Message number: | 10908 |
Message creation: | Fri Aug 18 14:02:18 UTC 2023 |
Type: | Planned Maintenance |
Ann Nr: | 9204 |
Rev: | 0 |
Start Time: | 2023-01-31 09:39:00.0 |
Satellites: | Sentinel-3B |
Subsystem: | SRAL |
Subject: | instrument-calibration |
Impact: | data-degraded |
Detail: | Starting 31/01/2023 09:39:49 S3B will start performing SRAL external calibrations over a transponder site in Leonessa. To conduct this transponder pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.27 seconds over the transponder location (42.61607° N, 13.03780° E) for all relative orbits number (RON) 306 - from cycle 75 (inclusive) onwards. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-01-25 17:19:20.0 |
Services: | SRAL Level 1 Products - S3B SRAL Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 9205 |
Rev: | 0 |
Start Time: | 2023-02-02 10:28:00.0 |
Satellites: | Sentinel-3B |
Subsystem: | SRAL |
Subject: | instrument-calibration |
Impact: | data-degraded |
Detail: | Starting 02/02/2023 10:28:30 S3B will start performing SRAL external calibrations over a corner reflector site in Spain. To conduct this pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.26 seconds over the transponder location (42.052°N, 0.7300° E) for all relative orbits number (RON) 335 - from cycle 75 (inclusive) onwards |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-01-25 17:19:08.0 |
Services: | SRAL Level 1 Products - S3B SRAL Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 9258 |
Rev: | 0 |
Start Time: | 2023-02-14 20:35:00.0 |
Satellites: | Sentinel-3A |
Subsystem: | SRAL |
Subject: | instrument-calibration |
Impact: | data-degraded |
Detail: | Starting 14/02/2023 20:35:57 S3A will start performing SRAL external calibrations over a transponder in Leonessa, Italy. To conduct this transponder pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.28 seconds over the transponder location (42.61607° N, 13.03780° E) for all relative orbits number (RON) 270 from cycle 95 (inclusive) onwards |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-02-08 09:22:43.0 |
Services: | SRAL Level 1 Products - S3A SRAL Level 2 Marine Products - S3A |
Type: | Service Enhancement |
Ann Nr: | 9420 |
Rev: | 0 |
Start Time: | 2023-03-20 15:00:00.0 |
End Time: | 2023-09-21 15:00:00.0 |
Satellites: | MET-9 |
Subject: | general-announcement |
Detail: | From 20/03/2023, the daily Meteosat-9 Upper HRV Window shift time will change from 14:00 UTC to 15:00 UTC to better optimise the illumination for the Spring/Summer season. The 15:00 UTC shift time will remain in place until 21 September 2023 included. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-03-17 08:52:52.0 |
Services: | IODC Meteosat Meteorological Products IODC SEVIRI Level 1.5 Image Data |
Type: | Service Enhancement |
Ann Nr: | 9447 |
Rev: | 0 |
Start Time: | 2023-04-12 09:00:00.0 |
Subject: | service-change |
Detail: | Data access from the Data Centre is being migrated to the Data Store, for easier and faster access. For full details, see the URL provided below. |
Revision History: | |
Url: | https://www.eumetsat.int/transition-data-centre-data-store |
Issue Time: | 2023-03-29 13:44:49.0 |
Services: | EUMETSAT Data Centre |
Type: | Planned Maintenance |
Ann Nr: | 9782 |
Rev: | 1 |
Start Time: | 2023-07-18 09:00:00.0 |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | ROM SAF will restart providing L2 RO data based on NOAA L1B Commercial Radio Occultation data (this time based on PlanetIQ input) on the 21 August 2023. |
Revision History: | [Original] Following the release on EUMETCast of Level-1B NOAA-procured Spire Radio Occultation data processed by EUMETSAT, and L2 product generated by the ROM SAF, on 20 June 2023 (see URL provided below for reference), NOAA will switch from Spire to another data provider, PlanetiQ, on 18 July 2023, corresponding to the start of their next 6-month delivery order. As we need to adapt our processor to the new PlanetiQ data, a gap in the provision of NOAA commercial RO data is to be expected starting 18 July. An announcement will be issued as soon as we have a date for the start of dissemination of the new PlanetiQ data. |
Url: | https://www.eumetsat.int/noaa-procured-radio-occultation-data-eumetcast-soon |
Status: | scheduled |
Issue Time: | 2023-08-18 14:00:39.0 |
Services: | ROM SAF - Products Commercial Radio Occultation data |
Type: | Service Enhancement |
Ann Nr: | 9846 |
Rev: | 0 |
Start Time: | 2023-07-25 09:00:00.0 |
Subject: | general-announcement |
Detail: | As the public release of the new MTG-I1 data is approaching, with the distribution of pre-operational FCI L1c data currently planned for October 2023, we have released a dedicated web page capturing all users need to know to get ready for accessing and using the data. For full details, see the URL provided below. |
Revision History: | |
Url: | https://www.eumetsat.int/getting-ready-data-first-mtg-missions |
Issue Time: | 2023-07-26 14:35:41.0 |
Services: |
Type: | Planned Maintenance |
Ann Nr: | 9838 |
Rev: | 0 |
Start Time: | 2023-08-09 20:15:00.0 |
End Time: | 2023-09-30 23:00:00.0 |
Satellites: | MET-9 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | There is a risk of degraded image quality every night from 20:15 to 23:00 in the given time period. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-07-27 06:46:45.0 |
Services: | IODC SEVIRI Level 1.5 Image Data IODC Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 9912 |
Rev: | 0 |
Start Time: | 2023-08-21 09:06:00.0 |
End Time: | 2023-08-21 09:08:00.0 |
Satellites: | Sentinel-3B |
Subsystem: | OLCI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 10:25:35.0 |
Services: | OLCI Level 1 Products - S3B OLCI Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 9911 |
Rev: | 0 |
Start Time: | 2023-08-21 12:10:00.0 |
End Time: | 2023-08-24 17:00:00.0 |
Satellites: | Sentinel-3B |
Subsystem: | SRAL |
Subject: | instrument-special-operation |
Impact: | data-degraded |
Detail: | SRAL will be patched to apply OLTC v4.0 on-board. The instrument will be operated in SAR Closed-Loop mode for the duration of the patching activity, resulting in some degraded data: minimal impact on ocean, in-land water data is further impacted, including data loss due to the acquisition mode. Additional outages will be experienced during mode changes and restarts and are projected as follows:22/08/2023 08:22 - 08:25, :22/08/2023 15:01 - 15:03, 23/08/2023 07:56 - 07:59, 23/08/2023 09:36 - 09:42 |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 10:22:26.0 |
Services: | SRAL Level 1 Products - S3B SRAL Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 9919 |
Rev: | 0 |
Start Time: | 2023-08-21 14:11:00.0 |
End Time: | 2023-08-21 14:18:00.0 |
Satellites: | Metop-C |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | Gain Compression |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 14:50:55.0 |
Services: | ASCAT Soil Moisture - Metop-C ASCAT Level 1 - Metop-C EARS-ASCAT ASCAT AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 9916 |
Rev: | 0 |
Start Time: | 2023-08-21 19:45:00.0 |
End Time: | 2023-08-26 00:15:00.0 |
Satellites: | Metop-B |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | McMurdo monthly antenna Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system may be impacted during the following maintenance period. Therefore only nominal Arctic timeliness may be available during this period. The maintenance periods are the following: on DOY 233/21 August: 1945-0000Z, on DOY 234/ 22 August 0230-0330Z,0405-0500 and 2245-2345Z, on DOY 235/23 August 0030-0130Z,0200-0300 and 0400-0500Z, on DOY 237/25 August 2000-2100, 2140-2240 and 2325-0000Z, and on DOY 238/26 August 0001-0015Z. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 15:02:48.0 |
Services: | SEM L0 - Metop-B ASCAT Level 1 - Metop-B HIRS Level 1 - Metop-B AVHRR Level 1 - Metop-B MHS Level 1 - Metop-B AMSU-A Level 1 - Metop-B GRAS Level 1 - Metop-B IASI Level 1 - Metop-B GOME-2 Level 1 - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B Multi-Metop Wind Products |
Type: | Planned Maintenance |
Ann Nr: | 9913 |
Rev: | 0 |
Start Time: | 2023-08-22 07:00:00.0 |
End Time: | 2023-08-22 15:30:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Station Servers and EUMETSAT Main server software maintenance. There may be disruption to the listed EUMETSAT based services. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 14:24:28.0 |
Services: | EARS-ATOVS EARS-IASI EARS-ASCAT EARS-ATMS EARS-AVHRR EARS-CrlS EARS-MWRI EARS-NWC EARS-VASS EARS-VIIRS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 9917 |
Rev: | 0 |
Start Time: | 2023-08-22 08:34:00.0 |
End Time: | 2023-08-22 08:41:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 14:49:20.0 |
Services: | SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 9914 |
Rev: | 0 |
Start Time: | 2023-08-22 09:22:00.0 |
End Time: | 2023-08-22 09:29:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 14:28:23.0 |
Services: | SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 9918 |
Rev: | 0 |
Start Time: | 2023-08-22 19:15:00.0 |
End Time: | 2023-08-22 20:14:00.0 |
Satellites: | Metop-C |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 14:50:10.0 |
Services: | GOME-2 AHRPT Metop-C GOME-2 Level 1 - Metop-C AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 9915 |
Rev: | 0 |
Start Time: | 2023-08-22 19:44:00.0 |
End Time: | 2023-08-22 20:43:00.0 |
Satellites: | Metop-B |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 14:29:17.0 |
Services: | GOME-2 Level 1 - Metop-B GOME-2 AHRPT Metop-B AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 9920 |
Rev: | 0 |
Start Time: | 2023-08-23 09:00:00.0 |
End Time: | 2023-08-23 09:00:00.0 |
Satellites: | Metop-B |
Subsystem: | AVHRR |
Subject: | instrument-calibration |
Impact: | risk-of-interruption |
Detail: | AVHRR voltage calibration. An outage of around 10 minutes are expected during the operation. The exact time will be defined closer to the activity. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-08-16 14:57:28.0 |
Services: | AVHRR Level 1 - Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 9839 |
Rev: | 0 |
Start Time: | 2023-08-23 23:15:00.0 |
End Time: | 2023-10-12 02:00:00.0 |
Satellites: | MET-10 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | There is a risk of degraded image quality every night from 23:15 to 02:00 next day in the given time period. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-07-27 06:47:05.0 |
Services: | 0° SEVIRI Level 1.5 Image Data 0° Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 9840 |
Rev: | 0 |
Start Time: | 2023-08-28 22:30:00.0 |
End Time: | 2023-10-15 00:00:00.0 |
Satellites: | MET-11 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | There is a risk of degraded image quality every night from 22:30 to 01:30 next day in the given time period. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-07-27 14:26:59.0 |
Services: | RSS Meteosat Meteorological Products RSS SEVIRI Level 1.5 Image Data |
Type: | Service Enhancement |
Ann Nr: | 9779 |
Rev: | 0 |
Start Time: | 2023-09-05 09:00:00.0 |
End Time: | 2023-09-26 09:00:00.0 |
Subject: | product-change |
Detail: | The current Sentinel-3 Altimetry product for Africa will be replaced by a new Sentinel-3 land hydrology thematic product at the end of September 2023 (exact date to be announced). To facilitate user transition to the new product, both current and new products will be distributed in parallel for a period of three weeks, from 5 to 26 September 2023. For full details, see the URL provided below. |
Revision History: | |
Url: | https://www.eumetsat.int/sentinel-3-altimetry-product-africa-be-replaced |
Issue Time: | 2023-07-12 09:42:15.0 |
Services: |
Type: | Service Enhancement |
Ann Nr: | 9730 |
Rev: | 1 |
Start Time: | 2023-09-11 09:00:00.0 |
End Time: | 2023-09-11 09:00:00.0 |
Subject: | general-announcement |
Detail: | Change of date from 31 July to 11 September 2023. |
Revision History: | [Original] The EUMETCast Terrestrial service will undergo reorganisation on 31 July 2023. This change is intended to optimise the bandwidth usage on the service. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/eumetcast-terrestrial-reorganisation |
Issue Time: | 2023-06-29 13:05:36.0 |
Services: | EUMETCast-Terrestrial |
Type: | Service Enhancement |
Ann Nr: | 9748 |
Rev: | 0 |
Start Time: | 2023-09-12 09:00:00.0 |
End Time: | 2023-09-12 09:00:00.0 |
Subject: | general-announcement |
Detail: | The distribution of two IODC H SAF Precipitation products on EUMETCast Africa will be stopped on 12 September 2023. The products are: H63 'Precipitation rate at ground by GEO/IR supported by LEO/MW - IODC' and H90 'Accumulated Precipitation at ground by blended MW and IR - IODC'. This is due to EUMETCast Africa bandwidth considerations. |
Revision History: | |
Issue Time: | 2023-06-28 13:51:44.0 |
Services: | H-SAF - Products |
Type: | Service Enhancement |
Ann Nr: | 9921 |
Rev: | 0 |
Start Time: | 2023-09-28 12:00:00.0 |
End Time: | 2023-09-28 13:00:00.0 |
Subject: | general-announcement |
Detail: | Training Session on how to access the data during the transition from Eumetsat Data Centre to Data Store. For more information please refer to the URL link below. |
Revision History: | |
Url: | https://www.eumetsat.int/data-access-services-how-interact-data-access-apis-through-swagger-ui |
Status: | scheduled |
Issue Time: | 2023-08-17 11:52:58.0 |
Services: |
Type: | Service Enhancement |
Ann Nr: | 9778 |
Rev: | 0 |
Start Time: | 2023-10-12 11:00:00.0 |
End Time: | 2023-11-16 14:00:00.0 |
Subject: | general-announcement |
Detail: | A series of sessions to provide training on using the Data Tailor is scheduled between 12 October and 16 November 2023. For full details and to register for the sessions, see the URL provided below. |
Revision History: | |
Url: | https://www.eumetsat.int/customise-data-tailor-products |
Issue Time: | 2023-07-11 13:41:16.0 |
Services: |
Name: | EUMETSAT |
Address: | Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |
Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.