Message number: | 7755 |
Message creation: | Wed Mar 24 09:37:59 UTC 2021 |
Type: | Planned Maintenance |
Ann Nr: | 5475 |
Rev: | 10 |
Start Time: | 2020-01-06 00:00:00.0 |
End Time: | 2021-04-01 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. [Rev. 3] End date updated to 19th April 2020.[Rev. 4] End date updated. [Rev. 5] End date updated. [Rev. 6] End date updated. [Rev 7] End date updated. [Rev 8] End date updated. [Rev 9] End date updated. [Rev. 10] End date updated. |
Status: | scheduled |
Issue Time: | 2020-11-27 12:17:02.0 |
Services: |
ASCAT Soil Moisture - Metop-A ASCAT Level 1 - Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5596 |
Rev: | 1 |
Start Time: | 2020-01-29 00:00:00.0 |
End Time: | 2021-12-31 23:59:00.0 |
Satellites: | Metop-A |
Subsystem: | HRPT |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates. |
Status: | scheduled |
Issue Time: | 2020-02-03 10:12:03.0 |
Services: |
A-DCS AHRPT Metop-A ASCAT AHRPT Metop-A AMSU-A AHRPT Metop-A AVHRR AHRPT Metop-A IASI AHRPT Metop-A HIRS AHRPT Metop-A GRAS AHRPT Metop-A MHS AHRPT Metop-A GOME-2 AHRPT Metop-A SEM AHRPT Metop-A |
Type: | Service Enhancement |
Ann Nr: | 6259 |
Rev: | 1 |
Start Time: | 2020-09-15 00:00:00.0 |
End Time: | 2021-05-15 00:00:00.0 |
Satellites: | NOAA-15,NOAA-19 |
Subsystem: | AVHRR |
Subject: | general-announcement |
Detail: | NESDIS Office of Satellite and Product Operations (OSPO) engineers will activate switching for NOAA-15 and NOAA-19 AVHRR Channel 3A / 3B for the period of 15 September 2020 to 14 May 2021. Switching to Channel 3A will occur during this period over the predefined box encompassing the Alaska Region (box coordinates 50°N to 75°N and 173°E to 135°W). NOAA-15 and NOAA-19 AVHRR will switch between Channel 3B and Channel 3A to support snow and ice detection and monitoring activities over Alaska Region. For more details please refer to the URL link below. |
Url: | https://www.ospo.noaa.gov/data/messages/2020/MSG258010404.html |
Status: | scheduled |
Issue Time: | 2020-09-15 10:11:37.0 |
Services: |
AVHRR Level 1 - NOAA EARS-AVHRR |
Type: | Service Enhancement |
Ann Nr: | 6269 |
Rev: | 3 |
Subject: | service-change |
Detail: | Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data will be removed from EUMETCast Satellite on 29 July 2021. Alternative services to access these data are available. For full details, see the URL provided below. [Rev. 2]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 3]: The removal of Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite, initially planned for 29 July 2021, is being deferred to a later date (likely to be during the last quarter of 2021). This is to allow more time for users to transition to alternative access services. |
Url: | https://www.eumetsat.int/S3-olci-l1-nrt-on-eumetcast-satellite-removed |
Status: | scheduled |
Issue Time: | 2021-01-26 16:03:54.0 |
Services: |
OLCI Level 1 Products - S3A OLCI Level 1 Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 6661 |
Rev: | 1 |
Start Time: | 2021-02-04 20:30:00.0 |
End Time: | 2021-03-29 23:00:00.0 |
Satellites: | MET-8 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | There is a risk of degraded image quality every night from 20:30 to 23:00 in the given time period. |
Status: | scheduled |
Issue Time: | 2021-01-27 15:19:27.0 |
Services: |
IODC SEVIRI Level 1.5 Image Data IODC Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 6705 |
Rev: | 1 |
Start Time: | 2021-02-25 23:00:00.0 |
End Time: | 2021-04-13 01:30:00.0 |
Satellites: | MET-11 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | 23:00 to 01:30 UTC image data may be unavailable or incomplete. |
Status: | scheduled |
Issue Time: | 2021-02-10 15:31:09.0 |
Services: |
0° SEVIRI Level 1.5 Image Data 0° Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 6770 |
Rev: | 1 |
Start Time: | 2021-03-04 09:00:00.0 |
End Time: | 2021-03-04 09:00:00.0 |
Subject: | general-announcement |
Detail: | Tellicast client software release 2.14.7 is now available for Linux users. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/new-tellicast-linux-version-2147-released |
Status: | scheduled |
Issue Time: | 2021-03-04 13:26:02.0 |
Services: |
Type: | Planned Maintenance |
Ann Nr: | 6714 |
Rev: | 1 |
Start Time: | 2021-03-04 22:30:00.0 |
End Time: | 2021-04-13 01:00:00.0 |
Satellites: | MET-10 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | 22:30 to 01:00 UTC image data may be unavailable or incomplete. |
Status: | scheduled |
Issue Time: | 2021-02-17 14:47:24.0 |
Services: |
RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 6784 |
Rev: | 2 |
Start Time: | 2021-03-16 16:30:00.0 |
End Time: | 2021-03-23 15:00:00.0 |
Satellites: | GOES-16 |
Subject: | instrument-maintenance |
Impact: | data-unavailable |
Detail: | NOAA will perform testing of GOES-16 GLM products. Multiple 60 min outages and one 24 hour degraded product period can be expected. The outages and degradation periods are listed below. Outages: March 16 16:30-17:30 UTC, March 17 04:36-05:36 UTC, March 17 16:30-17:30 UTC, March 18 04:36-05:36 UTC, March 18 16:30-17:30 UTC, March 19 04:36-05:36 UTC, GLM degraded radiometric data: March 22 15:00 UTC to March 23 15:00 UTC. [Rev. 2] The GLM test has been postponed by NOAA due to Critical Weather Day. New dates and times will be provided in due course. |
Status: | postponed |
Issue Time: | 2021-03-17 16:45:23.0 |
Services: |
GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 6792 |
Rev: | 1 |
Start Time: | 2021-03-20 02:00:00.0 |
End Time: | 2021-03-20 08:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Athens Station data line maintenance. There may be disruption to all imager based services. |
Status: | scheduled |
Issue Time: | 2021-03-10 15:08:14.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-VIIRS EARS-NWC EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 6813 |
Rev: | 1 |
Start Time: | 2021-03-22 10:00:00.0 |
End Time: | 2021-03-24 17:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Kangerlussuaq Core Station Maintenance. There may be disruption to all imager based services on the following days: 22 March and 24 March 2021, both days between 10:00 and 17:00 UTC. |
Status: | scheduled |
Issue Time: | 2021-03-17 16:52:05.0 |
Services: |
EARS-ATOVS EARS-IASI EARS-AVHRR EARS-ATMS EARS-CrlS EARS-VIIRS EARS-ASCAT EARS-NWC EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 6814 |
Rev: | 1 |
Start Time: | 2021-03-22 17:10:00.0 |
End Time: | 2021-03-22 18:10:00.0 |
Satellites: | Metop-B |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | McMurdo Critical Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period. |
Status: | scheduled |
Issue Time: | 2021-03-17 16:01:17.0 |
Services: |
AVHRR Level 1 - Metop-B SEM L0 - Metop-B MHS Level 1 - Metop-B AMSU-A Level 1 - Metop-B ASCAT Level 1 - Metop-B HIRS Level 1 - Metop-B IASI Level 1 - Metop-B GRAS Level 1 - Metop-B GOME-2 Level 1 - Metop-B IASI Sounding Products - Metop-B ATOVS Sounding products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B Multi-Metop Wind Products |
Type: | Planned Maintenance |
Ann Nr: | 6819 |
Rev: | 1 |
Start Time: | 2021-03-23 00:00:00.0 |
End Time: | 2021-03-25 00:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | KSAT Svalbard link upgrade. Data interruptions might be observed during the maintenance period. |
Status: | scheduled |
Issue Time: | 2021-03-17 16:28:57.0 |
Services: |
SEM L0 - Metop-A AVHRR Level 1 - Metop-A AMSU-A Level 1 - Metop-A ASCAT Level 1 - Metop-A MHS Level 1 - Metop-A HIRS Level 1 - Metop-A IASI Level 1 - Metop-A GRAS Level 1 - Metop-A GOME-2 Level 1 - Metop-A ATOVS Sounding products - Metop-A IASI Sounding Products - Metop-A AVHRR Polar Winds - Metop-A ASCAT Soil Moisture - Metop-A Multi-Sensor Products - Metop-A SEM L0 - Metop-B AMSU-A Level 1 - Metop-B AVHRR Level 1 - Metop-B MHS Level 1 - Metop-B ASCAT Level 1 - Metop-B HIRS Level 1 - Metop-B IASI Level 1 - Metop-B GOME-2 Level 1 - Metop-B GRAS Level 1 - Metop-B ATOVS Sounding products - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B SEM L0 - Metop-C AVHRR Level 1 - Metop-C AMSU-A Level 1 - Metop-C IASI Sounding products- Metop-C ASCAT Soil Moisture - Metop-C AVHRR Polar winds - Metop-C MHS Level 1 - Metop-C Multi-sensor Products - Metop-C ASCAT Level 1 - Metop-C IASI Level 1 - Metop-C GOME-2 Level 1 - Metop-C GRAS Level 1 - Metop-C Multi-Metop Wind Products |
Type: | Planned Maintenance |
Ann Nr: | 6791 |
Rev: | 2 |
Start Time: | 2021-03-23 07:00:00.0 |
End Time: | 2021-03-23 17:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Lannion Core Station 1st Antenna Chain MEOS server Upgrade. There may be disruption to all imager based services. The following satellites data will be affected: Metop, FY3D, NOAA-20 and Suomi-NPP. [Rev. 2] Date updated |
Status: | scheduled |
Issue Time: | 2021-03-12 14:26:17.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-VIIRS EARS-NWC EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 6809 |
Rev: | 1 |
Start Time: | 2021-03-23 08:31:00.0 |
End Time: | 2021-03-23 08:38:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-03-17 15:21:10.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 6808 |
Rev: | 1 |
Start Time: | 2021-03-23 08:52:00.0 |
End Time: | 2021-03-23 08:59:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-03-17 15:20:17.0 |
Services: |
SEM AHRPT Metop-A SEM L0 - Metop-A |
Type: | Service Enhancement |
Ann Nr: | 6794 |
Rev: | 1 |
Start Time: | 2021-03-23 09:00:00.0 |
End Time: | 2021-03-23 09:00:00.0 |
Subject: | new-product |
Detail: | Roshydromet Meteor-M N2 IKFS-2 Level 1 data will be available on EUMETCast. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/meteor-m-n2-data-on-eumetcast |
Status: | scheduled |
Issue Time: | 2021-03-11 08:26:35.0 |
Services: |
Meteor-M N2 Products |
Type: | Planned Maintenance |
Ann Nr: | 6810 |
Rev: | 1 |
Start Time: | 2021-03-23 09:25:00.0 |
End Time: | 2021-03-23 09:32:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-03-17 15:22:05.0 |
Services: |
SEM AHRPT Metop-C SEM L0 - Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 6822 |
Rev: | 1 |
Start Time: | 2021-03-23 14:00:00.0 |
End Time: | 2021-03-23 20:00:00.0 |
Satellites: | GOES-16,GOES-17 |
Subject: | ground-segment-maintenance |
Impact: | data-unavailable |
Detail: | Due to ground system database updates at NOAA side, all GOES-16 and GOES-17 products will not be available in the given time frame. |
Status: | scheduled |
Issue Time: | 2021-03-18 13:12:42.0 |
Services: |
GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 6815 |
Rev: | 1 |
Start Time: | 2021-03-23 23:30:00.0 |
End Time: | 2021-03-26 23:45:00.0 |
Satellites: | Metop-B |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | McMurdo MG1 Critical Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during the maintenance periods: On 23 March 2030-2130z and 2215-2315z, on 24 March 2021 0130-0230z and 2130-2230z, on 25 March 0100-0200z, 0230-0330z and 1930-2330z, and on 26 March 1930-2030z, 2115-2215z and 2245-2345z. |
Status: | scheduled |
Issue Time: | 2021-03-17 16:15:36.0 |
Services: |
SEM L0 - Metop-B AMSU-A Level 1 - Metop-B AVHRR Level 1 - Metop-B HIRS Level 1 - Metop-B MHS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GRAS Level 1 - Metop-B GOME-2 Level 1 - Metop-B ATOVS Sounding products - Metop-B ASCAT Soil Moisture - Metop-B IASI Sounding Products - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B Multi-Metop Wind Products |
Type: | Planned Maintenance |
Ann Nr: | 6820 |
Rev: | 2 |
Start Time: | 2021-03-24 00:00:00.0 |
End Time: | 2021-03-26 00:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | Fucino Ground Station data link upgrade. Interruptions might be observed during the maintenance period. [Rev. 2] Activity cancelled. |
Status: | scheduled |
Issue Time: | 2021-03-24 09:34:47.0 |
Services: |
RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 6816 |
Rev: | 1 |
Start Time: | 2021-03-24 09:00:00.0 |
End Time: | 2021-03-24 09:00:00.0 |
Satellites: | NOAA-20 |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-03-17 16:07:44.0 |
Services: |
ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 6817 |
Rev: | 1 |
Start Time: | 2021-03-24 09:00:00.0 |
End Time: | 2021-03-24 09:00:00.0 |
Satellites: | Suomi NPP |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-03-17 16:08:07.0 |
Services: |
ATMS Level 1 - JPSS CrIS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 6821 |
Rev: | 1 |
Start Time: | 2021-03-24 10:00:00.0 |
End Time: | 2021-03-24 12:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | Maintenance activity affecting all Third-Party data (except NOAA data) for which possible delays can be expected during the indicated time period. In addition, the filenames of GPM-Core GMI L1 BUFR data will be updated to include seconds, to comply with the WMO format, e.g.: Old filename: W_XX-EUMETSAT-Darmstadt,SOUNDING+SATELLITE,GPM+GMI+S1_C_EUMP_202103120950_095019_095517_L1C.bin. New filename: W_XX-EUMETSAT-Darmstadt,SOUNDING+SATELLITE,GPM+GMI+S1_C_EUMP_20210312095000_095019_095517_L1C.bin. |
Status: | scheduled |
Issue Time: | 2021-03-18 08:19:59.0 |
Services: |
GOES Products Himawari Products FY-2 Products FY-4 Products ELECTRO-L N2 INSAT-3D Products MODIS Products SSMIS Products Oceansat-2 Products SARAL Products Megha-Tropiques Products FY-3 Products Meteor-M N2 Products Multimission Regional Products SMOS Products GCOM-W1 AMSR-2 Products GPM-Core GMI Products SMAP Products VIIRS Fire Product Aeolus Level 2 Products |
Type: | Planned Maintenance |
Ann Nr: | 6751 |
Rev: | 3 |
Start Time: | 2021-03-24 12:48:00.0 |
End Time: | 2021-03-24 12:49:00.0 |
Satellites: | Metop-C |
Subject: | in-plane-manoeuvre |
Impact: | data-degraded |
Detail: | Routine in-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre. [Rev. 2]: Manoeuvre Execution time updated. Burn time: 12:48:59 UTC. Duration: 1.352 seconds. [Rev. 3] Details updated to reflect the outages per instrument: SEM from 7:43 to 13:31 UTC and GOME from 12:39 to 14:21 UTC. |
Status: | scheduled |
Issue Time: | 2021-03-24 09:21:24.0 |
Services: |
SEM L0 - Metop-C AVHRR Level 1 - Metop-C AMSU-A Level 1 - Metop-C MHS Level 1 - Metop-C ASCAT Level 1 - Metop-C IASI Level 1 - Metop-C GRAS Level 1 - Metop-C GOME-2 Level 1 - Metop-C A-DCS AHRPT Metop-C AMSU-A AHRPT Metop-C ASCAT AHRPT Metop-C AVHRR AHRPT Metop-C GOME-2 AHRPT Metop-C HIRS AHRPT Metop-C GRAS AHRPT Metop-C IASI AHRPT Metop-C SEM AHRPT Metop-C MHS AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 6805 |
Rev: | 1 |
Start Time: | 2021-03-26 03:10:00.0 |
End Time: | 2021-03-26 03:20:00.0 |
Satellites: | GOES-17 |
Subject: | instrument-calibration |
Detail: | A GOES-17 ABI solar calibration scan is planned on 26 March 2021 between 0315 UTC and 0320 UTC. GOES-17 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G17_s20210850315[SSS]_e20210850320[SSS]_c202108503[mmssSSS]-129601_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 03:20 UTC. |
Status: | scheduled |
Issue Time: | 2021-03-16 09:02:10.0 |
Services: |
GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 6806 |
Rev: | 1 |
Start Time: | 2021-03-26 20:00:00.0 |
End Time: | 2021-03-26 20:10:00.0 |
Satellites: | GOES-17 |
Subject: | instrument-calibration |
Detail: | A GOES-17 ABI routine desert monitoring calibration scan is planned on 26 March 2021 between 20:00 UTC and 20:10 UTC. GOES-17 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G17_s20210852005[SSS]_e20210852010[SSS]_c202108520[mmssSSS]-129601_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 20:10 UTC |
Status: | scheduled |
Issue Time: | 2021-03-16 09:02:33.0 |
Services: |
GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 6811 |
Rev: | 1 |
Start Time: | 2021-03-27 04:27:00.0 |
End Time: | 2021-03-27 11:21:00.0 |
Satellites: | Metop-B |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | External Calibration. Lunar acquisition. CS2 campaign. |
Status: | scheduled |
Issue Time: | 2021-03-17 15:26:16.0 |
Services: |
IASI Sounding Products - Metop-B IASI Level 1 - Metop-B EARS-IASI IASI AHRPT Metop-B OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6812 |
Rev: | 1 |
Start Time: | 2021-03-27 05:21:00.0 |
End Time: | 2021-03-27 12:15:00.0 |
Satellites: | Metop-C |
Subsystem: | IASI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | External Calibration. Lunar acquisition. CS2 campaign. |
Status: | scheduled |
Issue Time: | 2021-03-17 15:26:23.0 |
Services: |
IASI Level 1 - Metop-C IASI Sounding products- Metop-C EARS-IASI IASI AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6824 |
Rev: | 1 |
Start Time: | 2021-03-30 09:04:00.0 |
End Time: | 2021-03-30 09:06:00.0 |
Satellites: | Sentinel-3A |
Subsystem: | OLCI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | |
Status: | scheduled |
Issue Time: | 2021-03-22 12:32:45.0 |
Services: |
OLCI Level 1 Products - S3A OLCI Level 2 Marine Products - S3A |
Type: | Service Enhancement |
Ann Nr: | 6818 |
Rev: | 1 |
Start Time: | 2021-04-08 09:00:00.0 |
End Time: | 2021-04-08 09:00:00.0 |
Subject: | product-change |
Detail: | Update to Copernicus Sentinel-3 SRAL Level-2P Wave product, with the inclusion of a new wind variable. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/update-sentinel-3-sral-level-2-wave-product |
Status: | scheduled |
Issue Time: | 2021-03-17 18:15:41.0 |
Services: |
SRAL L2P Marine Products - S3A SRAL L2P Marine Products - S3B |
Type: | Service Enhancement |
Ann Nr: | 6807 |
Rev: | 1 |
Start Time: | 2021-05-03 09:00:00.0 |
End Time: | 2021-05-07 14:00:00.0 |
Subject: | general-announcement |
Detail: | Test activation of the backup satellite, HOTBIRD 13C, for the EUMETCast Europe service. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/eumetcast-europe-backup-satellite-activation |
Status: | scheduled |
Issue Time: | 2021-03-17 14:07:41.0 |
Services: |
EUMETCast-Europe |
Type: | Service Enhancement |
Ann Nr: | 6676 |
Rev: | 2 |
Start Time: | 2021-05-18 09:00:00.0 |
End Time: | 2021-05-18 09:00:00.0 |
Subject: | product-change |
Detail: | GOME-2 Level 1 Product Processing Facility (PPF) Version 7 is planned to be released early April 2021. Exact date will be communicated in due course. For full details and test data, see the URL provided below. [Rev. 2]: The release is postponed to the second half of May 2021, with exact date to be communicated in due course. |
Url: | https://www.eumetsat.int/upcoming-release-gome-2-level-1-ppf-v7 |
Status: | scheduled |
Issue Time: | 2021-03-11 08:16:29.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 Level 1 - Metop-B GOME-2 Level 1 - Metop-C |
Name: | EUMETSAT |
Address: |
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |