Message number: | 8473 |
Message creation: | Mon Nov 15 15:06:08 UTC 2021 |
Type: | Planned Maintenance |
Ann Nr: | 5596 |
Rev: | 2 |
Start Time: | 2020-01-29 00:00:00.0 |
End Time: | 2021-11-15 23:59:00.0 |
Satellites: | Metop-A |
Subsystem: | HRPT |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates.[Rev-2]: Update the Event End date. |
Status: | scheduled |
Issue Time: | 2021-10-08 07:20:05.0 |
Services: |
AMSU-A AHRPT Metop-A A-DCS AHRPT Metop-A ASCAT AHRPT Metop-A AVHRR AHRPT Metop-A GOME-2 AHRPT Metop-A HIRS AHRPT Metop-A IASI AHRPT Metop-A GRAS AHRPT Metop-A SEM AHRPT Metop-A MHS AHRPT Metop-A |
Type: | Service Enhancement |
Ann Nr: | 7468 |
Rev: | 1 |
Start Time: | 2021-10-15 09:00:00.0 |
End Time: | 2021-11-27 09:00:00.0 |
Satellites: | Metop-A |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | Metop-A Technology Test Campaign IV execution: possible data disruptions or outages. More information will be given in specific instruments announcements. |
Status: | scheduled |
Issue Time: | 2021-10-13 12:42:27.0 |
Services: |
Type: | Planned Maintenance |
Ann Nr: | 7523 |
Rev: | 1 |
Start Time: | 2021-11-09 09:00:00.0 |
End Time: | 2021-12-07 09:00:00.0 |
Satellites: | MET-10 |
Subject: | yearly-RSS-interruption |
Impact: | data-unavailable |
Detail: | Yearly interruption. Meteosat-10 Rapid Scanning Service (RSS) will be suspended for scheduled Full Earth Scanning and Ground Segment Maintenance. No gap-filling will be provided. |
Status: | scheduled |
Issue Time: | 2021-10-28 09:27:02.0 |
Services: |
RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 7545 |
Rev: | 2 |
Start Time: | 2021-11-11 10:00:00.0 |
End Time: | 2021-11-16 10:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-delay |
Detail: | Planned maintenance activity on the servers providing the Data Store service. Catalogue updates might be delayed. [Rev. 2] Start and End Date updated. |
Status: | scheduled |
Issue Time: | 2021-11-11 08:04:08.0 |
Services: |
Data Store and Data Tailor Web Service |
Type: | Service Enhancement |
Ann Nr: | 7525 |
Rev: | 1 |
Start Time: | 2021-11-11 13:00:00.0 |
End Time: | 2021-11-11 14:00:00.0 |
Subject: | general-announcement |
Detail: | Data access services - second drop-in session of a series of monthly open, online short sessions on our data access services and their usage via GUIs and APIs. For more details and registration, see the URL provided below. |
Url: | https://www.eumetsat.int/data-access-services-second-drop-session |
Status: | scheduled |
Issue Time: | 2021-10-28 11:58:12.0 |
Services: |
Type: | Planned Maintenance |
Ann Nr: | 7556 |
Rev: | 1 |
Start Time: | 2021-11-14 09:00:00.0 |
End Time: | 2021-11-14 09:00:00.0 |
Satellites: | Suomi NPP |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-11-10 14:42:24.0 |
Services: |
ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 7559 |
Rev: | 1 |
Start Time: | 2021-11-14 09:00:00.0 |
End Time: | 2021-11-14 09:00:00.0 |
Satellites: | NOAA-20 |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-11-10 16:01:07.0 |
Services: |
ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP - JPSS Copernicus data |
Type: | Service Enhancement |
Ann Nr: | 7498 |
Rev: | 1 |
Start Time: | 2021-11-15 12:00:00.0 |
End Time: | 2021-11-15 12:00:00.0 |
Satellites: | Metop-A |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | End of global and local mission for ALL remaining instruments and services: Metop-A data and products no longer available for the user community. |
Status: | scheduled |
Issue Time: | 2021-10-22 07:28:50.0 |
Services: |
SEM L0 - Metop-A AMSU-A Level 1 - Metop-A AVHRR Level 1 - Metop-A MHS Level 1 - Metop-A HIRS Level 1 - Metop-A ASCAT Level 1 - Metop-A GRAS Level 1 - Metop-A ATOVS Sounding products - Metop-A ASCAT Soil Moisture - Metop-A GOME-2 Level 1 - Metop-A AVHRR Polar Winds - Metop-A Multi-Sensor Products - Metop-A A-DCS AHRPT Metop-A ASCAT AHRPT Metop-A AMSU-A AHRPT Metop-A AVHRR AHRPT Metop-A GOME-2 AHRPT Metop-A GRAS AHRPT Metop-A HIRS AHRPT Metop-A IASI AHRPT Metop-A MHS AHRPT Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 7557 |
Rev: | 1 |
Start Time: | 2021-11-15 13:00:00.0 |
End Time: | 2021-11-15 20:00:00.0 |
Satellites: | Metop-B |
Subject: | ground-segment-maintenance |
Impact: | risk-of-delay |
Detail: | McMurdo Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system might be interrupted. Therefore only nominal Arctic timeliness might be available during this period. |
Status: | scheduled |
Issue Time: | 2021-11-10 14:44:14.0 |
Services: |
SEM L0 - Metop-B AVHRR Level 1 - Metop-B AMSU-A Level 1 - Metop-B MHS Level 1 - Metop-B HIRS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GRAS Level 1 - Metop-B ATOVS Sounding products - Metop-B GOME-2 Level 1 - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B IASI Sounding Products - Metop-B Multi-Sensor Products - Metop-B Multi-Metop Wind Products |
Type: | Planned Maintenance |
Ann Nr: | 7566 |
Rev: | 1 |
Start Time: | 2021-11-15 14:37:00.0 |
End Time: | 2021-11-15 14:43:00.0 |
Satellites: | Metop-C |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | Gain Compression |
Status: | scheduled |
Issue Time: | 2021-11-12 08:06:01.0 |
Services: |
ASCAT Soil Moisture - Metop-C ASCAT Level 1 - Metop-C EARS-ASCAT ASCAT AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7567 |
Rev: | 1 |
Start Time: | 2021-11-15 21:09:00.0 |
End Time: | 2021-11-16 04:00:00.0 |
Satellites: | Metop-C |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Status: | scheduled |
Issue Time: | 2021-11-12 08:07:13.0 |
Services: |
IASI Sounding products- Metop-C IASI Level 1 - Metop-C EARS-IASI IASI AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7564 |
Rev: | 1 |
Start Time: | 2021-11-15 21:59:00.0 |
End Time: | 2021-11-16 04:50:00.0 |
Satellites: | Metop-B |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | External Calibration |
Status: | scheduled |
Issue Time: | 2021-11-12 08:03:43.0 |
Services: |
IASI Level 1 - Metop-B IASI Sounding Products - Metop-B EARS-IASI IASI AHRPT Metop-B OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7574 |
Rev: | 1 |
Start Time: | 2021-11-16 00:00:00.0 |
End Time: | 2021-12-01 00:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | data-unavailable |
Detail: | National Satellite Meteorological Center of CMA will exercise an orbital control to FY-3D. During the period, all operational instruments on FY-3D will be switched-off, and data reception and service will be suspended. |
Status: | scheduled |
Issue Time: | 2021-11-15 15:02:43.0 |
Services: |
EARS-MWRI EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 7552 |
Rev: | 1 |
Start Time: | 2021-11-16 01:00:00.0 |
End Time: | 2021-11-16 04:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Lannion Station Data Line maintenance. There may be disruption to the listed EUMETSAT based services. |
Status: | scheduled |
Issue Time: | 2021-11-10 15:18:41.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-MWRI EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-NWC EARS-VIIRS EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 7563 |
Rev: | 1 |
Start Time: | 2021-11-16 08:07:00.0 |
End Time: | 2021-11-16 08:14:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-11-12 08:02:24.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 7558 |
Rev: | 1 |
Start Time: | 2021-11-16 08:46:00.0 |
End Time: | 2021-11-22 09:33:00.0 |
Subject: | ground-segment-maintenance |
Impact: | data-unavailable |
Detail: | Due to Metop-A EOL support and conflicts, there will be no support for NOAA-19 from the EUMETSAT Svalbard Ground Station. Therefore NOAA-19 data for the listed orbits will not be acquired at Svalbard and will be unavailable on EUMETCast. |
Orbits: | 65837,65865,65866,65868,65879,65880,65893,65894,65897,65907,65908,65911,65912,65922 |
Status: | scheduled |
Issue Time: | 2021-11-10 15:58:13.0 |
Services: |
AVHRR Level 1 - NOAA AMSU-A Level 1 - NOAA MHS Level 1 - NOAA HIRS Level 1 - NOAA ATOVS Sounding products - NOAA |
Type: | Service Enhancement |
Ann Nr: | 6863 |
Rev: | 1 |
Start Time: | 2021-11-16 09:00:00.0 |
End Time: | 2021-11-16 09:00:00.0 |
Satellites: | Metop-A |
Subject: | general-announcement |
Detail: | Metop-A is planned to be de-orbited in November 2021. For more details, see the URL provided below. |
Url: | https://www.eumetsat.int/plans-metop-end-life |
Status: | scheduled |
Issue Time: | 2021-04-01 13:02:07.0 |
Services: |
Type: | Planned Maintenance |
Ann Nr: | 7565 |
Rev: | 1 |
Start Time: | 2021-11-16 09:00:00.0 |
End Time: | 2021-11-16 09:07:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-11-12 08:04:43.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 7550 |
Rev: | 1 |
Start Time: | 2021-11-16 09:00:00.0 |
End Time: | 2021-11-16 13:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | Data Centre archive maintenance. During this time, the Data Centre archive catalogue will not be updated and the processing of orders will be suspended. Following the maintenance, catalogue updates may be delayed due to necessary recovery activities. Users are invited to check out the Data Store. |
Status: | scheduled |
Issue Time: | 2021-11-10 09:39:54.0 |
Services: |
EUMETSAT Data Centre |
Type: | Planned Maintenance |
Ann Nr: | 7551 |
Rev: | 1 |
Start Time: | 2021-11-16 13:00:00.0 |
End Time: | 2021-11-18 15:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Kangerlussuaq Station Network maintenance. There may be disruption to the listed EUMETSAT regional services during the following periods: on 16 November 2021 between 13:00 and 15:00 UTC, and on 18 November 2021 between 13:00 and 15:00 UTC. |
Status: | scheduled |
Issue Time: | 2021-11-10 15:21:08.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-MWRI EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-VIIRS EARS-NWC EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 7560 |
Rev: | 1 |
Start Time: | 2021-11-16 18:00:00.0 |
End Time: | 2021-11-17 20:30:00.0 |
Satellites: | GOES-16 |
Subject: | instrument-calibration |
Impact: | data-degraded |
Detail: | NOAA have announced a GOES-16 (GOES-EAST) SEISS MPS-LO Electron and Ion Microchannel Plate (MCP) HV Bias Calibration from 16 November 1800z to 17 November 2030z. The calibration will consist of 2 hours of commanding followed by a 24.5 hour power off of the MPS-LO Deflection Electrode High Voltage (required for performance data collection). SEISS MPS-LO will experience data degradation during this 26.5 hour period until the Deflection Electrode High Voltage is powered back on returning the sensor to nominal operation. The SEISS MPS-LO Calibration will be cancelled due to Critical Weather Day or if the Space Weather environment is not appropriate for the calibration. |
Status: | scheduled |
Issue Time: | 2021-11-10 15:04:19.0 |
Services: |
GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 7553 |
Rev: | 1 |
Start Time: | 2021-11-16 19:45:00.0 |
End Time: | 2021-11-17 05:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Moscow Node Data Line Maintenance. There may be disruption to the listed EUMETSAT regional services. |
Status: | scheduled |
Issue Time: | 2021-11-10 10:51:47.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-NWC |
Type: | Service Enhancement |
Ann Nr: | 7561 |
Rev: | 1 |
Start Time: | 2021-11-17 08:47:00.0 |
Satellites: | Sentinel-3A |
Subject: | service-change |
Detail: | Extra transponder measurements for Sentinel-3A SRAL: Starting 17/11/2021 at 08:47:40 UTC, Sentinel-3A will start using a transponder site in Gavdos, Greece. Degradation of data, as per non-nominal acquisition mode, is expected for a duration of about 6 seconds over the transponder location (34°50'18.69208" North latitude, 24°06'32.25707" East longitude) for all relative orbits number (RON) 335 (as it can be seen in the product filename) - from cycle 78 (inclusive) onwards. |
Status: | scheduled |
Issue Time: | 2021-11-11 08:50:41.0 |
Services: |
SRAL Level 1 Products - S3A |
Type: | Planned Maintenance |
Ann Nr: | 7549 |
Rev: | 1 |
Start Time: | 2021-11-17 09:00:00.0 |
End Time: | 2021-11-17 11:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | Planned maintenance activity on the servers providing the Data Store and Data Tailor Web Service. |
Status: | scheduled |
Issue Time: | 2021-11-10 09:35:39.0 |
Services: |
Data Store and Data Tailor Web Service |
Type: | Planned Maintenance |
Ann Nr: | 7568 |
Rev: | 1 |
Start Time: | 2021-11-17 21:00:00.0 |
End Time: | 2021-11-18 03:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Moscow Node Data Line Maintenance. There may be disruption to the listed EUMETSAT regional services. |
Status: | scheduled |
Issue Time: | 2021-11-12 08:12:23.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-ASCAT EARS-ATMS EARS-IASI EARS-CrlS EARS-NWC |
Type: | Service Enhancement |
Ann Nr: | 7554 |
Rev: | 1 |
Start Time: | 2021-11-18 09:00:00.0 |
End Time: | 2021-11-18 09:00:00.0 |
Subject: | product-change |
Detail: | Release of a new processing baseline, PB 3.01, for Sentinel-3 OLCI Level 1 data. For more details, see the URL provided below. |
Url: | https://www.eumetsat.int/new-processing-baseline-sentinel-3-olci-level-1-data |
Status: | scheduled |
Issue Time: | 2021-11-10 14:08:16.0 |
Services: |
OLCI Level 1 Products - S3A OLCI Level 1 Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 7555 |
Rev: | 1 |
Start Time: | 2021-11-18 09:00:00.0 |
End Time: | 2021-11-18 09:00:00.0 |
Satellites: | Suomi NPP |
Subject: | out-of-plane-manoeuvre |
Impact: | data-unavailable |
Detail: | Inclination Adjustment Manoeuvre (IAM).This may cause data to be unavailable or degraded during the mentioned period. The exact time will be announced closer to the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-11-10 16:06:52.0 |
Services: |
ATMS Level 1 - Suomi-NPP CrlS Level 1 - Suomi-NPP VIIRS EDR - Suomi-NPP EARS-ATMS EARS-CrlS EARS-VIIRS Atmospheric Products-Suomi NPP Marine Products-Suomi NPP |
Type: | Planned Maintenance |
Ann Nr: | 7562 |
Rev: | 1 |
Start Time: | 2021-11-18 22:30:00.0 |
End Time: | 2021-11-19 00:30:00.0 |
Satellites: | GOES-17 |
Subject: | instrument-calibration |
Impact: | service-degraded |
Detail: | A GOES-17 ABI Encoder and FTE Calibration will be performed, resulting in two ABI product outages. First outage is planned between 18 Nov 2230Z and 18 Nov 2300Z. Second outage is planned between 19 Nov 0000Z and 19 Nov 0030Z. Products may be degraded between outages. If Critical Weather Day (CWD) is declared prior to 18 Nov 2230Z the calibration will be postponed. |
Status: | scheduled |
Issue Time: | 2021-11-10 16:11:48.0 |
Services: |
GOES Products |
Type: | Service Enhancement |
Ann Nr: | 6269 |
Rev: | 4 |
Start Time: | 2021-12-15 09:00:00.0 |
End Time: | 2021-12-15 09:00:00.0 |
Subject: | service-change |
Detail: | Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data will be removed from EUMETCast Satellite on 29 July 2021. Alternative services to access these data are available. For full details, see the URL provided below. [Rev. 2]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 3]: The removal of Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite, initially planned for 29 July 2021, is being deferred to a later date (likely to be during the last quarter of 2021). This is to allow more time for users to transition to alternative access services. [Rev. 4]: The removal of OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite will take place on 15 December 2021. For more details, see the URL provided below. |
Url: | https://www.eumetsat.int/S3-olci-l1-nrt-on-eumetcast-satellite-removed |
Status: | scheduled |
Issue Time: | 2021-09-23 09:13:48.0 |
Services: |
OLCI Level 1 Products - S3A OLCI Level 1 Products - S3B |
Type: | Service Enhancement |
Ann Nr: | 6944 |
Rev: | 2 |
Start Time: | 2022-01-17 09:00:00.0 |
End Time: | 2022-01-17 09:00:00.0 |
Subject: | general-announcement |
Detail: | Change to DCP messages disseminated on EUMETCast. They will no longer be wrapped into LRIT files and, instead, will be disseminated as individual files. This will also involve a filename change and a change of EUMETCast channels. For full details, see the URL provided below. [Rev. 2] Date changed from 9 November 2021 to 17 January 2022. To facilitate user transition, there will be a period of parallel dissemination from 17 January to 17 March 2022. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/change-dcp-messages-disseminated-eumetcast |
Status: | scheduled |
Issue Time: | 2021-10-18 14:43:13.0 |
Services: |
Meteosat 0° DCP Meteosat IODC DCP |
Type: | Service Enhancement |
Ann Nr: | 7533 |
Rev: | 1 |
Start Time: | 2022-02-01 09:00:00.0 |
End Time: | 2022-03-22 09:00:00.0 |
Subject: | general-announcement |
Detail: | The EUMETCast Europe Basic Service channels will be reorganised in the first quarter of 2022. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/eumetcast-basic-service-channels-reorganisation |
Status: | scheduled |
Issue Time: | 2021-11-03 15:27:49.0 |
Services: |
EUMETCast-Europe |
Type: | Service Enhancement |
Ann Nr: | 7033 |
Rev: | 2 |
Start Time: | 2022-03-31 09:00:00.0 |
End Time: | 2022-03-31 09:00:00.0 |
Subject: | product-change |
Detail: | Principal Component (PC) compressed IASI L1C data will be updated in November 2021 (exact date to be announced in due course). For full details, see the URL provided below. [Rev. 2]: The update is being deferred to Q1 2022, with exact date to be announced in due course. |
Url: | https://www.eumetsat.int/changes-pc-compressed-iasi-l1c-data |
Status: | scheduled |
Issue Time: | 2021-10-05 15:22:25.0 |
Services: |
IASI Level 1 - Metop-A IASI Level 1 - Metop-B IASI Level 1 - Metop-C |
Type: | Service Enhancement |
Ann Nr: | 7329 |
Rev: | 1 |
Start Time: | 2022-07-01 09:00:00.0 |
End Time: | 2022-07-01 09:00:00.0 |
Subject: | general-announcement |
Detail: | Transponder migration for the EUMETCast Europe High Volume Service planned for Q3 2022. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/eumetcast-europe-service-transponder-migration |
Status: | scheduled |
Issue Time: | 2021-09-08 16:58:29.0 |
Services: |
EUMETCast-Europe |
Type: | Service Enhancement |
Ann Nr: | 7414 |
Rev: | 1 |
Start Time: | 2022-10-01 09:00:00.0 |
End Time: | 2022-10-01 09:00:00.0 |
Subject: | product-change |
Detail: | File formats of Meteosat meteorological products distributed on EUMETCast are planned to be updated in October 2022. At the same time, there will be a small change in the timestamp of the AMV products distributed on the GTS. For full details and test data, see the URL provided below. |
Url: | https://www.eumetsat.int/change-file-formats-meteosat-meteorological-products |
Status: | scheduled |
Issue Time: | 2021-09-30 13:23:12.0 |
Services: |
0° Meteosat Meteorological Products IODC Meteosat Meteorological Products RSS Meteosat Meteorological Products |
Name: | EUMETSAT |
Address: |
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |