Attention:

We're excited to announce that we've undergone a complete website redesign to enhance your browsing experience! Our fresh new look is designed to make navigation easier and content more accessible. Click here to be taken to the new OSPO homepage. Should you have any questions please reach out to the OSPO Webmaster.

NOAA Office of Satellite and Product Operations

NOAA 14 SEM Subsystem Summary

Component Description Status
DPUSpace environment Monitor - Data Processing UnitGreen
MEPEDSpace environment Monitor - Medium Energy Proton DetectorGreen
TEDSpace environment Monitor - Total Energy DetectorYellow


Subsystem History:

Date Time Component Description
10/03/200618:00:00 Restore SEM to standard operational configuration
09/28/200617:05:00 Major spacecraft attitude perturbation resulted in autonomous battery undervoltage safing macro implementation turning off SEM.
12/16/200315:30:00TEDSet TED electron power supply bias voltage to operational level. Recovery ops complete.
12/16/200313:57:00TEDSEM TED pulse height discriminatinator to level-4 (operational value).
12/16/200313:56:00TEDTED electron and proton channel biases to level 1 to continue recovery ops.
12/16/200313:55:00TEDTurn TED high voltage on to continue recovery.
12/16/200313:53:00TEDTurn TED off for SEM recovery operations
12/16/200313:53:00TEDTurn TED ON to continue SEM recovery .
12/16/200309:45:00TEDSEM TED Autonomous Reset.
03/10/200316:04:00TEDTurn TED off
03/10/200316:04:00TEDTurn TED On
03/10/200316:04:00TEDTurn TED high voltage on
03/10/200316:04:00TEDTED electron and proton channel biases to known levels
03/10/200316:04:00TEDSets pulse height discriminatinator levels to operational values
03/10/200316:04:00TEDSet electron power supply bias voltage to operational level
12/14/200210:40:00TEDSEM autonomous reset, recovery ops to Level 4 followed
09/01/2002TEDSEM Autonomous Reset
10/26/200101:50:00TEDPower cycled SEM TED. Set electron and proton biases to level 1, PHD to level 4, MUX to normal mode and set electron channeltron HV to level 0.
10/25/200120:35:00TEDSEM TED bias reset
02/19/2001TEDSEM testing stepped through PHD levels 1, 3 and 4.
02/08/200119:00:00TEDSEM PHD levels changed from 2 to 4
01/31/200115:30:00TEDSEM PHD increased
01/24/2001TEDSEM auto shutdown and restart
01/18/200107:00:00TEDSEM auto shutdown and restart @ 11:15
04/15/1999TEDSEM 300 KeV electron level channels failed, housekeeping data nominal
11/10/1998TEDSEM TED attempts to configure back to Level 2 unsuccessful, configured back to Level 0.
10/28/1998TEDPower cycled SEM TED due to high electron and proton activity. Commanded to level 1
01/20/1995 SEM one of 4 telescopes is not operational, 12% data loss.
12/30/199410:36:00TEDOn Orbit
12/30/199410:36:00MEPEDOn Orbit
12/30/199410:36:00DPUOn Orbit