Topic: Eumetsat Weekly Operations Schedule - Week 12

 Date/Time Issued: March  24, 2021 0950Z
 
 Product(s) or Data Impacted: See list below.
 
 Date/Time of Initial Impact: March 24, 2021 0937Z  (from the Eumetsat Weekly Operations Schedule message)
 
 Date/Time of Expected End:  See table in detail for on and off switch  time  
 
 Length of Outage:  N/A
 
 Details/Specifics of Change:    


Message number: 7755
Message creation: Wed Mar 24 09:37:59 UTC 2021


Type: Planned Maintenance
Ann Nr: 5475
Rev: 10
Start Time: 2020-01-06 00:00:00.0
End Time: 2021-04-01 00:00:00.0
Satellites: Metop-A
Subsystem: ASCAT
Subject: general-announcement
Impact: risk-of-interruption
Detail: Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. [Rev. 3] End date updated to 19th April 2020.[Rev. 4] End date updated. [Rev. 5] End date updated. [Rev. 6] End date updated. [Rev 7] End date updated. [Rev 8] End date updated. [Rev 9] End date updated. [Rev. 10] End date updated.
Status: scheduled
Issue Time: 2020-11-27 12:17:02.0
Services: ASCAT Soil Moisture - Metop-A
ASCAT Level 1 - Metop-A

Type: Planned Maintenance
Ann Nr: 5596
Rev: 1
Start Time: 2020-01-29 00:00:00.0
End Time: 2021-12-31 23:59:00.0
Satellites: Metop-A
Subsystem: HRPT
Subject: general-announcement
Impact: data-unavailable
Detail: HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates.
Status: scheduled
Issue Time: 2020-02-03 10:12:03.0
Services: A-DCS AHRPT Metop-A
ASCAT AHRPT Metop-A
AMSU-A AHRPT Metop-A
AVHRR AHRPT Metop-A
IASI AHRPT Metop-A
HIRS AHRPT Metop-A
GRAS AHRPT Metop-A
MHS AHRPT Metop-A
GOME-2 AHRPT Metop-A
SEM AHRPT Metop-A

Type: Service Enhancement
Ann Nr: 6259
Rev: 1
Start Time: 2020-09-15 00:00:00.0
End Time: 2021-05-15 00:00:00.0
Satellites: NOAA-15,NOAA-19
Subsystem: AVHRR
Subject: general-announcement
Detail: NESDIS Office of Satellite and Product Operations (OSPO) engineers will activate switching for NOAA-15 and NOAA-19 AVHRR Channel 3A / 3B for the period of 15 September 2020 to 14 May 2021. Switching to Channel 3A will occur during this period over the predefined box encompassing the Alaska Region (box coordinates 50°N to 75°N and 173°E to 135°W). NOAA-15 and NOAA-19 AVHRR will switch between Channel 3B and Channel 3A to support snow and ice detection and monitoring activities over Alaska Region. For more details please refer to the URL link below.
Url: https://www.ospo.noaa.gov/data/messages/2020/MSG258010404.html
Status: scheduled
Issue Time: 2020-09-15 10:11:37.0
Services: AVHRR Level 1 - NOAA
EARS-AVHRR

Type: Service Enhancement
Ann Nr: 6269
Rev: 3
Subject: service-change
Detail: Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data will be removed from EUMETCast Satellite on 29 July 2021. Alternative services to access these data are available. For full details, see the URL provided below. [Rev. 2]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 3]: The removal of Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite, initially planned for 29 July 2021, is being deferred to a later date (likely to be during the last quarter of 2021). This is to allow more time for users to transition to alternative access services.
Url: https://www.eumetsat.int/S3-olci-l1-nrt-on-eumetcast-satellite-removed
Status: scheduled
Issue Time: 2021-01-26 16:03:54.0
Services: OLCI Level 1 Products - S3A
OLCI Level 1 Products - S3B

Type: Planned Maintenance
Ann Nr: 6661
Rev: 1
Start Time: 2021-02-04 20:30:00.0
End Time: 2021-03-29 23:00:00.0
Satellites: MET-8
Subject: eclipse-season
Impact: risk-of-degradation
Detail: There is a risk of degraded image quality every night from 20:30 to 23:00 in the given time period.
Status: scheduled
Issue Time: 2021-01-27 15:19:27.0
Services: IODC SEVIRI Level 1.5 Image Data
IODC Meteosat Meteorological Products

Type: Planned Maintenance
Ann Nr: 6705
Rev: 1
Start Time: 2021-02-25 23:00:00.0
End Time: 2021-04-13 01:30:00.0
Satellites: MET-11
Subject: eclipse-season
Impact: risk-of-degradation
Detail: 23:00 to 01:30 UTC image data may be unavailable or incomplete.
Status: scheduled
Issue Time: 2021-02-10 15:31:09.0
Services: 0° SEVIRI Level 1.5 Image Data
0° Meteosat Meteorological Products

Type: Service Enhancement
Ann Nr: 6770
Rev: 1
Start Time: 2021-03-04 09:00:00.0
End Time: 2021-03-04 09:00:00.0
Subject: general-announcement
Detail: Tellicast client software release 2.14.7 is now available for Linux users. For full details, see the URL provided below.
Url: https://www.eumetsat.int/new-tellicast-linux-version-2147-released
Status: scheduled
Issue Time: 2021-03-04 13:26:02.0
Services:

Type: Planned Maintenance
Ann Nr: 6714
Rev: 1
Start Time: 2021-03-04 22:30:00.0
End Time: 2021-04-13 01:00:00.0
Satellites: MET-10
Subject: eclipse-season
Impact: risk-of-degradation
Detail: 22:30 to 01:00 UTC image data may be unavailable or incomplete.
Status: scheduled
Issue Time: 2021-02-17 14:47:24.0
Services: RSS SEVIRI Level 1.5 Image Data
RSS Meteosat Meteorological Products

Type: Planned Maintenance
Ann Nr: 6784
Rev: 2
Start Time: 2021-03-16 16:30:00.0
End Time: 2021-03-23 15:00:00.0
Satellites: GOES-16
Subject: instrument-maintenance
Impact: data-unavailable
Detail: NOAA will perform testing of GOES-16 GLM products. Multiple 60 min outages and one 24 hour degraded product period can be expected. The outages and degradation periods are listed below. Outages: March 16 16:30-17:30 UTC, March 17 04:36-05:36 UTC, March 17 16:30-17:30 UTC, March 18 04:36-05:36 UTC, March 18 16:30-17:30 UTC, March 19 04:36-05:36 UTC, GLM degraded radiometric data: March 22 15:00 UTC to March 23 15:00 UTC. [Rev. 2] The GLM test has been postponed by NOAA due to Critical Weather Day. New dates and times will be provided in due course.
Status: postponed
Issue Time: 2021-03-17 16:45:23.0
Services: GOES Products

Type: Planned Maintenance
Ann Nr: 6792
Rev: 1
Start Time: 2021-03-20 02:00:00.0
End Time: 2021-03-20 08:00:00.0
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: EARS Athens Station data line maintenance. There may be disruption to all imager based services.
Status: scheduled
Issue Time: 2021-03-10 15:08:14.0
Services: EARS-ATOVS
EARS-AVHRR
EARS-ASCAT
EARS-IASI
EARS-ATMS
EARS-CrlS
EARS-VIIRS
EARS-NWC
EARS-VASS
EARS-MERSI

Type: Planned Maintenance
Ann Nr: 6813
Rev: 1
Start Time: 2021-03-22 10:00:00.0
End Time: 2021-03-24 17:00:00.0
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: EARS Kangerlussuaq Core Station Maintenance. There may be disruption to all imager based services on the following days: 22 March and 24 March 2021, both days between 10:00 and 17:00 UTC.
Status: scheduled
Issue Time: 2021-03-17 16:52:05.0
Services: EARS-ATOVS
EARS-IASI
EARS-AVHRR
EARS-ATMS
EARS-CrlS
EARS-VIIRS
EARS-ASCAT
EARS-NWC
EARS-VASS
EARS-MERSI

Type: Planned Maintenance
Ann Nr: 6814
Rev: 1
Start Time: 2021-03-22 17:10:00.0
End Time: 2021-03-22 18:10:00.0
Satellites: Metop-B
Subject: ground-segment-maintenance
Impact: data-delayed
Detail: McMurdo Critical Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period.
Status: scheduled
Issue Time: 2021-03-17 16:01:17.0
Services: AVHRR Level 1 - Metop-B
SEM L0 - Metop-B
MHS Level 1 - Metop-B
AMSU-A Level 1 - Metop-B
ASCAT Level 1 - Metop-B
HIRS Level 1 - Metop-B
IASI Level 1 - Metop-B
GRAS Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
IASI Sounding Products - Metop-B
ATOVS Sounding products - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
Multi-Metop Wind Products

Type: Planned Maintenance
Ann Nr: 6819
Rev: 1
Start Time: 2021-03-23 00:00:00.0
End Time: 2021-03-25 00:00:00.0
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: KSAT Svalbard link upgrade. Data interruptions might be observed during the maintenance period.
Status: scheduled
Issue Time: 2021-03-17 16:28:57.0
Services: SEM L0 - Metop-A
AVHRR Level 1 - Metop-A
AMSU-A Level 1 - Metop-A
ASCAT Level 1 - Metop-A
MHS Level 1 - Metop-A
HIRS Level 1 - Metop-A
IASI Level 1 - Metop-A
GRAS Level 1 - Metop-A
GOME-2 Level 1 - Metop-A
ATOVS Sounding products - Metop-A
IASI Sounding Products - Metop-A
AVHRR Polar Winds - Metop-A
ASCAT Soil Moisture - Metop-A
Multi-Sensor Products - Metop-A
SEM L0 - Metop-B
AMSU-A Level 1 - Metop-B
AVHRR Level 1 - Metop-B
MHS Level 1 - Metop-B
ASCAT Level 1 - Metop-B
HIRS Level 1 - Metop-B
IASI Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
GRAS Level 1 - Metop-B
ATOVS Sounding products - Metop-B
IASI Sounding Products - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
SEM L0 - Metop-C
AVHRR Level 1 - Metop-C
AMSU-A Level 1 - Metop-C
IASI Sounding products- Metop-C
ASCAT Soil Moisture - Metop-C
AVHRR Polar winds - Metop-C
MHS Level 1 - Metop-C
Multi-sensor Products - Metop-C
ASCAT Level 1 - Metop-C
IASI Level 1 - Metop-C
GOME-2 Level 1 - Metop-C
GRAS Level 1 - Metop-C
Multi-Metop Wind Products

Type: Planned Maintenance
Ann Nr: 6791
Rev: 2
Start Time: 2021-03-23 07:00:00.0
End Time: 2021-03-23 17:00:00.0
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: EARS Lannion Core Station 1st Antenna Chain MEOS server Upgrade. There may be disruption to all imager based services. The following satellites data will be affected: Metop, FY3D, NOAA-20 and Suomi-NPP. [Rev. 2] Date updated
Status: scheduled
Issue Time: 2021-03-12 14:26:17.0
Services: EARS-ATOVS
EARS-AVHRR
EARS-ASCAT
EARS-IASI
EARS-ATMS
EARS-CrlS
EARS-VIIRS
EARS-NWC
EARS-VASS
EARS-MERSI

Type: Planned Maintenance
Ann Nr: 6809
Rev: 1
Start Time: 2021-03-23 08:31:00.0
End Time: 2021-03-23 08:38:00.0
Satellites: Metop-B
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2021-03-17 15:21:10.0
Services: SEM L0 - Metop-B
SEM AHRPT Metop-B

Type: Planned Maintenance
Ann Nr: 6808
Rev: 1
Start Time: 2021-03-23 08:52:00.0
End Time: 2021-03-23 08:59:00.0
Satellites: Metop-A
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2021-03-17 15:20:17.0
Services: SEM AHRPT Metop-A
SEM L0 - Metop-A

Type: Service Enhancement
Ann Nr: 6794
Rev: 1
Start Time: 2021-03-23 09:00:00.0
End Time: 2021-03-23 09:00:00.0
Subject: new-product
Detail: Roshydromet Meteor-M N2 IKFS-2 Level 1 data will be available on EUMETCast. For full details, see the URL provided below.
Url: https://www.eumetsat.int/meteor-m-n2-data-on-eumetcast
Status: scheduled
Issue Time: 2021-03-11 08:26:35.0
Services: Meteor-M N2 Products

Type: Planned Maintenance
Ann Nr: 6810
Rev: 1
Start Time: 2021-03-23 09:25:00.0
End Time: 2021-03-23 09:32:00.0
Satellites: Metop-C
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2021-03-17 15:22:05.0
Services: SEM AHRPT Metop-C
SEM L0 - Metop-C

Type: Planned Maintenance
Ann Nr: 6822
Rev: 1
Start Time: 2021-03-23 14:00:00.0
End Time: 2021-03-23 20:00:00.0
Satellites: GOES-16,GOES-17
Subject: ground-segment-maintenance
Impact: data-unavailable
Detail: Due to ground system database updates at NOAA side, all GOES-16 and GOES-17 products will not be available in the given time frame.
Status: scheduled
Issue Time: 2021-03-18 13:12:42.0
Services: GOES Products

Type: Planned Maintenance
Ann Nr: 6815
Rev: 1
Start Time: 2021-03-23 23:30:00.0
End Time: 2021-03-26 23:45:00.0
Satellites: Metop-B
Subject: ground-segment-maintenance
Impact: data-delayed
Detail: McMurdo MG1 Critical Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during the maintenance periods: On 23 March 2030-2130z and 2215-2315z, on 24 March 2021 0130-0230z and 2130-2230z, on 25 March 0100-0200z, 0230-0330z and 1930-2330z, and on 26 March 1930-2030z, 2115-2215z and 2245-2345z.
Status: scheduled
Issue Time: 2021-03-17 16:15:36.0
Services: SEM L0 - Metop-B
AMSU-A Level 1 - Metop-B
AVHRR Level 1 - Metop-B
HIRS Level 1 - Metop-B
MHS Level 1 - Metop-B
ASCAT Level 1 - Metop-B
IASI Level 1 - Metop-B
GRAS Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
ATOVS Sounding products - Metop-B
ASCAT Soil Moisture - Metop-B
IASI Sounding Products - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
Multi-Metop Wind Products

Type: Planned Maintenance
Ann Nr: 6820
Rev: 2
Start Time: 2021-03-24 00:00:00.0
End Time: 2021-03-26 00:00:00.0
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: Fucino Ground Station data link upgrade. Interruptions might be observed during the maintenance period. [Rev. 2] Activity cancelled.
Status: scheduled
Issue Time: 2021-03-24 09:34:47.0
Services: RSS SEVIRI Level 1.5 Image Data
RSS Meteosat Meteorological Products

Type: Planned Maintenance
Ann Nr: 6816
Rev: 1
Start Time: 2021-03-24 09:00:00.0
End Time: 2021-03-24 09:00:00.0
Satellites: NOAA-20
Subject: VIIRS Lunar Roll
Impact: data-unavailable
Detail: Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre.
Status: scheduled
Issue Time: 2021-03-17 16:07:44.0
Services: ATMS Level 1 - JPSS
CrIS Level 1 - JPSS
VIIRS EDR - JPSS
SNPP - JPSS Copernicus data

Type: Planned Maintenance
Ann Nr: 6817
Rev: 1
Start Time: 2021-03-24 09:00:00.0
End Time: 2021-03-24 09:00:00.0
Satellites: Suomi NPP
Subject: VIIRS Lunar Roll
Impact: data-unavailable
Detail: Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre.
Status: scheduled
Issue Time: 2021-03-17 16:08:07.0
Services: ATMS Level 1 - JPSS
CrIS Level 1 - JPSS
VIIRS EDR - JPSS
EARS-VIIRS
SNPP - JPSS Copernicus data

Type: Planned Maintenance
Ann Nr: 6821
Rev: 1
Start Time: 2021-03-24 10:00:00.0
End Time: 2021-03-24 12:00:00.0
Subject: ground-segment-maintenance
Impact: data-delayed
Detail: Maintenance activity affecting all Third-Party data (except NOAA data) for which possible delays can be expected during the indicated time period. In addition, the filenames of GPM-Core GMI L1 BUFR data will be updated to include seconds, to comply with the WMO format, e.g.: Old filename: W_XX-EUMETSAT-Darmstadt,SOUNDING+SATELLITE,GPM+GMI+S1_C_EUMP_202103120950_095019_095517_L1C.bin. New filename: W_XX-EUMETSAT-Darmstadt,SOUNDING+SATELLITE,GPM+GMI+S1_C_EUMP_20210312095000_095019_095517_L1C.bin.
Status: scheduled
Issue Time: 2021-03-18 08:19:59.0
Services: GOES Products
Himawari Products
FY-2 Products
FY-4 Products
ELECTRO-L N2
INSAT-3D Products
MODIS Products
SSMIS Products
Oceansat-2 Products
SARAL Products
Megha-Tropiques Products
FY-3 Products
Meteor-M N2 Products
Multimission Regional Products
SMOS Products
GCOM-W1 AMSR-2 Products
GPM-Core GMI Products
SMAP Products
VIIRS Fire Product
Aeolus Level 2 Products

Type: Planned Maintenance
Ann Nr: 6751
Rev: 3
Start Time: 2021-03-24 12:48:00.0
End Time: 2021-03-24 12:49:00.0
Satellites: Metop-C
Subject: in-plane-manoeuvre
Impact: data-degraded
Detail: Routine in-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre. [Rev. 2]: Manoeuvre Execution time updated. Burn time: 12:48:59 UTC. Duration: 1.352 seconds. [Rev. 3] Details updated to reflect the outages per instrument: SEM from 7:43 to 13:31 UTC and GOME from 12:39 to 14:21 UTC.
Status: scheduled
Issue Time: 2021-03-24 09:21:24.0
Services: SEM L0 - Metop-C
AVHRR Level 1 - Metop-C
AMSU-A Level 1 - Metop-C
MHS Level 1 - Metop-C
ASCAT Level 1 - Metop-C
IASI Level 1 - Metop-C
GRAS Level 1 - Metop-C
GOME-2 Level 1 - Metop-C
A-DCS AHRPT Metop-C
AMSU-A AHRPT Metop-C
ASCAT AHRPT Metop-C
AVHRR AHRPT Metop-C
GOME-2 AHRPT Metop-C
HIRS AHRPT Metop-C
GRAS AHRPT Metop-C
IASI AHRPT Metop-C
SEM AHRPT Metop-C
MHS AHRPT Metop-C

Type: Planned Maintenance
Ann Nr: 6805
Rev: 1
Start Time: 2021-03-26 03:10:00.0
End Time: 2021-03-26 03:20:00.0
Satellites: GOES-17
Subject: instrument-calibration
Detail: A GOES-17 ABI solar calibration scan is planned on 26 March 2021 between 0315 UTC and 0320 UTC. GOES-17 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G17_s20210850315[SSS]_e20210850320[SSS]_c202108503[mmssSSS]-129601_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 03:20 UTC.
Status: scheduled
Issue Time: 2021-03-16 09:02:10.0
Services: GOES Products

Type: Planned Maintenance
Ann Nr: 6806
Rev: 1
Start Time: 2021-03-26 20:00:00.0
End Time: 2021-03-26 20:10:00.0
Satellites: GOES-17
Subject: instrument-calibration
Detail: A GOES-17 ABI routine desert monitoring calibration scan is planned on 26 March 2021 between 20:00 UTC and 20:10 UTC. GOES-17 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G17_s20210852005[SSS]_e20210852010[SSS]_c202108520[mmssSSS]-129601_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 20:10 UTC
Status: scheduled
Issue Time: 2021-03-16 09:02:33.0
Services: GOES Products

Type: Planned Maintenance
Ann Nr: 6811
Rev: 1
Start Time: 2021-03-27 04:27:00.0
End Time: 2021-03-27 11:21:00.0
Satellites: Metop-B
Subsystem: IASI
Subject: instrument-calibration
Impact: data-unavailable
Detail: External Calibration. Lunar acquisition. CS2 campaign.
Status: scheduled
Issue Time: 2021-03-17 15:26:16.0
Services: IASI Sounding Products - Metop-B
IASI Level 1 - Metop-B
EARS-IASI
IASI AHRPT Metop-B
OSI SAF - Products

Type: Planned Maintenance
Ann Nr: 6812
Rev: 1
Start Time: 2021-03-27 05:21:00.0
End Time: 2021-03-27 12:15:00.0
Satellites: Metop-C
Subsystem: IASI
Subject: instrument-calibration
Impact: data-unavailable
Detail: External Calibration. Lunar acquisition. CS2 campaign.
Status: scheduled
Issue Time: 2021-03-17 15:26:23.0
Services: IASI Level 1 - Metop-C
IASI Sounding products- Metop-C
EARS-IASI
IASI AHRPT Metop-C
OSI SAF - Products

Type: Planned Maintenance
Ann Nr: 6824
Rev: 1
Start Time: 2021-03-30 09:04:00.0
End Time: 2021-03-30 09:06:00.0
Satellites: Sentinel-3A
Subsystem: OLCI
Subject: instrument-calibration
Impact: data-unavailable
Detail:
Status: scheduled
Issue Time: 2021-03-22 12:32:45.0
Services: OLCI Level 1 Products - S3A
OLCI Level 2 Marine Products - S3A

Type: Service Enhancement
Ann Nr: 6818
Rev: 1
Start Time: 2021-04-08 09:00:00.0
End Time: 2021-04-08 09:00:00.0
Subject: product-change
Detail: Update to Copernicus Sentinel-3 SRAL Level-2P Wave product, with the inclusion of a new wind variable. For full details, see the URL provided below.
Url: https://www.eumetsat.int/update-sentinel-3-sral-level-2-wave-product
Status: scheduled
Issue Time: 2021-03-17 18:15:41.0
Services: SRAL L2P Marine Products - S3A
SRAL L2P Marine Products - S3B

Type: Service Enhancement
Ann Nr: 6807
Rev: 1
Start Time: 2021-05-03 09:00:00.0
End Time: 2021-05-07 14:00:00.0
Subject: general-announcement
Detail: Test activation of the backup satellite, HOTBIRD 13C, for the EUMETCast Europe service. For full details, see the URL provided below.
Url: https://www.eumetsat.int/eumetcast-europe-backup-satellite-activation
Status: scheduled
Issue Time: 2021-03-17 14:07:41.0
Services: EUMETCast-Europe

Type: Service Enhancement
Ann Nr: 6676
Rev: 2
Start Time: 2021-05-18 09:00:00.0
End Time: 2021-05-18 09:00:00.0
Subject: product-change
Detail: GOME-2 Level 1 Product Processing Facility (PPF) Version 7 is planned to be released early April 2021. Exact date will be communicated in due course. For full details and test data, see the URL provided below. [Rev. 2]: The release is postponed to the second half of May 2021, with exact date to be communicated in due course.
Url: https://www.eumetsat.int/upcoming-release-gome-2-level-1-ppf-v7
Status: scheduled
Issue Time: 2021-03-11 08:16:29.0
Services: GOME-2 Level 1 - Metop-A
GOME-2 Level 1 - Metop-B
GOME-2 Level 1 - Metop-C

Name: EUMETSAT
Address: Eumetsat-Allee 1
D-64295 Darmstadt
Germany
Telephone: +49 6151 807 3660/3770
Fax: +49 6151 807 3790
E-mail: ops@eumetsat.int
Internet: www.eumetsat.int

You are receiving this email because you are subscribed to our User Notification Service (UNS). You can modify your UNS subscriptions or unsubscribe at any time via our UNS web interface (login to our Earth Observation Portal required).

Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.