Topic:  Eumetsat Weekly Operations Schedule - Week 2

Date/Time Issued:  January 06, 2022 1603Z

 Product(s) or Data Impacted: See list below.

 Date/Time of Initial Impact:  January 06, 2022 1557Z  (from the Eumetsat Weekly Operations Schedule message)

 Date/Time of Expected End:  See table in detail for on and off switch time

 Length of Outage:  N/A

Details/Specifics of Change: 

Message number: 8637
Message creation: Thu Jan 06 15:57:49 UTC 2022


Type: Planned Maintenance
Ann Nr: 7582
Rev: 1
Start Time: 2021-12-07 00:00:00.0
End Time: 2022-01-31 00:00:00.0
Satellites: Metop-C
Subsystem: ASCAT
Impact: risk-of-interruption
Detail: Calibrations to support transponder test.. Short outages of the ASCAT GDS Level 1, soil moisture and global and regional winds products can be expected, during satellite passes over Turkey.
Status: scheduled
Issue Time: 2021-11-17 14:58:54.0
Services: ASCAT Soil Moisture - Metop-C
ASCAT Level 1 - Metop-C

Type: Service Enhancement
Ann Nr: 7704
Rev: 1
Start Time: 2021-12-29 00:00:00.0
End Time: 2022-02-01 23:59:00.0
Satellites: NOAA-20
Subject: general-announcement
Detail: Due to a potential post-maneuver conjunction, NOAA-20 has postponed its Drag Makeup Maneuver (DMU). This will cause NOAA-20 to leave its nominal ground track box on December 29th 2021, crossing the eastern edge. This box is +/- 20 kilometers equatorial longitudinal offset from the reference ground track. The maximum distance reached outside the eastern edge of the box is expected to be about 10 kilometers. The re-planned Drag Makeup Maneuver (DMU) will be performed on January 13th, 2022 at 1628 UTC to correct the drift. The expected date to return to the nominal ground track box is February 1st, 2022. This may vary with the performance of the maneuver. Another notice will be sent when the return to the nominal ground track box is known. The exact times will be announced closer to the events.
Status: scheduled
Issue Time: 2021-12-22 11:06:58.0
Services: ATMS Level 1 - JPSS
CrIS Level 1 - JPSS
VIIRS EDR - JPSS

Type: Planned Maintenance
Ann Nr: 7740
Rev: 1
Start Time: 2022-01-10 02:00:00.0
End Time: 2022-01-18 05:00:00.0
Satellites: Metop-B
Subject: ground-segment-maintenance
Impact: risk-of-delay
Detail: McMurdo ground segment Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system may be impacted during the following maintenance period. Therefore only nominal Arctic timeliness may be available during this period. The maintenance period is the following: on 10 January from 02:00 to 08:00 UTC, on 11 January from 02:00 to 08:00 UTC, on 12 January from 01:00 to 04:30 UTC, on 13 January from 01:00 to 04:30, on 14 January from 01:00 to 04:30 UTC, and on 16 January from 23:00 to 05:00 UTC next day and on 17 January from 23:00 to 05:00 UTC next day.
Status: scheduled
Issue Time: 2022-01-05 16:02:18.0
Services: SEM L0 - Metop-B
AVHRR Level 1 - Metop-B
MHS Level 1 - Metop-B
AMSU-A Level 1 - Metop-B
HIRS Level 1 - Metop-B
ASCAT Level 1 - Metop-B
IASI Level 1 - Metop-B
GRAS Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
ATOVS Sounding products - Metop-B
IASI Sounding Products - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
Multi-Metop Wind Products

Type: Planned Maintenance
Ann Nr: 7735
Rev: 1
Start Time: 2022-01-10 08:00:00.0
End Time: 2022-01-10 10:00:00.0
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: EARS Lannion maintenance. MEOS upgrades, Phase I.There may be disruption to the listed EUMETSAT based services.
Status: scheduled
Issue Time: 2022-01-05 15:10:25.0
Services: EARS-ATOVS
EARS-AVHRR
EARS-MWRI
EARS-ASCAT
EARS-IASI
EARS-ATMS
EARS-CrlS
EARS-VIIRS
EARS-NWC
EARS-VASS
EARS-MERSI

Type: Planned Maintenance
Ann Nr: 7727
Rev: 1
Start Time: 2022-01-10 09:00:00.0
End Time: 2022-01-10 11:00:00.0
Subject: ground-segment-maintenance
Impact: data-delayed
Detail: Planned maintenance activity on the Data Services infrastructure, affecting Data Store and Data Tailor. Users may experience delays when accessing data.
Status: scheduled
Issue Time: 2022-01-05 14:26:49.0
Services: Data Store and Data Tailor Web Service

Type: Planned Maintenance
Ann Nr: 7733
Rev: 1
Start Time: 2022-01-10 15:19:00.0
End Time: 2022-01-10 15:25:00.0
Satellites: Metop-C
Subsystem: ASCAT
Subject: instrument-calibration
Impact: data-unavailable
Detail: Gain Compression
Status: scheduled
Issue Time: 2022-01-05 14:56:19.0
Services: ASCAT Soil Moisture - Metop-C
ASCAT Level 1 - Metop-C
EARS-ASCAT
ASCAT AHRPT Metop-C
OSI SAF - Products

Type: Planned Maintenance
Ann Nr: 7732
Rev: 1
Start Time: 2022-01-11 08:00:00.0
End Time: 2022-01-11 08:07:00.0
Satellites: Metop-C
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2022-01-05 14:55:25.0
Services: SEM L0 - Metop-C
SEM AHRPT Metop-C

Type: Planned Maintenance
Ann Nr: 7729
Rev: 1
Start Time: 2022-01-11 08:49:00.0
End Time: 2022-01-11 08:56:00.0
Satellites: Metop-B
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2022-01-05 14:51:27.0
Services: SEM L0 - Metop-B
SEM AHRPT Metop-B

Type: Planned Maintenance
Ann Nr: 7730
Rev: 1
Start Time: 2022-01-11 08:49:00.0
End Time: 2022-01-11 10:32:00.0
Satellites: Metop-B
Subsystem: SEM
Component: TED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM TED in flight calibration.
Status: scheduled
Issue Time: 2022-01-05 14:51:48.0
Services: SEM L0 - Metop-B
SEM AHRPT Metop-B

Type: Planned Maintenance
Ann Nr: 7706
Rev: 1
Start Time: 2022-01-11 09:00:00.0
End Time: 2022-01-11 16:00:00.0
Satellites: Metop-B,Metop-C
Subject: ground-segment-maintenance
Impact: data-unavailable
Detail: Software maintenance, affecting the ATOVS Level 1 and Level 2 products. The expected outage in production is approximately 2 hours.
Status: scheduled
Issue Time: 2021-12-22 13:12:32.0
Services: ATOVS Sounding products - Metop-B
ATOVS sounding products - Metop-C

Type: Planned Maintenance
Ann Nr: 7728
Rev: 1
Start Time: 2022-01-11 19:58:00.0
End Time: 2022-01-11 19:59:00.0
Satellites: MET-8
Subject: in-plane-manoeuvre
Impact: data-degraded
Detail: East-West Station Keeping Manoeuvre. Users may experience degraded image quality and degraded meteorological product quality up to a few hours after the manoeuvre.
Status: scheduled
Issue Time: 2022-01-05 14:44:19.0
Services: IODC SEVIRI Level 1.5 Image Data
IODC Meteosat Meteorological Products

Type: Planned Maintenance
Ann Nr: 7736
Rev: 1
Start Time: 2022-01-11 23:00:00.0
End Time: 2022-01-12 05:00:00.0
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: EARS Maspalomas PCCW Data Line Maintenance. There may be disruption to the listed EUMETSAT based services.
Status: scheduled
Issue Time: 2022-01-05 15:11:19.0
Services: EARS-ATOVS
EARS-MWRI
EARS-AVHRR
EARS-ASCAT
EARS-IASI
EARS-ATMS
EARS-CrlS
EARS-VIIRS
EARS-MERSI
EARS-VASS
EARS-NWC

Type: Planned Maintenance
Ann Nr: 7726
Rev: 1
Start Time: 2022-01-12 08:18:00.0
End Time: 2022-01-12 08:29:00.0
Satellites: Sentinel-3B
Subject: in-plane-manoeuvre
Impact: data-degraded
Detail: Reduced data quality should be expected for data sensed during this period.
Status: scheduled
Issue Time: 2022-01-05 09:12:12.0
Services: SLSTR Level 1 Products - S3B
SLSTR Level 2 Atmospheric Products - S3B
SLSTR Level 2 Marine Products - S3B
SRAL Level 1 Products - S3B
SRAL Level 2 Marine Products - S3B

Type: Planned Maintenance
Ann Nr: 7707
Rev: 1
Start Time: 2022-01-12 09:00:00.0
End Time: 2022-01-12 16:00:00.0
Satellites: Metop-B,Metop-C
Subsystem: ASCAT
Subject: ground-segment-maintenance
Impact: data-unavailable
Detail: Software maintenance, affecting the ASCAT Level 1 and ASCAT Level 2 (Soil Mosture) products. The expected outage in production is approximately 2 hours.
Status: scheduled
Issue Time: 2021-12-22 13:13:00.0
Services: ASCAT Level 1 - Metop-B
ASCAT Soil Moisture - Metop-B
ASCAT Soil Moisture - Metop-C
ASCAT Level 1 - Metop-C

Type: Planned Maintenance
Ann Nr: 7737
Rev: 1
Start Time: 2022-01-13 09:00:00.0
End Time: 2022-01-13 09:00:00.0
Satellites: Suomi NPP
Subject: VIIRS Lunar Roll
Impact: data-unavailable
Detail: Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre.
Status: scheduled
Issue Time: 2022-01-05 15:19:16.0
Services: ATMS Level 1 - JPSS
CrIS Level 1 - JPSS
VIIRS EDR - JPSS
EARS-VIIRS
SNPP - JPSS Copernicus data

Type: Planned Maintenance
Ann Nr: 7738
Rev: 1
Start Time: 2022-01-13 09:00:00.0
End Time: 2022-01-13 09:00:00.0
Satellites: NOAA-20
Subject: VIIRS Lunar Roll
Impact: data-unavailable
Detail: Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre.
Status: scheduled
Issue Time: 2022-01-06 11:34:11.0
Services: ATMS Level 1 - JPSS
CrIS Level 1 - JPSS
VIIRS EDR - JPSS
EARS-VIIRS
SNPP - JPSS Copernicus data

Type: Planned Maintenance
Ann Nr: 7739
Rev: 1
Start Time: 2022-01-13 09:00:00.0
End Time: 2022-01-13 09:00:00.0
Satellites: NOAA-20
Subject: in-plane-manoeuvre
Impact: data-unavailable
Detail: Drag Make-Up manoeuvre (DMU). This may cause data to be unavailable or degraded. The exact time will be announced closer to the manoeuvre.
Status: scheduled
Issue Time: 2022-01-06 12:54:27.0
Services: ATMS Level 1 - JPSS
CrIS Level 1 - JPSS
VIIRS EDR - JPSS
EARS-VIIRS
SNPP - JPSS Copernicus data

Type: Planned Maintenance
Ann Nr: 7731
Rev: 1
Start Time: 2022-01-14 04:25:00.0
End Time: 2022-01-14 11:12:00.0
Satellites: Metop-B
Subsystem: IASI
Subject: instrument-calibration
Impact: data-unavailable
Detail: External Calibration. Lunar acquisition. CS2 campaign.
Status: scheduled
Issue Time: 2022-01-05 14:54:24.0
Services: IASI Level 1 - Metop-B
IASI Sounding Products - Metop-B
EARS-IASI
IASI AHRPT Metop-B
OSI SAF - Products

Type: Planned Maintenance
Ann Nr: 7734
Rev: 1
Start Time: 2022-01-14 05:18:00.0
End Time: 2022-01-14 12:13:00.0
Satellites: Metop-C
Subsystem: IASI
Subject: instrument-calibration
Impact: data-unavailable
Detail: External Calibration. Lunar acquisition. CS2 campaign.
Status: scheduled
Issue Time: 2022-01-05 15:00:41.0
Services: IASI Level 1 - Metop-C
IASI Sounding products- Metop-C
EARS-IASI
IASI AHRPT Metop-C
OSI SAF - Products

Type: Service Enhancement
Ann Nr: 6944
Rev: 2
Start Time: 2022-01-17 09:00:00.0
End Time: 2022-01-17 09:00:00.0
Subject: general-announcement
Detail: Change to DCP messages disseminated on EUMETCast. They will no longer be wrapped into LRIT files and, instead, will be disseminated as individual files. This will also involve a filename change and a change of EUMETCast channels. For full details, see the URL provided below. [Rev. 2] Date changed from 9 November 2021 to 17 January 2022. To facilitate user transition, there will be a period of parallel dissemination from 17 January to 17 March 2022. For full details, see the URL provided below.
Url: https://www.eumetsat.int/change-dcp-messages-disseminated-eumetcast
Status: scheduled
Issue Time: 2021-10-18 14:43:13.0
Services: Meteosat 0° DCP
Meteosat IODC DCP

Type: Planned Maintenance
Ann Nr: 7680
Rev: 1
Start Time: 2022-01-17 09:00:00.0
End Time: 2022-01-24 09:00:00.0
Satellites: MET-11
Subject: instrument-decontamination
Impact: data-unavailable
Detail: SEVIRI decontamination. Meteosat-9 will cover the Full Earth Scan service during the decontamination period. Meteosat-9 data will also be disseminated on EUMETCast Europe one week before and one week after Meteosat-11 decontamination, i.e. from 10/01 to 31/01/2022. An outage of up to two repeat cycles can be expected when switching to and from Meteosat-9. Users wishing to receive the parallel Meteosat data streams on EUMETCast should register with our User Helpdesk (ops@eumetsat.int). For full details, see the URL provided below.
Url: https://www.eumetsat.int/upcoming-meteosat-11-seviri-decontamination-2022
Status: scheduled
Issue Time: 2021-12-16 14:33:33.0
Services: 0° SEVIRI Level 1.5 Image Data
0° Meteosat Meteorological Products

Type: Service Enhancement
Ann Nr: 7677
Rev: 1
Start Time: 2022-01-18 09:00:00.0
End Time: 2022-01-18 09:00:00.0
Subject: product-change
Detail: Release of new Processing Baselines for Sentinel-3 SLSTR Level 1 and Level 2 SST products. For full details, see the URL provided below.
Url: https://www.eumetsat.int/new-processing-baselines-slstr-level-1-2-sst
Status: scheduled
Issue Time: 2021-12-16 10:07:26.0
Services: SLSTR Level 1 Products - S3A
SLSTR Level 2 Marine Products - S3A
SLSTR Level 1 Products - S3B
SLSTR Level 2 Marine Products - S3B

Type: Planned Maintenance
Ann Nr: 7655
Rev: 1
Start Time: 2022-01-20 09:00:00.0
End Time: 2022-01-20 12:00:00.0
Satellites: Metop-B,Metop-C
Subsystem: IASI
Subject: general-announcement
Impact: no-impact
Detail: Instrument-calibration – new IASI L1 processing version 8.4.
Status: scheduled
Issue Time: 2021-12-09 14:20:45.0
Services: IASI Level 1 - Metop-B
IASI Level 1 - Metop-C
EARS-IASI

Type: Planned Maintenance
Ann Nr: 7678
Rev: 1
Start Time: 2022-01-23 09:00:00.0
End Time: 2022-01-23 12:00:00.0
Satellites: Metop-C
Subsystem: IASI
Subject: instrument-calibration
Impact: no-impact
Detail: Update of the on-board coding table for the scan mirror characterisation.
Status: scheduled
Issue Time: 2021-12-16 11:43:21.0
Services: IASI Level 1 - Metop-C
EARS-IASI

Type: Planned Maintenance
Ann Nr: 7679
Rev: 1
Start Time: 2022-01-23 09:00:00.0
End Time: 2022-01-23 12:00:00.0
Satellites: Metop-B
Subsystem: IASI
Subject: instrument-calibration
Impact: no-impact
Detail: Update of the on-board coding table for the scan mirror characterisation.
Status: scheduled
Issue Time: 2021-12-16 11:39:43.0
Services: IASI Level 1 - Metop-B
EARS-IASI

Type: Planned Maintenance
Ann Nr: 7743
Rev: 1
Start Time: 2022-01-26 09:00:00.0
End Time: 2022-01-26 09:00:00.0
Satellites: Metop-B
Subject: in-plane-manoeuvre
Impact: data-degraded
Detail: Routine in-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre.
Status: scheduled
Issue Time: 2022-01-06 09:51:33.0
Services: SEM L0 - Metop-B
AVHRR Level 1 - Metop-B
AMSU-A Level 1 - Metop-B
MHS Level 1 - Metop-B
HIRS Level 1 - Metop-B
ASCAT Level 1 - Metop-B
IASI Level 1 - Metop-B
GRAS Level 1 - Metop-B
ATOVS Sounding products - Metop-B
GOME-2 Level 1 - Metop-B
IASI Sounding Products - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
A-DCS AHRPT Metop-B
ASCAT AHRPT Metop-B
AMSU-A AHRPT Metop-B
AVHRR AHRPT Metop-B
GRAS AHRPT Metop-B
GOME-2 AHRPT Metop-B
HIRS AHRPT Metop-B
MHS AHRPT Metop-B
IASI AHRPT Metop-B
SEM AHRPT Metop-B

Type: Service Enhancement
Ann Nr: 7533
Rev: 1
Start Time: 2022-02-01 09:00:00.0
End Time: 2022-03-22 09:00:00.0
Subject: general-announcement
Detail: The EUMETCast Europe Basic Service channels will be reorganised in the first quarter of 2022. For full details, see the URL provided below.
Url: https://www.eumetsat.int/eumetcast-basic-service-channels-reorganisation
Status: scheduled
Issue Time: 2021-11-03 15:27:49.0
Services: EUMETCast-Europe

Type: Planned Maintenance
Ann Nr: 7741
Rev: 1
Start Time: 2022-02-01 11:45:00.0
End Time: 2022-02-01 13:19:00.0
Satellites: Metop-B
Subsystem: GRAS
Subject: general-announcement
Impact: data-unavailable
Detail: GRAS receiver software update.
Status: scheduled
Issue Time: 2022-01-05 16:12:10.0
Services: GRAS Level 1 - Metop-B

Type: Planned Maintenance
Ann Nr: 7742
Rev: 1
Start Time: 2022-02-02 12:15:00.0
End Time: 2022-02-02 13:51:00.0
Satellites: Metop-C
Subsystem: GRAS
Subject: general-announcement
Impact: data-unavailable
Detail: GRAS receiver software update.
Status: scheduled
Issue Time: 2022-01-05 16:13:39.0
Services: GRAS Level 1 - Metop-C

Type: Service Enhancement
Ann Nr: 7033
Rev: 3
Start Time: 2022-03-31 09:00:00.0
End Time: 2022-03-31 09:00:00.0
Subject: product-change
Detail: Principal Component (PC) compressed IASI L1C data will be updated in November 2021 (exact date to be announced in due course). For full details, see the URL provided below. [Rev. 2]: The update is being deferred to Q1 2022, with exact date to be announced in due course. [Rev. 3]: A live test data stream has been put in place. For details on how to access the data and how to use them, see the URL provided below.
Url: https://www.eumetsat.int/changes-pc-compressed-iasi-l1c-data
Status: scheduled
Issue Time: 2021-11-25 14:35:01.0
Services: IASI Level 1 - Metop-A
IASI Level 1 - Metop-B
IASI Level 1 - Metop-C

Type: Service Enhancement
Ann Nr: 7329
Rev: 1
Start Time: 2022-07-01 09:00:00.0
End Time: 2022-07-01 09:00:00.0
Subject: general-announcement
Detail: Transponder migration for the EUMETCast Europe High Volume Service planned for Q3 2022. For full details, see the URL provided below.
Url: https://www.eumetsat.int/eumetcast-europe-service-transponder-migration
Status: scheduled
Issue Time: 2021-09-08 16:58:29.0
Services: EUMETCast-Europe

Type: Service Enhancement
Ann Nr: 7414
Rev: 1
Start Time: 2022-10-01 09:00:00.0
End Time: 2022-10-01 09:00:00.0
Subject: product-change
Detail: File formats of Meteosat meteorological products distributed on EUMETCast are planned to be updated in October 2022. At the same time, there will be a small change in the timestamp of the AMV products distributed on the GTS. For full details and test data, see the URL provided below.
Url: https://www.eumetsat.int/change-file-formats-meteosat-meteorological-products
Status: scheduled
Issue Time: 2021-09-30 13:23:12.0
Services: 0° Meteosat Meteorological Products
IODC Meteosat Meteorological Products
RSS Meteosat Meteorological Products

Name: EUMETSAT
Address: Eumetsat-Allee 1
D-64295 Darmstadt
Germany
Telephone: +49 6151 807 3660/3770
Fax: +49 6151 807 3790
E-mail: ops@eumetsat.int
Internet: www.eumetsat.int

You are receiving this email because you are subscribed to our User Notification Service (UNS). You can modify your UNS subscriptions or unsubscribe at any time via our UNS web interface (login to our Earth Observation Portal required).

Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.