| Topic: Weekly Operations Schedule - Week 26 Issue 2 - added announcements 7074 - 7077 Date/Time Issued: June 21, 2021 1532Z
Product(s) or Data Impacted: See list below.
Date/Time of Initial Impact: June 21, 2021 1334Z (from the Eumetsat Weekly Operations Schedule message)
Date/Time of Expected End: See table in detail for on and off switch time
Length of Outage: N/A
Details/Specifics of Change:
Message number: | 7992 | Message creation: | Mon Jun 21 13:34:45 UTC 2021 |
Type: | Planned Maintenance | Ann Nr: | 5475 | Rev: | 13 | Start Time: | 2020-01-06 00:00:00.0 | End Time: | 2021-07-25 00:00:00.0 | Satellites: | Metop-A | Subsystem: | ASCAT | Subject: | general-announcement | Impact: | risk-of-interruption | Detail: | Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. [Rev. 3] End date updated to 19th April 2020.[Rev. 4] End date updated. [Rev. 5] End date updated. [Rev. 6] End date updated. [Rev 7] End date updated. [Rev 8] End date updated. [Rev 9] End date updated. [Rev. 10] End date updated. [Rev. 11] End date updated. [Rev. 12] End date updated. [Rev. 13] End date updated. | Status: | scheduled | Issue Time: | 2021-06-16 16:33:36.0 | Services: | ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A
|
Type: | Planned Maintenance | Ann Nr: | 5596 | Rev: | 1 | Start Time: | 2020-01-29 00:00:00.0 | End Time: | 2021-12-31 23:59:00.0 | Satellites: | Metop-A | Subsystem: | HRPT | Subject: | general-announcement | Impact: | data-unavailable | Detail: | HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates. | Status: | scheduled | Issue Time: | 2020-02-03 10:12:03.0 | Services: | A-DCS AHRPT Metop-A ASCAT AHRPT Metop-A AMSU-A AHRPT Metop-A AVHRR AHRPT Metop-A IASI AHRPT Metop-A HIRS AHRPT Metop-A GRAS AHRPT Metop-A MHS AHRPT Metop-A GOME-2 AHRPT Metop-A SEM AHRPT Metop-A
|
Type: | Service Enhancement | Ann Nr: | 6269 | Rev: | 3 | Subject: | service-change | Detail: | Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data will be removed from EUMETCast Satellite on 29 July 2021. Alternative services to access these data are available. For full details, see the URL provided below. [Rev. 2]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 3]: The removal of Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite, initially planned for 29 July 2021, is being deferred to a later date (likely to be during the last quarter of 2021). This is to allow more time for users to transition to alternative access services. | Url: | https://www.eumetsat.int/S3-olci-l1-nrt-on-eumetcast-satellite-removed | Status: | scheduled | Issue Time: | 2021-01-26 16:03:54.0 | Services: | OLCI Level 1 Products - S3A OLCI Level 1 Products - S3B
|
Type: | Planned Maintenance | Ann Nr: | 7032 | Rev: | 1 | Start Time: | 2021-06-21 00:00:00.0 | End Time: | 2021-08-20 00:00:00.0 | Satellites: | Metop-A | Subsystem: | ASCAT | Subject: | general-announcement | Impact: | risk-of-interruption | Detail: | ASCAT Extensive Calibration. Short outages of the ASCAT GDS Level 1, soil moisture and global and regional winds products can be expected, during satellite passes over Turkey. | Status: | scheduled | Issue Time: | 2021-06-02 12:13:16.0 | Services: | ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A
|
Type: | Planned Maintenance | Ann Nr: | 7065 | Rev: | 1 | Start Time: | 2021-06-21 09:00:00.0 | End Time: | 2021-06-21 09:00:00.0 | Satellites: | Suomi NPP | Subject: | VIIRS Lunar Roll | Impact: | data-unavailable | Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. | Status: | scheduled | Issue Time: | 2021-06-16 15:28:31.0 | Services: | ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP - JPSS Copernicus data
|
Type: | Planned Maintenance | Ann Nr: | 7066 | Rev: | 1 | Start Time: | 2021-06-21 09:00:00.0 | End Time: | 2021-06-21 09:00:00.0 | Satellites: | NOAA-20 | Subject: | VIIRS Lunar Roll | Impact: | data-unavailable | Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. | Status: | scheduled | Issue Time: | 2021-06-16 15:29:04.0 | Services: | ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS SNPP - JPSS Copernicus data
|
Type: | Planned Maintenance | Ann Nr: | 7064 | Rev: | 1 | Start Time: | 2021-06-21 14:00:00.0 | End Time: | 2021-06-21 16:00:00.0 | Satellites: | GOES-16,GOES-17 | Subject: | instrument-maintenance | Impact: | no-impact | Detail: | A GOES-16/17 software patch is planned to go live on June 21, 2021 between 1400-1600 UTC. No data outage will occur when the updates go live. These updates will result in changes to all GOES-16/17 Level 1b (L1b) products and some Level 2 (L2) products as detailed in NOAA ESPC announcement. For more information please follow the URL below. | Url: | https://www.ospo.noaa.gov/data/messages/2021/MSG162202402.html | Status: | scheduled | Issue Time: | 2021-06-16 15:26:26.0 | Services: | GOES Products
|
Type: | Planned Maintenance | Ann Nr: | 7058 | Rev: | 1 | Start Time: | 2021-06-21 14:26:00.0 | End Time: | 2021-06-21 14:32:00.0 | Satellites: | Metop-B | Subsystem: | ASCAT | Subject: | instrument-calibration | Impact: | data-unavailable | Detail: | Gain Compression | Status: | scheduled | Issue Time: | 2021-06-16 14:11:48.0 | Services: | ASCAT Level 1 - Metop-B ASCAT Soil Moisture - Metop-B EARS-ASCAT ASCAT AHRPT Metop-B OSI SAF - Products
|
Type: | Planned Maintenance | Ann Nr: | 7068 | Rev: | 1 | Start Time: | 2021-06-22 00:15:00.0 | End Time: | 2021-06-25 05:10:00.0 | Satellites: | Metop-B | Subject: | ground-segment-maintenance | Impact: | data-delayed | Detail: | McMurdo MG1 antenna monthly Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be impacted during the following maintenance period. Therefore only nominal Arctic timeliness will be available on 24 June from 01:10 to 05:10 UTC. Additionally a risk of high timeliness has been identified during the following maintenance periods: On 22 June: 00:15-01:15Z, 02:00-03:00Z, 03:30-04:30Z, 20:30-21:30Z and 22:15-23:15Z, on 23 June: 03:15-04:15Z, on 24 June 01:10-05:10Z, and on 25 June 01:00-20:00Z, 02:30-03:30Z and 04:10-05:10Z. | Status: | scheduled | Issue Time: | 2021-06-16 16:04:39.0 | Services: | AMSU-A Level 1 - Metop-B AVHRR Level 1 - Metop-B SEM L0 - Metop-B MHS Level 1 - Metop-B GRAS Level 1 - Metop-B IASI Level 1 - Metop-B GOME-2 Level 1 - Metop-B ASCAT Level 1 - Metop-B HIRS Level 1 - Metop-B ATOVS Sounding products - Metop-B IASI Sounding Products - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B ASCAT Soil Moisture - Metop-B Multi-Metop Wind Products
|
Type: | Planned Maintenance | Ann Nr: | 7059 | Rev: | 1 | Start Time: | 2021-06-22 06:56:00.0 | End Time: | 2021-06-22 12:09:00.0 | Satellites: | Metop-B | Subsystem: | IASI | Subject: | instrument-calibration | Impact: | data-unavailable | Detail: | External Calibration. Lunar acquisition. CS2 campaign | Status: | scheduled | Issue Time: | 2021-06-16 14:15:05.0 | Services: | IASI Sounding Products - Metop-B IASI Level 1 - Metop-B EARS-IASI IASI AHRPT Metop-B OSI SAF - Products
|
Type: | Planned Maintenance | Ann Nr: | 7062 | Rev: | 1 | Start Time: | 2021-06-22 07:51:00.0 | End Time: | 2021-06-22 13:03:00.0 | Satellites: | Metop-C | Subsystem: | IASI | Subject: | instrument-calibration | Impact: | data-unavailable | Detail: | External Calibration. Lunar acquisition. CS2 campaign | Status: | scheduled | Issue Time: | 2021-06-16 14:19:49.0 | Services: | IASI Sounding products- Metop-C IASI Level 1 - Metop-C EARS-IASI IASI AHRPT Metop-C OSI SAF - Products
|
Type: | Planned Maintenance | Ann Nr: | 7060 | Rev: | 1 | Start Time: | 2021-06-22 08:01:00.0 | End Time: | 2021-06-22 08:08:00.0 | Satellites: | Metop-C | Subsystem: | SEM | Component: | MEPED | Subject: | instrument-calibration | Impact: | data-unavailable | Detail: | SEM MEPED in flight calibration. | Status: | scheduled | Issue Time: | 2021-06-16 14:16:54.0 | Services: | SEM L0 - Metop-C SEM AHRPT Metop-C
|
Type: | Planned Maintenance | Ann Nr: | 7061 | Rev: | 1 | Start Time: | 2021-06-22 08:01:00.0 | End Time: | 2021-06-22 09:44:00.0 | Satellites: | Metop-C | Subsystem: | SEM | Component: | TED | Subject: | instrument-calibration | Impact: | data-unavailable | Detail: | SEM TED in flight calibration. | Status: | scheduled | Issue Time: | 2021-06-16 14:17:44.0 | Services: | SEM L0 - Metop-C SEM AHRPT Metop-C
|
Type: | Planned Maintenance | Ann Nr: | 7057 | Rev: | 1 | Start Time: | 2021-06-22 08:49:00.0 | End Time: | 2021-06-22 08:56:00.0 | Satellites: | Metop-B | Subsystem: | SEM | Component: | MEPED | Subject: | instrument-calibration | Impact: | data-unavailable | Detail: | SEM MEPED in flight calibration. | Status: | scheduled | Issue Time: | 2021-06-16 14:10:22.0 | Services: | SEM L0 - Metop-B SEM AHRPT Metop-B
|
Type: | Service Enhancement | Ann Nr: | 7069 | Rev: | 1 | Start Time: | 2021-06-22 09:00:00.0 | End Time: | 2021-06-22 09:00:00.0 | Subject: | new-product | Detail: | Public release of the first operational Copernicus Sentinel-6 Michael Freilich products: Low Resolution Level 1B and Level 2 products from the Poseidon-4 Altimeter, and Level 2 products from the Advanced Microwave Radiometer (AMR). For full details, see the URL provided below. | Url: | https://www.eumetsat.int/sentinel-6-first-products | Status: | scheduled | Issue Time: | 2021-06-17 12:42:31.0 | Services: | |
Type: | Planned Maintenance | Ann Nr: | 7054 | Rev: | 1 | Start Time: | 2021-06-22 09:00:00.0 | End Time: | 2021-06-24 09:00:00.0 | Satellites: | MET-10 | Subject: | monthly-RSS-interruption | Impact: | data-unavailable | Detail: | Monthly interruption. Meteosat-10 Rapid Scanning Service (RSS) will be suspended for scheduled Full Earth Scanning and Ground Segment Maintenance. Meteosat-9 RSS image data, rectified to 9.5 deg E, replaces the Meteosat-10 service. The RSS meteorological product service is not available during this timeframe. An outage of 15 minutes (or slightly more) can be expected when switching to and from Meteosat-9. | Status: | scheduled | Issue Time: | 2021-06-16 14:05:05.0 | Services: | RSS Meteosat Meteorological Products RSS SEVIRI Level 1.5 Image Data
|
Type: | Planned Maintenance | Ann Nr: | 7055 | Rev: | 1 | Start Time: | 2021-06-22 09:14:00.0 | End Time: | 2021-06-22 09:21:00.0 | Satellites: | Metop-A | Subsystem: | SEM | Component: | MEPED | Subject: | instrument-calibration | Impact: | data-unavailable | Detail: | SEM MEPED in flight calibration. | Status: | scheduled | Issue Time: | 2021-06-16 14:06:43.0 | Services: | SEM L0 - Metop-A SEM AHRPT Metop-A
|
Type: | Planned Maintenance | Ann Nr: | 7075 | Rev: | 1 | Start Time: | 2021-06-22 11:00:00.0 | End Time: | 2021-06-22 11:10:00.0 | Satellites: | GOES-16 | Subject: | instrument-calibration | Detail: | A GOES-16 ABI solar calibration scan is planned on 22 June 2021. Between 11:05 and 11:10 UTC GOES-16 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G16_s20211731105[SSS]_e20211731110[SSS]_c202117311[mmssSSS]-118900_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 11:10 UTC. | Status: | scheduled | Issue Time: | 2021-06-21 13:15:19.0 | Services: | GOES Products
|
Type: | Planned Maintenance | Ann Nr: | 7074 | Rev: | 1 | Start Time: | 2021-06-22 16:00:00.0 | End Time: | 2021-06-22 16:10:00.0 | Satellites: | GOES-16 | Subject: | instrument-calibration | Detail: | A GOES-16 ABI routine desert monitoring calibration scan is planned on 22 June 2021. Between 16:05 UTC and 16:10 UTC GOES-16 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G16_s20211731605[SSS]_e20211731610[SSS]_c202117316[mmssSSS]-118900_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 16:10 UTC | Status: | scheduled | Issue Time: | 2021-06-21 13:14:50.0 | Services: | GOES Products
|
Type: | Planned Maintenance | Ann Nr: | 7067 | Rev: | 1 | Start Time: | 2021-06-23 08:57:00.0 | End Time: | 2021-06-24 09:02:00.0 | Satellites: | NOAA-19 | Subject: | ground-segment-maintenance | Impact: | data-unavailable | Detail: | Due to maintenance, there will be no support for NOAA-19 from the EUMETSAT Svalbard Ground Station. Therefore NOAA-19 data for the listed orbits will not be acquired at Svalbard and will be unavailable on EUMETCast. | Orbits: | 63776,63779,63790 | Status: | scheduled | Issue Time: | 2021-06-16 15:41:59.0 | Services: | AVHRR Level 1 - NOAA AMSU-A Level 1 - NOAA MHS Level 1 - NOAA ATOVS Sounding products - NOAA HIRS Level 1 - NOAA
|
Type: | Planned Maintenance | Ann Nr: | 7063 | Rev: | 1 | Start Time: | 2021-06-23 10:00:00.0 | End Time: | 2021-06-23 10:15:00.0 | Subject: | ground-segment-maintenance | Impact: | risk-of-interruption | Detail: | Fucino Ground Station data link upgrade. Interruptions might be observed during the maintenance period. | Status: | scheduled | Issue Time: | 2021-06-16 15:17:52.0 | Services: | RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products
|
Type: | Planned Maintenance | Ann Nr: | 7056 | Rev: | 1 | Start Time: | 2021-06-24 04:51:00.0 | End Time: | 2021-06-24 09:51:00.0 | Satellites: | Metop-A | Subsystem: | IASI | Subject: | instrument-calibration | Impact: | data-unavailable | Detail: | External Calibration | Status: | scheduled | Issue Time: | 2021-06-16 14:09:14.0 | Services: | IASI Level 1 - Metop-A IASI Sounding Products - Metop-A EARS-IASI IASI AHRPT Metop-A OSI SAF - Products
|
Type: | Planned Maintenance | Ann Nr: | 7077 | Rev: | 1 | Start Time: | 2021-06-24 15:10:00.0 | End Time: | 2021-06-24 15:20:00.0 | Satellites: | GOES-17 | Subject: | ground-segment-maintenance | Detail: | A GOES-17 ABI solar calibration scan is planned on 24 June 2021. Between 1515 UTC and 1520 UTC. GOES-17 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G17_s20211751515[SSS]_e20211751520[SSS]_c202117503[mmssSSS]-129601_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 15:20 UTC. | Status: | scheduled | Issue Time: | 2021-06-21 13:25:37.0 | Services: | GOES Products
|
Type: | Planned Maintenance | Ann Nr: | 7076 | Rev: | 1 | Start Time: | 2021-06-24 20:00:00.0 | End Time: | 2021-06-24 20:10:00.0 | Satellites: | GOES-17 | Subject: | instrument-calibration | Detail: | A GOES-17 ABI routine desert monitoring calibration scan is planned on 24 June 2021. Between 20:05 UTC and 20:10 UTC GOES-17 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G17_s20211752005[SSS]_e20211752010[SSS]_c202117520[mmssSSS]-129601_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 20:10 UTC | Status: | scheduled | Issue Time: | 2021-06-21 13:26:04.0 | Services: | GOES Products
|
Type: | Service Enhancement | Ann Nr: | 6836 | Rev: | 1 | Start Time: | 2021-06-30 09:00:00.0 | End Time: | 2021-06-30 09:00:00.0 | Subject: | general-announcement | Detail: | Discontinuation of the Meteosat SEVIRI Total Ozone product. For more details, see the URL provided below. | Url: | https://www.eumetsat.int/meteosat-seviri-total-ozone-product-discontinued | Status: | scheduled | Issue Time: | 2021-03-24 15:20:09.0 | Services: | 0° Meteosat Meteorological Products IODC Meteosat Meteorological Products
|
Type: | Service Enhancement | Ann Nr: | 6964 | Rev: | 1 | Start Time: | 2021-07-07 09:00:00.0 | End Time: | 2021-07-07 09:00:00.0 | Subject: | product-change | Detail: | Update to a sub-set of IASI Level 2 BUFR products: IASI Ozone, IASI Carbon Monoxide Profiles FORLI-CO and IASI HNO3. For full details, see the URL provided below. | Url: | https://www.eumetsat.int/update-iasi-level-2-bufr-products | Status: | scheduled | Issue Time: | 2021-05-11 14:32:28.0 | Services: | IASI Sounding Products - Metop-A IASI Sounding Products - Metop-B IASI Sounding products- Metop-C
|
Type: | Planned Maintenance | Ann Nr: | 7007 | Rev: | 2 | Start Time: | 2021-07-26 00:00:00.0 | Satellites: | Metop-A | Subsystem: | HRPT | Subject: | general-announcement | Impact: | data-unavailable | Detail: | HRPT switching zone update. Risk of interruption. An update of the Metop-A on-board HRPT switching zones timings will be performed to compensate for the zone update in geolocation due to the spacecraft drifting orbit. This will result in a shift in HRPT switching zones by 6 degree eastward. HRPT users near the borders of switching zones may experience degradation in service availability for Metop-A HRPT. [Rev. 2] Start date updated. | Status: | scheduled | Issue Time: | 2021-06-16 16:31:07.0 | Services: | A-DCS AHRPT Metop-A AMSU-A AHRPT Metop-A ASCAT AHRPT Metop-A AVHRR AHRPT Metop-A GRAS AHRPT Metop-A GOME-2 AHRPT Metop-A IASI AHRPT Metop-A HIRS AHRPT Metop-A MHS AHRPT Metop-A SEM AHRPT Metop-A
|
Type: | Service Enhancement | Ann Nr: | 7033 | Rev: | 1 | Start Time: | 2021-11-01 09:00:00.0 | End Time: | 2021-11-01 09:00:00.0 | Subject: | product-change | Detail: | Principal Component (PC) compressed IASI L1C data will be updated in November 2021 (exact date to be announced in due course). For full details, see the URL provided below. | Url: | https://www.eumetsat.int/changes-pc-compressed-iasi-l1c-data | Status: | scheduled | Issue Time: | 2021-06-02 13:18:50.0 | Services: | IASI Level 1 - Metop-A IASI Level 1 - Metop-B IASI Level 1 - Metop-C
|
Type: | Service Enhancement | Ann Nr: | 6944 | Rev: | 1 | Start Time: | 2021-11-09 09:00:00.0 | End Time: | 2021-11-09 09:00:00.0 | Subject: | general-announcement | Detail: | Change to DCP messages disseminated on EUMETCast. They will no longer be wrapped into LRIT files and, instead, will be disseminated as individual files. This will also involve a filename change and a change of EUMETCast channels. For full details, see the URL provided below. | Url: | https://www.eumetsat.int/change-dcp-messages-disseminated-eumetcast | Status: | scheduled | Issue Time: | 2021-04-29 13:24:50.0 | Services: | Meteosat 0° DCP Meteosat IODC DCP
|
Type: | Service Enhancement | Ann Nr: | 6863 | Rev: | 1 | Start Time: | 2021-11-16 09:00:00.0 | End Time: | 2021-11-16 09:00:00.0 | Satellites: | Metop-A | Subject: | general-announcement | Detail: | Metop-A is planned to be de-orbited in November 2021. For more details, see the URL provided below. | Url: | https://www.eumetsat.int/plans-metop-end-life | Status: | scheduled | Issue Time: | 2021-04-01 13:02:07.0 | Services: | |
Name: | EUMETSAT | Address: | Eumetsat-Allee 1 D-64295 Darmstadt Germany
| Telephone: | +49 6151 807 3660/3770 | Fax: | +49 6151 807 3790 | E-mail: | ops@eumetsat.int | Internet: | www.eumetsat.int |
You are receiving this email because you are subscribed to our User Notification Service (UNS). You can modify your UNS subscriptions or unsubscribe at any time via our UNS web interface (login to our Earth Observation Portal required).
Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.
| |