Topic: Weekly Operations Schedule - Week 5
Date/Time Issued: January 29, 2021 1410Z
Product(s) or Data Impacted: See list below.
Date/Time of Initial Impact: January 29, 2021 1318Z (from the Eumetsat Weekly Operations Schedule message)
Date/Time of Expected End: See table in detail for on and off switch time
Length of Outage: N/A
Message number: 7609
Message creation: Fri Jan 29 13:18:19 UTC 2021
Type: Planned Maintenance
Ann Nr: 5475
Rev: 10
Start Time: 2020-01-06 00:00:00.0
End Time: 2021-04-01 00:00:00.0
Satellites: Metop-A
Subsystem: ASCAT
Subject: general-announcement
Impact: risk-of-interruption
Detail: Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. [Rev. 3] End date updated to 19th April 2020.[Rev. 4] End date updated. [Rev. 5] End date updated. [Rev. 6] End date updated. [Rev 7] End date updated. [Rev 8] End date updated. [Rev 9] End date updated. [Rev. 10] End date updated.
Status: scheduled
Issue Time: 2020-11-27 12:17:02.0
Services: ASCAT Soil Moisture - Metop-A
ASCAT Level 1 - Metop-A
Type: Planned Maintenance
Ann Nr: 5596
Rev: 1
Start Time: 2020-01-29 00:00:00.0
End Time: 2021-12-31 23:59:00.0
Satellites: Metop-A
Subsystem: HRPT
Subject: general-announcement
Impact: data-unavailable
Detail: HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates.
Status: scheduled
Issue Time: 2020-02-03 10:12:03.0
Services: A-DCS AHRPT Metop-A
ASCAT AHRPT Metop-A
AMSU-A AHRPT Metop-A
AVHRR AHRPT Metop-A
IASI AHRPT Metop-A
HIRS AHRPT Metop-A
GRAS AHRPT Metop-A
MHS AHRPT Metop-A
GOME-2 AHRPT Metop-A
SEM AHRPT Metop-A
Type: Service Enhancement
Ann Nr: 6259
Rev: 1
Start Time: 2020-09-15 00:00:00.0
End Time: 2021-05-15 00:00:00.0
Satellites: NOAA-15,NOAA-19
Subsystem: AVHRR
Subject: general-announcement
Detail: NESDIS Office of Satellite and Product Operations (OSPO) engineers will activate switching for NOAA-15 and NOAA-19 AVHRR Channel 3A / 3B for the period of 15 September 2020 to 14 May 2021. Switching to Channel 3A will occur during this period over the predefined box encompassing the Alaska Region (box coordinates 50°N to 75°N and 173°E to 135°W). NOAA-15 and NOAA-19 AVHRR will switch between Channel 3B and Channel 3A to support snow and ice detection and monitoring activities over Alaska Region. For more details please refer to the URL link below.
Status: scheduled
Issue Time: 2020-09-15 10:11:37.0
Services: AVHRR Level 1 - NOAA
EARS-AVHRR
Type: Service Enhancement
Ann Nr: 6622
Rev: 1
Start Time: 2021-01-14 09:00:00.0
End Time: 2021-02-10 09:00:00.0
Subject: general-announcement
Detail: Survey on EUMETSAT's Data Collection Service (DCS) Web Service. If you are a user of this service, we would like to know more about your current use of the DCS and the needs and suggestions you would have for an enhanced DCS Web Service. To access the survey, see the URL provided below.
Status: scheduled
Issue Time: 2021-01-14 14:59:02.0
Services:
Type: Service Enhancement
Ann Nr: 6677
Rev: 1
Start Time: 2021-01-28 09:00:00.0
End Time: 2021-01-28 09:00:00.0
Subject: general-announcement
Detail: Release of simulated EPS-SG Microwave Imager (MWI) and Ice Cloud Imager (ICI) Level 1 and Level 2 test data, for user familiarisation. For full details, see the URL provided below.
Status: scheduled
Issue Time: 2021-01-28 13:23:34.0
Services:
Type: Planned Maintenance
Ann Nr: 6669
Rev: 1
Start Time: 2021-02-01 02:55:00.0
End Time: 2021-02-01 18:06:00.0
Satellites: Metop-B
Subsystem: IASI
Subject: instrument-calibration
Impact: data-unavailable
Detail: External Calibration. (Moon Intrusion).
Status: scheduled
Issue Time: 2021-01-27 15:40:04.0
Services: IASI Level 1 - Metop-B
IASI Sounding Products - Metop-B
EARS-IASI
IASI AHRPT Metop-B
OSI SAF - Products
Type: Planned Maintenance
Ann Nr: 6672
Rev: 1
Start Time: 2021-02-01 03:49:00.0
End Time: 2021-02-01 18:55:00.0
Satellites: Metop-C
Subsystem: IASI
Subject: instrument-calibration
Impact: data-unavailable
Detail: External Calibration. (Moon Intrusion).
Status: scheduled
Issue Time: 2021-01-28 10:50:50.0
Services: IASI Sounding products- Metop-C
IASI Level 1 - Metop-C
IASI AHRPT Metop-C
EARS-IASI
OSI SAF - Products
Type: Planned Maintenance
Ann Nr: 6649
Rev: 1
Start Time: 2021-02-01 07:00:00.0
End Time: 2021-02-04 16:00:00.0
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: Athens EARS Core Station Upgrade Maintenance between 01 and 04 February 2021, each day between 07:00 and 16:00 UTC. There may be disruption to all Athens acquired EARS services during the indicated maintenance period.
Status: scheduled
Issue Time: 2021-01-20 15:46:47.0
Services: EARS-ATOVS
EARS-AVHRR
EARS-ASCAT
EARS-IASI
EARS-ATMS
EARS-CrlS
EARS-VIIRS
EARS-NWC
EARS-VASS
EARS-MERSI
Type: Service Enhancement
Ann Nr: 6480
Rev: 1
Start Time: 2021-02-01 09:00:00.0
End Time: 2021-02-01 09:00:00.0
Subject: service-change
Detail: From 01/02/2021, the EUMETCast Europe restoration (back-up) capacity will be migrated from EUTELSAT 21B to Hotbird 13. For full details, see the URL provided below.
Status: scheduled
Issue Time: 2020-11-26 11:53:37.0
Services: EUMETCast-Europe
Type: Planned Maintenance
Ann Nr: 6679
Rev: 1
Start Time: 2021-02-01 11:50:00.0
End Time: 2021-02-01 15:50:00.0
Satellites: Metop-B
Subject: ground-segment-maintenance
Impact: data-delayed
Detail: McMurdo Black Island Critical Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period.
Status: scheduled
Issue Time: 2021-01-29 08:53:13.0
Services: SEM L0 - Metop-B
AVHRR Level 1 - Metop-B
AMSU-A Level 1 - Metop-B
MHS Level 1 - Metop-B
HIRS Level 1 - Metop-B
ASCAT Level 1 - Metop-B
IASI Level 1 - Metop-B
GRAS Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
ATOVS Sounding products - Metop-B
IASI Sounding Products - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
Multi-Metop Wind Products
Type: Planned Maintenance
Ann Nr: 6668
Rev: 1
Start Time: 2021-02-01 14:53:00.0
End Time: 2021-02-01 15:00:00.0
Satellites: Metop-B
Subsystem: ASCAT
Subject: instrument-calibration
Impact: data-unavailable
Detail: Gain Compression
Status: scheduled
Issue Time: 2021-01-27 15:32:57.0
Services: ASCAT Level 1 - Metop-B
ASCAT Soil Moisture - Metop-B
EARS-ASCAT
ASCAT AHRPT Metop-B
OSI SAF - Products
Type: Planned Maintenance
Ann Nr: 6650
Rev: 1
Start Time: 2021-02-02 08:00:00.0
End Time: 2021-02-02 13:00:00.0
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: EARS Moscow Contributing Station Data line Maintenance. There is potential interruption to product generation from Moscow station during the indicated time period.
Status: scheduled
Issue Time: 2021-01-20 15:46:28.0
Services: EARS-ATOVS
EARS-AVHRR
EARS-IASI
EARS-ATMS
EARS-CrlS
EARS-NWC
Type: Planned Maintenance
Ann Nr: 6666
Rev: 1
Start Time: 2021-02-02 08:45:00.0
End Time: 2021-02-02 08:52:00.0
Satellites: Metop-B
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2021-01-29 09:04:12.0
Services: SEM L0 - Metop-B
SEM AHRPT Metop-B
Type: Planned Maintenance
Ann Nr: 6663
Rev: 1
Start Time: 2021-02-02 09:00:00.0
End Time: 2021-03-04 09:00:00.0
Satellites: MET-10
Subject: monthly-RSS-interruption
Impact: data-unavailable
Detail: Monthly interruption. Meteosat-10 Rapid Scanning Service (RSS) will be suspended for scheduled Full Earth Scanning and Ground Segment Maintenance. No gap-filling will be provided.
Status: scheduled
Issue Time: 2021-01-27 15:26:28.0
Services: RSS SEVIRI Level 1.5 Image Data
RSS Meteosat Meteorological Products
Type: Planned Maintenance
Ann Nr: 6664
Rev: 1
Start Time: 2021-02-02 09:11:00.0
End Time: 2021-02-02 09:18:00.0
Satellites: Metop-A
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2021-01-27 15:28:37.0
Services: SEM L0 - Metop-A
SEM AHRPT Metop-A
Type: Planned Maintenance
Ann Nr: 6670
Rev: 1
Start Time: 2021-02-02 09:39:00.0
End Time: 2021-02-02 09:46:00.0
Satellites: Metop-C
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2021-01-29 09:12:40.0
Services: SEM L0 - Metop-C
SEM AHRPT Metop-C
Type: Planned Maintenance
Ann Nr: 6671
Rev: 1
Start Time: 2021-02-02 09:39:00.0
End Time: 2021-02-02 11:22:00.0
Satellites: Metop-C
Subsystem: SEM
Component: TED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM TED in flight calibration.
Status: scheduled
Issue Time: 2021-01-27 15:37:11.0
Services: SEM L0 - Metop-C
SEM AHRPT Metop-C
Type: Planned Maintenance
Ann Nr: 6660
Rev: 1
Start Time: 2021-02-03 07:55:00.0
End Time: 2021-02-03 08:29:00.0
Satellites: Sentinel-3B
Subject: out-of-plane-manoeuvre
Impact: data-degraded
Detail: Reduced data quality for SRAL should be expected for data sensed during this period. Reduced data quality for SLSTR can be expected from approximately 07:45 to 10:15
Status: scheduled
Issue Time: 2021-01-27 15:26:03.0
Services: SLSTR Level 1 Products - S3B
SLSTR Level 2 Marine Products - S3B
SLSTR Level 2 Atmospheric Products - S3B
SRAL Level 1 Products - S3B
SRAL Level 2 Marine Products - S3B
Type: Planned Maintenance
Ann Nr: 6662
Rev: 1
Start Time: 2021-02-03 08:45:00.0
End Time: 2021-02-16 09:45:00.0
Satellites: MET-8
Subject: Sun-colinearity
Impact: risk-of-degradation
Detail: Sun Co-linearity. Repeat cycles 08:45 to 09:45 may be affected.
Status: scheduled
Issue Time: 2021-01-27 16:13:31.0
Services: IODC Meteosat Meteorological Products
IODC SEVIRI Level 1.5 Image Data
Type: Service Enhancement
Ann Nr: 5159
Rev: 7
Start Time: 2021-02-03 10:00:00.0
End Time: 2021-02-03 10:00:00.0
Subject: product-change
Detail: A new BUFR encoding sequence will be introduced in June 2020 for all EUMETSAT’s wind products. For full details and sample files, see the URL provided below. [Rev. 2]: Date changed to 7 October 2020. To facilitate user transition, AMV products encoded in the new BUFR sequence will be distributed on the GTS in parallel to the currently operational AMV products, from 15 July until 6 October 2020. For full details, see the URL provided below. [Rev. 3]: Date changed to mid-January 2021. Exact date will be announced in due course. Periods of parallel dissemination on the GTS have also been updated. For full details, see the URL provided below. [Rev. 4]: Dates of parallel dissemination on the GTS have been updated for the AMV products from Meteosat-8 and Meteosat-11. For full details, see the URL provided below. [Rev. 5]: Date updated to 20 January 2021. [Rev. 6]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 7] The operational switch to the new BUFR encoding sequence is being deferred from 20 January to 3 February 2021. For Meteosat AMV products, the switch will take place around 10:00 UTC. This means that the 09:45 UTC products will still have the 'old' BUFR format and the products from 10:45 UTC onwards will be in the new format. The switch-over time for the Metop products will be announced closer to the date.
Status: scheduled
Issue Time: 2021-01-14 15:33:06.0
Services: 0° Meteosat Meteorological Products
RSS Meteosat Meteorological Products
IODC Meteosat Meteorological Products
AVHRR Polar Winds - Metop-A
AVHRR Polar Winds - Metop-B
AVHRR Polar winds - Metop-C
Multi-Metop Wind Products
Type: Service Enhancement
Ann Nr: 6269
Rev: 3
Subject: service-change
Detail: Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data will be removed from EUMETCast Satellite on 29 July 2021. Alternative services to access these data are available. For full details, see the URL provided below. [Rev. 2]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 3]: The removal of Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite, initially planned for 29 July 2021, is being deferred to a later date (likely to be during the last quarter of 2021). This is to allow more time for users to transition to alternative access services.
Status: scheduled
Issue Time: 2021-01-26 16:03:54.0
Services: OLCI Level 1 Products - S3A
OLCI Level 1 Products - S3B
Type: Planned Maintenance
Ann Nr: 6674
Rev: 1
Start Time: 2021-02-04 00:42:00.0
End Time: 2021-02-04 00:42:00.0
Satellites: Jason-3
Subject: in-plane-manoeuvre
Impact: data-degraded
Detail: Station keeping manoeuvre. The semi-major axis will be increased by 9.5 m (TBC) resulting in radial orbit errors in the OGDRs. OGDR products may be degraded 30 minutes before and up to 2 hours after the manoeuvre. This will affect the sea surface height, but not the wind and wave content in the products. The exact change of the semi-major axis will be known a few days before the manoeuvre.
Status: scheduled
Issue Time: 2021-01-27 16:28:22.0
Services: Jason-3 OGDR
Type: Service Enhancement
Ann Nr: 6652
Rev: 1
Start Time: 2021-02-04 09:00:00.0
End Time: 2021-02-04 09:00:00.0
Subject: new-product
Detail: New Copernicus Sentinel-3 Normalised Difference Vegetation Index (NDVI) product at 300 m resolution, generated by VITO, to be available on EUMETCast. For full details, see the URL provided below.
Status: scheduled
Issue Time: 2021-01-21 14:59:41.0
Services: Copernicus Global Land service
Type: Planned Maintenance
Ann Nr: 6661
Rev: 1
Start Time: 2021-02-04 20:30:00.0
End Time: 2021-03-29 23:00:00.0
Satellites: MET-8
Subject: eclipse-season
Impact: risk-of-degradation
Detail: There is a risk of degraded image quality every night from 20:30 to 23:00 in the given time period.
Status: scheduled
Issue Time: 2021-01-27 15:19:27.0
Services: IODC SEVIRI Level 1.5 Image Data
IODC Meteosat Meteorological Products
Type: Planned Maintenance
Ann Nr: 6665
Rev: 1
Start Time: 2021-02-05 18:17:00.0
End Time: 2021-02-05 19:16:00.0
Satellites: Metop-A
Subsystem: GOME-2
Subject: instrument-calibration
Impact: data-unavailable
Detail: GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable.
Status: scheduled
Issue Time: 2021-01-27 15:29:40.0
Services: GOME-2 Level 1 - Metop-A
GOME-2 AHRPT Metop-A
AC SAF - Products
Type: Planned Maintenance
Ann Nr: 6667
Rev: 1
Start Time: 2021-02-05 19:44:00.0
End Time: 2021-02-05 20:43:00.0
Satellites: Metop-B
Subsystem: GOME-2
Subject: instrument-calibration
Impact: data-unavailable
Detail: GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable.
Status: scheduled
Issue Time: 2021-01-27 15:32:04.0
Services: GOME-2 Level 1 - Metop-B
AC SAF - Products
GOME-2 AHRPT Metop-B
Type: Planned Maintenance
Ann Nr: 6673
Rev: 1
Start Time: 2021-02-06 06:00:00.0
End Time: 2021-02-28 12:00:00.0
Satellites: GOES-17
Subject: instrument-special-operation
Impact: risk-of-interruption
Detail: NOAA will conduct a GOES-West ABI Cooling Timeline Operation from 06 to 28 February 2021, every day from 06:00 to 12:00 UTC. During this phase, GOES-17 operations mode will change from MODE 6 to MODE 3, and this will affect the GOES-West ABI Level 1B data distribution on EUMETCast. For full details, see the URL provided below. Users wishing to receive the MODE 3 data should contact our User Helpdesk at
ops@eumetsat.int.
Status: scheduled
Issue Time: 2021-01-28 11:08:06.0
Services: GOES Products
Type: Planned Maintenance
Ann Nr: 6675
Rev: 1
Start Time: 2021-02-24 09:00:00.0
End Time: 2021-02-24 09:00:00.0
Satellites: Metop-A
Subsystem: GOME-2
Subject: instrument-special-operation
Impact: data-unavailable
Detail: Metop-A Technology Test. GOME special calibration. One orbit outage is expected on that day.
Status: scheduled
Issue Time: 2021-01-29 13:11:50.0
Services: GOME-2 Level 1 - Metop-A
GOME-2 AHRPT Metop-A
AC SAF - Products
Type: Service Enhancement
Ann Nr: 6676
Rev: 1
Start Time: 2021-04-01 09:00:00.0
End Time: 2021-04-01 09:00:00.0
Subject: product-change
Detail: GOME-2 Level 1 Product Processing Facility (PPF) Version 7 is planned to be released early April 2021. Exact date will be communicated in due course. For full details and test data, see the URL provided below.
Status: scheduled
Issue Time: 2021-01-27 16:49:11.0
Services: GOME-2 Level 1 - Metop-A
GOME-2 Level 1 - Metop-B
GOME-2 Level 1 - Metop-C
Name: EUMETSAT
Address: Eumetsat-Allee 1
D-64295 Darmstadt
Germany
Telephone: +49 6151 807 3660/3770
Fax: +49 6151 807 3790
You are receiving this email because you are subscribed to our User Notification Service (UNS). You can modify your UNS subscriptions or unsubscribe at any time via our UNS web interface (login to our Earth Observation Portal required).
Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.