Message number: | 7828 |
Message creation: | Tue Apr 20 08:25:50 UTC 2021 |
Type: | Planned Maintenance |
Ann Nr: | 5475 |
Rev: | 11 |
Start Time: | 2020-01-06 00:00:00.0 |
End Time: | 2021-06-29 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. [Rev. 3] End date updated to 19th April 2020.[Rev. 4] End date updated. [Rev. 5] End date updated. [Rev. 6] End date updated. [Rev 7] End date updated. [Rev 8] End date updated. [Rev 9] End date updated. [Rev. 10] End date updated. [Rev. 11] End date updated. |
Status: | scheduled |
Issue Time: | 2021-03-30 10:02:40.0 |
Services: |
ASCAT Soil Moisture - Metop-A ASCAT Level 1 - Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5596 |
Rev: | 1 |
Start Time: | 2020-01-29 00:00:00.0 |
End Time: | 2021-12-31 23:59:00.0 |
Satellites: | Metop-A |
Subsystem: | HRPT |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates. |
Status: | scheduled |
Issue Time: | 2020-02-03 10:12:03.0 |
Services: |
A-DCS AHRPT Metop-A ASCAT AHRPT Metop-A AMSU-A AHRPT Metop-A AVHRR AHRPT Metop-A IASI AHRPT Metop-A HIRS AHRPT Metop-A GRAS AHRPT Metop-A MHS AHRPT Metop-A GOME-2 AHRPT Metop-A SEM AHRPT Metop-A |
Type: | Service Enhancement |
Ann Nr: | 6259 |
Rev: | 1 |
Start Time: | 2020-09-15 00:00:00.0 |
End Time: | 2021-05-15 00:00:00.0 |
Satellites: | NOAA-15,NOAA-19 |
Subsystem: | AVHRR |
Subject: | general-announcement |
Detail: | NESDIS Office of Satellite and Product Operations (OSPO) engineers will activate switching for NOAA-15 and NOAA-19 AVHRR Channel 3A / 3B for the period of 15 September 2020 to 14 May 2021. Switching to Channel 3A will occur during this period over the predefined box encompassing the Alaska Region (box coordinates 50°N to 75°N and 173°E to 135°W). NOAA-15 and NOAA-19 AVHRR will switch between Channel 3B and Channel 3A to support snow and ice detection and monitoring activities over Alaska Region. For more details please refer to the URL link below. |
Url: | https://www.ospo.noaa.gov/data/messages/2020/MSG258010404.html |
Status: | scheduled |
Issue Time: | 2020-09-15 10:11:37.0 |
Services: |
AVHRR Level 1 - NOAA EARS-AVHRR |
Type: | Service Enhancement |
Ann Nr: | 6269 |
Rev: | 3 |
Subject: | service-change |
Detail: | Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data will be removed from EUMETCast Satellite on 29 July 2021. Alternative services to access these data are available. For full details, see the URL provided below. [Rev. 2]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 3]: The removal of Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite, initially planned for 29 July 2021, is being deferred to a later date (likely to be during the last quarter of 2021). This is to allow more time for users to transition to alternative access services. |
Url: | https://www.eumetsat.int/S3-olci-l1-nrt-on-eumetcast-satellite-removed |
Status: | scheduled |
Issue Time: | 2021-01-26 16:03:54.0 |
Services: |
OLCI Level 1 Products - S3A OLCI Level 1 Products - S3B |
Type: | Service Enhancement |
Ann Nr: | 6770 |
Rev: | 1 |
Start Time: | 2021-03-04 09:00:00.0 |
End Time: | 2021-03-04 09:00:00.0 |
Subject: | general-announcement |
Detail: | Tellicast client software release 2.14.7 is now available for Linux users. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/new-tellicast-linux-version-2147-released |
Status: | scheduled |
Issue Time: | 2021-03-04 13:26:02.0 |
Services: |
Type: | Planned Maintenance |
Ann Nr: | 6856 |
Rev: | 1 |
Start Time: | 2021-04-08 06:00:00.0 |
End Time: | 2021-05-04 12:00:00.0 |
Satellites: | GOES-17 |
Subject: | instrument-special-operation |
Impact: | risk-of-interruption |
Detail: | NOAA will conduct a GOES-West ABI Cooling Timeline Operation from 8 April – 4 May 2021, every day from 06:00 to 12:00 UTC. During this phase, GOES-17 operations mode will change from MODE 6 to MODE 3, and this will affect the GOES-West ABI data distribution on EUMETCast. For full details, see the URL provided below. Users wishing to receive the MODE 3 data should contact our User Helpdesk at ops@eumetsat.int. |
Url: | https://www.eumetsat.int/goes17-abi-mode3-cooling-timeline-implementation |
Status: | scheduled |
Issue Time: | 2021-03-31 15:10:50.0 |
Services: |
GOES Products |
Type: | Service Enhancement |
Ann Nr: | 6887 |
Rev: | 1 |
Start Time: | 2021-04-15 09:00:00.0 |
End Time: | 2021-04-15 09:00:00.0 |
Subject: | new-product |
Detail: | Regional EARS-MWRI data to be available on EUMETCast. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/ears-mwri-data-eumetcast-soon |
Status: | scheduled |
Issue Time: | 2021-04-01 13:30:17.0 |
Services: |
EARS-MWRI |
Type: | Planned Maintenance |
Ann Nr: | 6879 |
Rev: | 3 |
Start Time: | 2021-04-15 12:00:00.0 |
End Time: | 2021-04-21 17:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | Data Centre archive database maintenance. During this time, the Data Centre archive catalogue will not be updated and the processing of orders will be suspended. Over ten days following the maintenance, catalogue updates may be delayed due to necessary recovery activities. Users are invited to check the Data Store as it might already offer the data they wish to access. [Rev. 2] Maintenance on hold. The orders processing and the catalogue updates have temporarily resumed. The maintenance activity is expected to resume at the end of the week. [Rev. 3] Start and End date/time updated. |
Status: | scheduled |
Issue Time: | 2021-04-15 10:16:35.0 |
Services: |
EUMETSAT Data Centre |
Type: | Planned Maintenance |
Ann Nr: | 6897 |
Rev: | 1 |
Start Time: | 2021-04-19 08:30:00.0 |
End Time: | 2021-04-19 10:30:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Svalbard SG7 Antenna Maintenance.There may be disruption to the listed EUMETSAT regional services. |
Status: | scheduled |
Issue Time: | 2021-04-14 14:32:51.0 |
Services: |
EARS-ATMS EARS-CrlS EARS-VIIRS |
Type: | Planned Maintenance |
Ann Nr: | 6888 |
Rev: | 1 |
Start Time: | 2021-04-19 08:30:00.0 |
End Time: | 2021-04-22 02:00:00.0 |
Satellites: | Sentinel-3A |
Subsystem: | SLSTR |
Subject: | instrument-maintenance |
Impact: | data-unavailable |
Detail: | SLSTR will receive a software patch to raise the Stroke Saturation Value to 3.4 mm to be followed by a routine decontamination. Products will not be available from the Event Start Time until the beginning of the decontamination Cool-down phase which starts at approximately 2021/04/20 08:05. During the Cool-down phase and up until the Event End Time, VIS channels are subject to be degraded and IR Channels will be invalid. |
Status: | scheduled |
Issue Time: | 2021-04-13 08:54:52.0 |
Services: |
SLSTR Level 1 Products - S3A SLSTR Level 2 Marine Products - S3A SLSTR Level 2 Atmospheric Products - S3A |
Type: | Planned Maintenance |
Ann Nr: | 6891 |
Rev: | 1 |
Start Time: | 2021-04-20 08:04:00.0 |
End Time: | 2021-04-20 08:11:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-04-14 13:25:25.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 6890 |
Rev: | 1 |
Start Time: | 2021-04-20 08:51:00.0 |
End Time: | 2021-04-20 08:58:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-04-14 13:24:37.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 6889 |
Rev: | 1 |
Start Time: | 2021-04-20 09:18:00.0 |
End Time: | 2021-04-20 09:25:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-04-14 13:23:57.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 6896 |
Rev: | 1 |
Start Time: | 2021-04-20 10:00:00.0 |
End Time: | 2021-04-23 17:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Kangerlussuaq Core Station Maintenance. There may be disruption to the listed EUMETSAT regional services. The maintenance is daily between 10:00 and 17:00 UTC in the planned period. |
Status: | scheduled |
Issue Time: | 2021-04-14 14:45:39.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-MWRI EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-VIIRS EARS-NWC EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 6899 |
Rev: | 2 |
Start Time: | 2021-04-20 22:50:00.0 |
End Time: | 2021-04-20 23:20:00.0 |
Satellites: | GOES-16 |
Subject: | Maintenance Manoeuvre |
Impact: | data-unavailable |
Detail: | A spacecraft maintenance manoeuvre will be performed on GOES-16. ABI, SUVI, and EXIS products will experience a data outage, GLM may have excessive false events. [REV 2] The manoeuvre has been postponed and will be rescheduled. |
Status: | postponed |
Issue Time: | 2021-04-20 08:13:43.0 |
Services: |
GOES Products |
Type: | Service Enhancement |
Ann Nr: | 6870 |
Rev: | 1 |
Start Time: | 2021-04-21 09:00:00.0 |
End Time: | 2021-04-21 09:00:00.0 |
Subject: | new-product |
Detail: | Upgraded version of the LSA SAF MSG Land Surface Temperature product to be available on EUMETCast. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/upgraded-lsa-saf-msg-land-surface-temperature-product-eumetcast-soon |
Status: | scheduled |
Issue Time: | 2021-04-01 13:26:25.0 |
Services: |
LSA SAF - Products |
Type: | Service Enhancement |
Ann Nr: | 6871 |
Rev: | 1 |
Start Time: | 2021-04-21 09:00:00.0 |
End Time: | 2021-04-21 09:00:00.0 |
Subject: | new-product |
Detail: | Two new operational products from the LSA SAF to be available on EUMETCast: MSG-based All Sky Land Surface Temperature and MSG-based Net Surface Longwave. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/two-new-lsa-saf-operational-products-eumetcast-soon |
Status: | scheduled |
Issue Time: | 2021-04-01 13:29:05.0 |
Services: |
LSA SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6839 |
Rev: | 2 |
Start Time: | 2021-04-21 11:41:00.0 |
End Time: | 2021-04-21 11:56:00.0 |
Satellites: | Metop-B |
Subject: | out-of-plane-manoeuvre |
Impact: | data-degraded |
Detail: | Routine out-of-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre. [Rev. 2] Start and End Time updated. Burn time = 11:56:49 UTC. Burn duration = 826.052 seconds. Please note the following outages of the Instruments on-board the spacecraft due to the manoeuvre, all times are UTC: AMSU-A1 from 07:09:00 to 12:59:20, IASI from 07:10:55 to 13:03:20, AMSU-A2 from 07:09:40 to 13:00:50, SEM from 07:10:20 to 12:58:20, HIRS from 07:10:40 to 12:48:20, MHS from 07:10:50 to 12:53:20 and GOME from 10:21:18 to 13:44:41. |
Status: | scheduled |
Issue Time: | 2021-04-15 10:12:30.0 |
Services: |
SEM L0 - Metop-B AVHRR Level 1 - Metop-B AMSU-A Level 1 - Metop-B HIRS Level 1 - Metop-B MHS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GRAS Level 1 - Metop-B GOME-2 Level 1 - Metop-B ATOVS Sounding products - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B A-DCS AHRPT Metop-B AMSU-A AHRPT Metop-B ASCAT AHRPT Metop-B AVHRR AHRPT Metop-B GOME-2 AHRPT Metop-B GRAS AHRPT Metop-B HIRS AHRPT Metop-B MHS AHRPT Metop-B IASI AHRPT Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 6894 |
Rev: | 1 |
Start Time: | 2021-04-23 09:00:00.0 |
End Time: | 2021-04-23 09:00:00.0 |
Satellites: | NOAA-20 |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-04-14 13:39:48.0 |
Services: |
ATMS Level 1 - JPSS VIIRS EDR - JPSS CrIS Level 1 - JPSS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 6895 |
Rev: | 1 |
Start Time: | 2021-04-23 09:00:00.0 |
End Time: | 2021-04-23 09:00:00.0 |
Satellites: | Suomi NPP |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-04-14 13:40:15.0 |
Services: |
ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 6892 |
Rev: | 1 |
Start Time: | 2021-04-23 21:17:00.0 |
End Time: | 2021-04-24 04:11:00.0 |
Satellites: | Metop-B |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | External Calibration. Lunar acquisition. CS2 campaign. |
Status: | scheduled |
Issue Time: | 2021-04-14 13:32:23.0 |
Services: |
IASI Level 1 - Metop-B IASI Sounding Products - Metop-B EARS-IASI IASI AHRPT Metop-B OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6893 |
Rev: | 1 |
Start Time: | 2021-04-23 22:12:00.0 |
End Time: | 2021-04-24 05:06:00.0 |
Satellites: | Metop-C |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | External Calibration. Lunar acquisition. CS2 campaign. |
Status: | scheduled |
Issue Time: | 2021-04-14 13:38:34.0 |
Services: |
IASI Sounding products- Metop-C IASI Level 1 - Metop-C EARS-IASI IASI AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6898 |
Rev: | 1 |
Start Time: | 2021-04-26 07:30:00.0 |
End Time: | 2021-04-26 15:15:00.0 |
Satellites: | Metop-A,Metop-B,Metop-C,NOAA-19 |
Subject: | ground-segment-maintenance |
Impact: | data-unavailable |
Detail: | Due to an Operating System upgrade on the EPS Product Generation Facility, there will be an outage of all Metop/NOAA global products during the required system downtime. There will be no changes to Products as a result of this change. An unavailability of up to two orbits of data per spacecraft is expected |
Status: | scheduled |
Issue Time: | 2021-04-14 14:36:35.0 |
Services: |
SEM L0 - Metop-A AVHRR Level 1 - Metop-A AMSU-A Level 1 - Metop-A MHS Level 1 - Metop-A HIRS Level 1 - Metop-A IASI Level 1 - Metop-A ASCAT Level 1 - Metop-A GRAS Level 1 - Metop-A GOME-2 Level 1 - Metop-A ATOVS Sounding products - Metop-A IASI Sounding Products - Metop-A ASCAT Soil Moisture - Metop-A AVHRR Polar Winds - Metop-A Multi-Sensor Products - Metop-A SEM L0 - Metop-B AVHRR Level 1 - Metop-B AMSU-A Level 1 - Metop-B MHS Level 1 - Metop-B HIRS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GRAS Level 1 - Metop-B GOME-2 Level 1 - Metop-B ATOVS Sounding products - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B SEM L0 - Metop-C AVHRR Level 1 - Metop-C AMSU-A Level 1 - Metop-C IASI Sounding products- Metop-C ASCAT Soil Moisture - Metop-C AVHRR Polar winds - Metop-C MHS Level 1 - Metop-C Multi-sensor Products - Metop-C ASCAT Level 1 - Metop-C GRAS Level 1 - Metop-C IASI Level 1 - Metop-C GOME-2 Level 1 - Metop-C Multi-Metop Wind Products AVHRR Level 1 - NOAA MHS Level 1 - NOAA AMSU-A Level 1 - NOAA HIRS Level 1 - NOAA ATOVS Sounding products - NOAA |
Type: | Service Enhancement |
Ann Nr: | 6878 |
Rev: | 1 |
Start Time: | 2021-04-28 09:00:00.0 |
Satellites: | Himawari-8 |
Subject: | product-change |
Detail: | The Japan Meteorological Agency (JMA) has provided a change to configuration of the HSD-to-HRIT format converter software that will improve the radiometric resolution of Himawari-8 AHI channel 3.9 XRIT data. EUMETSAT will implement this change to improve the detection capability of fire events on the AHI HRIT data provided through EUMETCast Europe and EUMETCast Terrestrial. The change will take place on 28 April 2021. In preparation, a set of channel 3.9 test data can be accessed from the following site: https://sftp.eumetsat.int/public/folder/UsCVknVOOkSyCdgpMimJNQ/User-Materials/Test-Data/Himawari-8_14bit/. For more information, contact our User Service Helpdesk and follow the URL below. |
Url: | https://www.eumetsat.int/update-himawari-8-ahi-channel-39 |
Status: | scheduled |
Issue Time: | 2021-04-08 12:37:07.0 |
Services: |
Type: | Service Enhancement |
Ann Nr: | 6807 |
Rev: | 1 |
Start Time: | 2021-05-03 09:00:00.0 |
End Time: | 2021-05-07 14:00:00.0 |
Subject: | general-announcement |
Detail: | Test activation of the backup satellite, HOTBIRD 13C, for the EUMETCast Europe service. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/eumetcast-europe-backup-satellite-activation |
Status: | scheduled |
Issue Time: | 2021-03-17 14:07:41.0 |
Services: |
EUMETCast-Europe |
Type: | Service Enhancement |
Ann Nr: | 6676 |
Rev: | 2 |
Start Time: | 2021-05-18 09:00:00.0 |
End Time: | 2021-05-18 09:00:00.0 |
Subject: | product-change |
Detail: | GOME-2 Level 1 Product Processing Facility (PPF) Version 7 is planned to be released early April 2021. Exact date will be communicated in due course. For full details and test data, see the URL provided below. [Rev. 2]: The release is postponed to the second half of May 2021, with exact date to be communicated in due course. |
Url: | https://www.eumetsat.int/upcoming-release-gome-2-level-1-ppf-v7 |
Status: | scheduled |
Issue Time: | 2021-03-11 08:16:29.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 Level 1 - Metop-B GOME-2 Level 1 - Metop-C |
Type: | Service Enhancement |
Ann Nr: | 6836 |
Rev: | 1 |
Start Time: | 2021-06-30 09:00:00.0 |
End Time: | 2021-06-30 09:00:00.0 |
Subject: | general-announcement |
Detail: | Discontinuation of the Meteosat SEVIRI Total Ozone product. For more details, see the URL provided below. |
Url: | https://www.eumetsat.int/meteosat-seviri-total-ozone-product-discontinued |
Status: | scheduled |
Issue Time: | 2021-03-24 15:20:09.0 |
Services: |
0° Meteosat Meteorological Products IODC Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 6863 |
Rev: | 1 |
Start Time: | 2021-11-16 09:00:00.0 |
End Time: | 2021-11-16 09:00:00.0 |
Satellites: | Metop-A |
Subject: | general-announcement |
Detail: | Metop-A is planned to be de-orbited in November 2021. For more details, see the URL provided below. |
Url: | https://www.eumetsat.int/plans-metop-end-life |
Status: | scheduled |
Issue Time: | 2021-04-01 13:02:07.0 |
Services: |
Name: | EUMETSAT |
Address: |
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |