
End Time: | 2020-02-17 13:55:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | Gain Compression |
Status: | scheduled |
Issue Time: | 2020-02-12 14:42:48.0 |
Services: |
ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A EARS-ASCAT OSI SAF - Products ASCAT AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5645 |
Rev: | 1 |
Start Time: | 2020-02-18 08:12:00.0 |
End Time: | 2020-02-18 08:19:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2020-02-12 14:38:16.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5651 |
Rev: | 1 |
Start Time: | 2020-02-18 08:39:00.0 |
End Time: | 2020-02-18 08:46:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2020-02-12 14:48:40.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 5652 |
Rev: | 1 |
Start Time: | 2020-02-18 08:39:00.0 |
End Time: | 2020-02-18 10:22:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | TED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM TED in flight calibration. |
Status: | scheduled |
Issue Time: | 2020-02-12 14:49:12.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 5650 |
Rev: | 1 |
Start Time: | 2020-02-18 09:27:00.0 |
End Time: | 2020-02-18 09:34:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2020-02-12 14:46:12.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 5654 |
Rev: | 1 |
Start Time: | 2020-02-18 15:00:00.0 |
End Time: | 2020-02-18 17:00:00.0 |
Satellites: | Himawari-8 |
Subject: | in-plane-manoeuvre |
Impact: | data-unavailable |
Detail: | Maintenance of Himawari-8 satellite is scheduled from 15:00 UTC to 16:50 UTC on 18 February 2020 (Observation ID : P091 - P101). Thus Himawari imagery will not be available via HimawariCloud during the period. |
Status: | scheduled |
Issue Time: | 2020-02-12 15:07:15.0 |
Services: |
Himawari Products |
Type: | Planned Maintenance |
Ann Nr: | 5644 |
Rev: | 1 |
Start Time: | 2020-02-18 18:28:00.0 |
End Time: | 2020-02-18 18:29:00.0 |
Satellites: | MET-8 |
Subject: | in-plane-manoeuvre |
Impact: | data-degraded |
Detail: | East-West Station Keeping Manoeuvre. Users may experience degraded image quality and degraded meteorological product quality up to a few hours after the manoeuvre. |
Status: | scheduled |
Issue Time: | 2020-02-12 14:36:45.0 |
Services: |
IODC SEVIRI Level 1.5 Image Data IODC Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 5572 |
Rev: | 2 |
Start Time: | 2020-02-19 12:22:00.0 |
End Time: | 2020-02-19 12:23:00.0 |
Satellites: | Metop-C |
Subject: | in-plane-manoeuvre |
Detail: | Drift stop manoeuvre. Some instrument data will be unavailable or degraded during this period.The exact burn time and instrument affected outage will be announced closer to the day of the manoeuvre. Reduced data quality should be expected for data sensed during this period. [Rev. 2]: Manoeuvre Execution time updated. Burn time: 12:22:22 UTC. Duration: 10.520 seconds. |
Status: | scheduled |
Issue Time: | 2020-02-12 14:56:55.0 |
Services: |
SEM L0 - Metop-C AMSU-A Level 1 - Metop-C MHS Level 1 - Metop-C AVHRR Level 1 - Metop-C IASI Sounding products- Metop-C Multi-sensor Products - Metop-C IASI Level 1 - Metop-C EARS-ATOVS EARS-AVHRR EARS-IASI AMSU-A AHRPT Metop-C A-DCS AHRPT Metop-C AVHRR AHRPT Metop-C HIRS AHRPT Metop-C SEM AHRPT Metop-C IASI AHRPT Metop-C MHS AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 5656 |
Rev: | 1 |
Start Time: | 2020-02-19 18:00:00.0 |
End Time: | 2020-02-20 20:00:00.0 |
Satellites: | GOES17 |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | NOAA will conduct a GOES-West ABI Cooling Timeline test from 19th M-bM-^@M-^S 20th of February, both days between 18:00 to 20:00 UTC. During this test phase GOES-17 operations mode will change from MODE 6 to MODE 3, there will be a temporary filename change of GOES-17 ABI L1B products in the indicated time frame. Filenames will start with M-bM-^@M-^XOR_ABI-L1b-RadF-M3C02_G17_M-bM-^@M-^Y instead of M-bM-^@M-^XOR_ABI-L1b-RadF-M6C02_G17_M-bM-^@M-^Y. During the 2-hour test periods 15 minute full disk scan will be available per 30 minute cycle with following timestamps (HH:MM) in the filename: 1800, 1830, 1900, 1930 UTC with Mode 6 resuming at 20:00 UTC. There is a risk of missing or degraded data during this time period. |
Status: | scheduled |
Issue Time: | 2020-02-13 15:42:28.0 |
Services: |
GOES Products |
Type: | Service Enhancement |
Ann Nr: | 5619 |
Rev: | 1 |
Start Time: | 2020-02-20 09:00:00.0 |
End Time: | 2020-02-20 09:00:00.0 |
Subject: | new-product |
Detail: | The AC SAF Metop-C GOME-2 Near Real-Time Total Column product to be available on EUMETCast. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4864828.html |
Status: | scheduled |
Issue Time: | 2020-02-05 12:25:55.0 |
Services: |
AC SAF - Products |
Type: | Service Enhancement |
Ann Nr: | 5620 |
Rev: | 1 |
Start Time: | 2020-02-20 09:00:00.0 |
End Time: | 2020-02-20 09:00:00.0 |
Subject: | new-product |
Detail: | A new precipitation product from the H SAF, H18, to be available on EUMETCast. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4864827.html |
Status: | scheduled |
Issue Time: | 2020-02-05 12:28:53.0 |
Services: |
H-SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5648 |
Rev: | 1 |
Start Time: | 2020-02-23 18:17:00.0 |
End Time: | 2020-02-23 19:16:00.0 |
Satellites: | Metop-A |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2020-02-12 14:44:01.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 AHRPT Metop-A AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5653 |
Rev: | 1 |
Start Time: | 2020-02-23 19:15:00.0 |
End Time: | 2020-02-23 20:14:00.0 |
Satellites: | Metop-C |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2020-02-12 14:50:09.0 |
Services: |
GOME-2 Level 1 - Metop-C GOME-2 AHRPT Metop-C AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5649 |
Rev: | 1 |
Start Time: | 2020-02-23 19:44:00.0 |
End Time: | 2020-02-23 20:43:00.0 |
Satellites: | Metop-B |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2020-02-12 14:45:05.0 |
Services: |
GOME-2 Level 1 - Metop-B GOME-2 AHRPT Metop-B AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5567 |
Rev: | 1 |
Start Time: | 2020-02-24 22:30:00.0 |
End Time: | 2020-04-13 01:00:00.0 |
Satellites: | MET-10 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | There is a risk of degraded image quality every night from 22:30 to 01:00 next day in the given time period. |
Status: | scheduled |
Issue Time: | 2020-01-22 16:27:24.0 |
Services: |
RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 5637 |
Rev: | 1 |
Start Time: | 2020-02-25 09:00:00.0 |
End Time: | 2020-02-25 09:00:00.0 |
Subject: | product-change |
Detail: | Change to processing standards of SARAL/AltiKa Operational Geophysical Data Records (OGDR). For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4868376.html |
Status: | scheduled |
Issue Time: | 2020-02-07 14:24:06.0 |
Services: |
SARAL Products |
Type: | Planned Maintenance |
Ann Nr: | 5583 |
Rev: | 1 |
Start Time: | 2020-02-25 11:15:00.0 |
End Time: | 2020-03-07 12:15:00.0 |
Satellites: | MET-10 |
Subject: | Sun-colinearity |
Impact: | risk-of-interruption |
Detail: | Sun Co-linearity. Repeat cycles 11:15 to 12:15 may be affected. |
Status: | scheduled |
Issue Time: | 2020-01-29 15:48:45.0 |
Services: |
RSS Meteosat Meteorological Products RSS SEVIRI Level 1.5 Image Data |
Type: | Planned Maintenance |
Ann Nr: | 5591 |
Rev: | 1 |
Start Time: | 2020-02-26 09:00:00.0 |
End Time: | 2020-03-02 09:00:00.0 |
Satellites: | Metop-C |
Subsystem: | IASI |
Subject: | instrument-decontamination |
Impact: | data-unavailable |
Detail: | IASI Decontamination. |
Status: | scheduled |
Issue Time: | 2020-01-29 16:18:53.0 |
Services: |
IASI Sounding products- Metop-C IASI Level 1 - Metop-C EARS-IASI IASI AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5568 |
Rev: | 1 |
Start Time: | 2020-02-27 23:00:00.0 |
End Time: | 2020-04-12 01:30:00.0 |
Satellites: | MET-11 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | There is a risk of degraded image quality every night from 23:00 to 01:30 next day in the given time period |
Status: | scheduled |
Issue Time: | 2020-01-22 16:29:43.0 |
Services: |
0M-BM-0 SEVIRI Level 1.5 Image Data 0M-BM-0 Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 5655 |
Rev: | 1 |
Start Time: | 2020-02-28 09:00:00.0 |
End Time: | 2020-02-28 09:00:00.0 |
Subject: | general-announcement |
Detail: | BDMS and CSIR products, distributed in the frame of AMESD/MESA, will be discontinued. These products will no longer be generated by the data providers. |
Status: | scheduled |
Issue Time: | 2020-02-13 09:55:47.0 |
Services: |
Misc AMESD Products |
Type: | Planned Maintenance |
Ann Nr: | 5584 |
Rev: | 1 |
Start Time: | 2020-02-28 12:00:00.0 |
End Time: | 2020-03-09 13:00:00.0 |
Satellites: | MET-11 |
Subject: | Sun-colinearity |
Impact: | risk-of-degradation |
Detail: | Sun Co-linearity. Repeat cycles 12:00 to 13:00 may be affected. |
Status: | scheduled |
Issue Time: | 2020-01-29 15:51:07.0 |
Services: |
0M-BM-0 SEVIRI Level 1.5 Image Data 0M-BM-0 Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 5421 |
Rev: | 1 |
Start Time: | 2020-03-02 09:00:00.0 |
End Time: | 2020-03-02 09:00:00.0 |
Subject: | general-announcement |
Detail: | The NOAA Direct Broadcast Real-Time Network (DBRTN) data, currently distributed on EUMETCast, will be removed on 2 March 2020. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4759427.html |
Status: | scheduled |
Issue Time: | 2019-12-04 11:30:54.0 |
Services: |
NDB (NOAA Direct Broadcast) |
Type: | Service Enhancement |
Ann Nr: | 5159 |
Rev: | 1 |
Start Time: | 2020-06-01 09:00:00.0 |
End Time: | 2020-06-01 09:00:00.0 |
Subject: | product-change |
Detail: | A new BUFR encoding sequence will be introduced in June 2020 for all EUMETSATM-bM-^@M-^Ys wind products. For full details and sample files, see the URL provided below. |
Url: | http://www.eumetsat.int/website/home/News/DAT_4593260.html |
Status: | scheduled |
Issue Time: | 2019-09-11 16:22:14.0 |
Services: |
0M-BM-0 Meteosat Meteorological Products RSS Meteosat Meteorological Products IODC Meteosat Meteorological Products AVHRR Polar Winds - Metop-A AVHRR Polar Winds - Metop-B AVHRR Polar winds - Metop-C Multi-Metop Wind Products |
Name: | EUMETSAT |
Address: |
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |
This message was sent by ESPC.Notification@noaa.gov.
You have been sent this and other notifications because you have
opted in to receive it. If for any reason, you wish to
unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov
or (301) 817-3880. Please note: it may take up to two business
days to process your unsubscribe request.